SignalSpore

SPACE DATA CENTERS
SUPPLIER INTELLIGENCE

SPACE COMPUTINGOrbital and lunar data centers
← All projects

United States · Shared onboard computing and software hosting

Rogue Scalable Compute Platform

Rogue offers shared computing for customer software aboard its OTP-2 satellite. Its GPU-accelerated Scalable Compute Platform runs separately from the flight computer and supports remote software updates. A Gen 3 version is planned for OTP-2B.

Rogue Space SystemsOperatingGen 2 operating, Gen 3 mission planned

Scope: Shared computing & storage · The platform hosts software from multiple customers and supports shared orbital processing.

Technical overview

Compare technical specifications →

Compute throughput
21 TOPS · INT8 statedRogue OTP-2 with SCP Gen 2Launched hardware specification
Notes & source

Configuration: SCP Gen 2 INT8 AI rating

Rogue's hardware rating is for INT8 arithmetic on the Gen 2 platform. It is not an orbital benchmark.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
248 TOPS · Arithmetic precision not specifiedrogue-otp2b-gen3-plannedPlanned specification · Q1 2027 launch target
Notes & source

Configuration: OTP-2B Gen 3 SCP AI rating

Operator-rated AI throughput for the planned Gen 3 configuration. Arithmetic precision, sparsity, chip model and operating condition are unspecified. No orbital benchmark is reported.

Evidence basis: Planned specification · Q1 2027 launch target

Source / observation date: .

Supporting source ↗
Compute hardware
GPU-accelerated compute layer separate from the flight computerSCP platform architectureOperator-reported architecture
Notes & source

Configuration: SCP platform architecture

Supports onboard data processing, autonomous operations and LLM inference. No processor model or numerical workload result is assigned.

Evidence basis: Operator-reported architecture

Source / observation date: .

Supporting source ↗
Six-core ARMv8.2 CPU, 384 CUDA cores and 28 tensor coresrogue-otp2-gen2Published specification for Gen 2 flight hardware
Notes & source

Configuration: SCP Gen 2 compute module

Rogue lists these for the Gen 2 module aboard OTP-2. It does not name the processor or accelerator part number.

Evidence basis: Published specification for Gen 2 flight hardware

Source / observation date: .

Supporting source ↗
NVIDIA GPU/CPU architecture, SCP Gen 3rogue-otp2b-gen3-plannedPlanned architecture
Notes & source

Configuration: rogue-otp2b-gen3-planned

NVIDIA is named without an installed chip model or count. Earlier platform flight heritage is not evidence of Gen 3 deployment.

Evidence basis: Planned architecture

Source / observation date: .

Supporting source ↗
Complete payload electrical power
Below 30 W peakSCP Gen 2 compute modulePublished specification for Gen 2 flight hardware
Notes & source

Configuration: SCP Gen 2 compute module

This is peak power for the complete SCP Gen 2 computing module. It is not processor-only power, average in-orbit power or total satellite demand.

Evidence basis: Published specification for Gen 2 flight hardware

Source / observation date: .

Supporting source ↗
Mass
16 kgrogue-otp2b-gen3-plannedPlanned specification · Q1 2027 launch target
Notes & source

Configuration: OTP-2B complete spacecraft

Planned total spacecraft mass, not GPU or computing payload mass.

Evidence basis: Planned specification · Q1 2027 launch target

Source / observation date: .

Supporting source ↗
Below 0.5 kgSCP Gen 2 compute modulePublished specification for Gen 2 flight hardware
Notes & source

Configuration: SCP Gen 2 compute module

Rogue lists this limit for the SCP Gen 2 computing module, separate from total spacecraft mass.

Evidence basis: Published specification for Gen 2 flight hardware

Source / observation date: .

Supporting source ↗
Orbit / altitude
Sun-synchronous orbitrogue-otp2-gen2Current operator mission account
Notes & source

Configuration: rogue-otp2-gen2

Altitude and orbital period are not provided.

Evidence basis: Current operator mission account

Source / observation date: .

Supporting source ↗
Sun-synchronous orbit, launch targeted Q1 2027rogue-otp2b-gen3-plannedCurrent undated operator plan
Notes & source

Configuration: rogue-otp2b-gen3-planned

Launch timing supersedes older 2026 forecasts, without establishing deployment.

Evidence basis: Current undated operator plan

Source / observation date: .

Supporting source ↗
Ground communications
Ka-band uplink and downlink, X-band downlinkrogue-otp2b-gen3-plannedPlanned communications architecture
Notes & source

Configuration: rogue-otp2b-gen3-planned

No numerical bit rate is stated. These links are ground communications, not an inter-satellite link.

