Original disclosure · 9 Jun 2026: Operator-announced SpaceX Falcon 9 rideshare route for the planned 2027 Pathfinder hosted GPU demonstration.
The official release and current operator roadmap name the launch vehicle and 2027 target. This records an intended provider, not a signed launch contract, booked mission, exact launch date, delivered service or the identity of the payload host. No procurement buyer or price is disclosed.
Singulus Technologies will deliver a turnkey production line for heterojunction solar cells used by SpaceX Starmind satellites, with the first line due in the first half of 2027 and additional lines planned
NVIDIA's announcement identifies the planned architecture. Orbital deployment, final configuration, quantity and contract value are not established. Terrestrial Grok infrastructure is outside this relationship.
Carrier launch and subsequent October 14 deployment are supported. No direct TM2S–SpaceX contract, spacecraft contact or computing result is established.
Capacity was secured through Maverick for this shared mission. No separate direct Kepler-SpaceX contract or value is disclosed. Distinct from the January2026 Tranche 1 launch.
SpaceX Bandwagon-6 named for the joint LizzieSat-4 and LizzieSat-5 launch, targeted no earlier than April 2027; supersedes the Transporter-18 plan for LizzieSat-5.
Named future launch-provider role, subject to qualification, integration and rideshare readiness. The source does not establish the direct legal buyer, price or completed launch. The original June role announcement predates the September 28 schedule revision.
Historical operator-post record of an order for optical terminals. The September 30 audit could not reread the original post because access returned HTTP403; the exact quantity and fleet scope remain subject to primary-source revalidation. Contract value, delivery cadence and first equipped spacecraft are undisclosed. The one-year orbital timing was an expectation, not delivery evidence.
Launch role is established. Direct contracting party and price are not disclosed. The ESA source establishes launch participation but does not disclose an EDGX launch contract or order. This record is excluded from contract-record totals.
Delivered launch-provider role; the direct purchasing entity, booking intermediary, award date and price are not established. Announcement date follows the launch release.
KSAT confirms the signed launch contract and a late-2027 target; contract value and exact launch date are not disclosed. Hyperion association is explicitly corroborated in KSAT’s June 2026 account.
Issuer-reported manifested payload and carrier launch, not a separately disclosed procurement contract. Legal buyer, price and signature date are unknown. June 24 is the announcement date and June 23 the launch date. The article does not establish successful payload commissioning or experimental results.
Sixteen launch ports across multiple upcoming SpaceX Transporter rideshare missions for D-Orbit's orbital delivery, operations and hosted demonstration services.
The agreement secures capacity across multiple missions. Individual ports are not assigned to specific compute payloads, and the announcement does not establish that all contracted launches have occurred.
These are launch ports, not eleven computing nodes. Procurement was through Impulso Space; no direct SpaceX price or executed computing service is disclosed. The 2025 sixteen-port contract is separate.