Evidence basis: Planned communications architecture

Source / observation date: .

Supporting source ↗
Design life / mission duration
2 yearsrogue-otp2-gen2Launched hardware specification
Notes & source

Configuration: OTP-2 mission duration specification

Operator mission-duration specification. Does not assert two completed years in orbit.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
5 yearsrogue-otp2b-gen3-plannedPlanned specification · Q1 2027 launch target
Notes & source

Configuration: OTP-2B design life

Design life for the planned spacecraft, not elapsed operations or a reliability demonstration.

Evidence basis: Planned specification · Q1 2027 launch target

Source / observation date: .

Supporting source ↗
Memory / storage
16 GBRogue OTP-2 with SCP Gen 2Launched hardware specification
Notes & source

Configuration: SCP Gen 2 LPDDR4x RAM

Published volatile memory capacity on the Gen 2 computer. Storage is listed separately.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
1 TBRogue OTP-2 with SCP Gen 2Launched hardware specification
Notes & source

Configuration: SCP Gen 2 storage

Published storage capacity on the Gen 2 computer. LPDDR4x RAM is listed separately.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
Physical envelope
8 Urogue-otp2-gen2

CubeSat form factor, not a physical dimension in metres.

Launched spacecraft specification
Notes & source

Configuration: rogue-otp2-gen2

CubeSat form factor, not a physical dimension in metres.

Evidence basis: Launched spacecraft specification

Source / observation date: .

Supporting source ↗
8 Urogue-otp2b-gen3-planned

CubeSat form factor for the upcoming mission.

Planned spacecraft specification
Notes & source

Configuration: rogue-otp2b-gen3-planned

CubeSat form factor for the upcoming mission.

Evidence basis: Planned spacecraft specification

Source / observation date: .

Supporting source ↗
Below 0.5 USCP Gen 2 compute modulePublished specification for Gen 2 flight hardware
Notes & source

Configuration: SCP Gen 2 compute module

Size of the complete Gen 2 computing module, separate from OTP-2's 8U spacecraft form factor.

Evidence basis: Published specification for Gen 2 flight hardware

Source / observation date: .

Supporting source ↗
Other specifications
Remote updates and third-party software hostingSCP platform architectureOperator-reported software service
Notes & source

Configuration: SCP platform architecture

Algorithms and mission applications can be updated independently of flight-critical systems.

Evidence basis: Operator-reported software service

Source / observation date: .

Supporting source ↗
Radiation-hardened components, autonomous health management and propulsive station-keepingrogue-otp2b-gen3-plannedOperator design description
Notes & source

Configuration: rogue-otp2b-gen3-planned

Qualitative endurance architecture. No radiation dose, propulsion performance or demonstrated lifetime is stated.

Evidence basis: Operator design description

Source / observation date: .

Supporting source ↗
Linux, CAN, Ethernet and RS-485, with an integrated Gigabit Ethernet switch and aluminum shieldingSCP Gen 2 compute modulePublished specification for Gen 2 flight hardware
Notes & source

Configuration: SCP Gen 2 compute module

The listed Ethernet interface is internal to the module. It does not provide a space-to-ground or inter-satellite link rate.

Evidence basis: Published specification for Gen 2 flight hardware

Source / observation date: .

Supporting source ↗
Language-model inference, image processing and mission-planning supportSCP Gen 2 compute moduleOperator-reported in-orbit demonstrations
Notes & source

Configuration: SCP Gen 2 compute module

Rogue reports these software workloads ran aboard OTP-2, without giving workload latency or sustained arithmetic performance.

Evidence basis: Operator-reported in-orbit demonstrations

Source / observation date: .

Supporting source ↗

Explore project relationships →

Figures retain their disclosed units and scope. Launched hardware does not establish demonstrated performance; targets may change. Not disclosed means no figure in the reviewed sources.

Organizations & responsibilities

Progress describes the recorded contribution as of its cited report.

Project organizations

Partnership
PlannedReported

Mission Space plans to process space-weather measurements aboard the upcoming OTP-2B platform.

Full record & sources for Rogue Space Systems

Original disclosure · 5 Mar 2026: Rogue OTP-2B computing and payload hosting for Mission Space’s onboard space-weather data processing.

The source establishes the stated role and stage. No purchase value is disclosed.

Buyer: Mission Space

Project profile: Rogue Scalable Compute Platform

View this relationship on the organization profile →

Source checked 18 Nov 2026.

Progress reviewed 18 Nov 2026.

Rogue Gen 3 SCP for Mission Space analytics ↗
Partnership
Progress unconfirmed · Disclosure

Rogue OTP-2 and OTP-2B compute-platform access and hosting for Satlyt AI orchestration, autonomous operations and data-optimization testing.

Full record & sources for Rogue Space Systems

OTP-2 is the existing second-generation platform; OTP-2B and its third-generation GPU/storage/networking platform remain planned. This is one two-platform collaboration. No disclosed purchase value, verified clustered compute network or completed OTP-2B flight is established.

Associated organization: Satlyt Inc.

Project profile: Rogue Scalable Compute Platform

Project profile: Satlyt federated satellite computing

View this relationship on the organization profile →

Source checked 14 Oct 2026.

Satlyt to Demonstrate AI Orchestration on Rogue Space Systems’ Compute Platforms ↗
Company information

Rogue Space Systems develops autonomous spacecraft for inspection, payload hosting and orbital logistics.

Location
Laconia, United States
Company information checked
Sources for Rogue Space Systems

Suppliers & hosts

Role confirmed
PlannedReported

Rogue identifies NVIDIA GPU/CPU architecture for the upcoming Gen 3 platform, with no chip model or delivery result stated.

Full record & sources for NVIDIA

Original disclosure · 5 Mar 2026: NVIDIA GPU/CPU architecture named for Rogue’s planned Gen 3 Space Computing Platform aboard OTP-2B.

Named architecture contribution. No procurement order, exact processor configuration or payment is disclosed.

Buyer: Rogue Space Systems

Project profile: Rogue Scalable Compute Platform

View this relationship on the organization profile →

Source checked 18 Nov 2026.

Progress reviewed 18 Nov 2026.

Rogue Gen 3 SCP for Mission Space analytics ↗
Company information

NVIDIA develops GPUs, accelerated-computing systems and software for AI, graphics and scientific computing.

Location
Santa Clara, United States

SpaceX

SupplierLaunch
Role confirmed
LaunchedReport date unconfirmed

SpaceX’s Transporter-13 flight carried OTP-2 into sun-synchronous orbit on March 14, 2025.

Full record & sources for SpaceX

Original disclosure: SpaceX launched Rogue’s OTP-2 computing spacecraft on the Transporter-13 rideshare on March 14, 2025.

Rogue identifies the launch provider and mission.

Buyer: Rogue Space Systems

Project profile: Rogue Scalable Compute Platform

View this relationship on the organization profile →

Source checked 25 Nov 2026.

Progress reviewed 25 Nov 2026.

Rogue OTP-2 mission history ↗
Role confirmed
PlannedReport date unconfirmed

Rogue’s current mission page targets a Falcon 9 launch in the first quarter of 2027.

Full record & sources for SpaceX

Original disclosure: Planned SpaceX Falcon 9 launch of Rogue’s OTP-2B computing spacecraft into sun-synchronous orbit.

The source establishes the stated role and stage. No purchase value is disclosed.

Buyer: Rogue Space Systems

Project profile: Rogue Scalable Compute Platform

View this relationship on the organization profile →

Source checked 18 Nov 2026.

Progress reviewed 18 Nov 2026.

Rogue OTP-2B mission specification ↗
Company information

SpaceX develops launch vehicles, spacecraft and satellite communications systems.

Location
Starbase, United States
Company information checked
Sources for SpaceX
NEXT MILESTONE

OTP-2B launch targeted for the first quarter of 2027.

Manual review 25 Nov 2026. Rogue lists OTP-2 as active and hosting customer software. Its Gen 2 computer is rated at 21 TOPS at INT8 and has 16 GB of RAM and 1 TB of storage. The Gen 3 launch remains planned for early 2027. Primary body last observed not available. Source monitoring: unavailable. Source collection and substantive profile review are separate checks. Plans and dates may change.

Rogue Space Systems (opens in a new tab)
WHAT REMAINS UNKNOWN
  • Rogue lists CPU and accelerator core counts for Gen 2 without naming the processor parts. Gen 3's 248 TOPS rating has no disclosed arithmetic precision or processor part number.
  • Gen 2 peak power is for the complete module. Average draw, processor-only draw, spacecraft demand, thermal limits and external link rates are not reported in the reviewed mission pages. Gen 3 RAM and storage are also unspecified.
  • OTP-2B remains a planned mission. Its specifications are separate from active OTP-2 hardware.

Project updates

Verified announcements and milestones linked to this project, newest first.