This project focuses on programmable AI processing in orbit.


The MOI family includes MOI-TD, MOI-1 lost during launch in January 2026, MOI-1A and the planned MOI-1B. Current TakeMe2Space mission history and technical article both report successful MOI-TD AI-lab operation, including on-orbit inference. An older undated data sheet conflicts and is retained as superseded historical evidence, not the current project outcome. D-Orbit confirms MOI-1A deployment on October 14, 2026, and TakeMe2Space now reports MOI-1A lost in orbit. The loss date and cause are undisclosed.

TakeMe2Space · MOI-1A reported lost. MOI-1B planned.

Scope: Shared computing & storage · A shared computing or storage platform, or a program developing that infrastructure. Classification describes intended use, not operating capacity.

Full technical comparison, configurations and availability →

View all project relationship records →

Compute performance
117 TOPSPlanned · October 2026MOI-1A replacement satellite GPU specification
Evidence & scope

Observed on an undated operator page on September 26. Numerical precision is unspecified; this is not a demonstrated benchmark or failed MOI-1 capacity.

As of

Primary source ↗
4 TOPSLaunchedHistorical MOI-TD Edge TPU advertised hardware capability
Evidence & scope

Operator technical account of the launched demonstrator with unspecified arithmetic precision. Current operator mission history and technical article report successful AI-lab protocol execution and in-orbit inference. The 4 TOPS value is an advertised hardware specification, not measured orbital throughput. An older undated data sheet is retained as superseded historical evidence. This is separate from the planned MOI-1A 117 TOPS specification.

As of

Primary source ↗
Memory & storage
2 TBPlanned · October 2026MOI-1A replacement satellite advertised onboard storage
Evidence & scope

Undated operator technology page read completely on September 29. The MOI-1A specification states 2 TB; the separately configurable 4 TB AI-Cube option is not established as this mission configuration. Planned hardware capacity, not deployed or measured in-orbit storage.

As of

Primary source ↗
16 GB RAMPlanned · October 2026MOI-1A replacement satellite memory
Evidence & scope

Operator specification observed on an undated page, not measured installed capacity in orbit.

As of

Primary source ↗
Deployment count
6 satellitesPlannedTotal planned MOI constellation
Evidence & scope

RIDE!'s September 10 release describes a total six-satellite constellation and says its contracted pair forms part of that total, with the pair targeted for Q3 2028. The operator homepage's older Q4 2027 network target conflicts with this schedule; overall constellation completion remains unresolved. The pair is not additional to the six, and no deployed count is established.

As of

Primary source ↗

Figures retain their disclosed units and scope. Launched hardware does not establish demonstrated performance; targets may change. Not disclosed means no figure in the reviewed sources.

PROJECT RELATIONSHIPS

Suppliers & project partners

D-Orbit

Host

Program organization: TakeMe2Space

Supplier selected
Launch integration

ION carrier manifest includes MOI-1A via Impulso Space on Transporter-18.

Deployment is confirmed by the carrier operator. Contact, commissioning, computing results and direct procurement terms remain undisclosed.

Announced 1 Oct 2026 · Evidence checked 27 Oct 2026

D-Orbit MOI-1A manifest (opens in a new tab)

Impulso Space

Supplier

Program organization: TakeMe2Space

Supplier selected
Launch integration

Impulso Space is the named intermediary for MOI-1A carriage in D-Orbit’s ION manifest.

D-Orbit confirms October 14 deployment. Impulso’s manifest role is established, while the precise contract chain and price remain undisclosed.

Announced 1 Oct 2026 · Evidence checked 27 Oct 2026

D-Orbit MOI-1A intermediary disclosure (opens in a new tab)

SpaceX

Supplier

Program organization: TakeMe2Space

Supplier selected
Launch capacity

Falcon 9 Transporter-18 launched ION carriers whose manifest lists MOI-1A via Impulso Space.

Carrier launch and subsequent October 14 deployment are supported. No direct TM2S–SpaceX contract, spacecraft contact or computing result is established.

Announced 1 Oct 2026 · Evidence checked 27 Oct 2026

D-Orbit October 1 ION launch manifest (opens in a new tab)

RIDE! space

Supplier

Buyer: TakeMe2Space

Contract awarded
Launch capacity · Launch integration

Launch management for two TakeMe2Space constellation satellites targeted for Q3 2028, including satellite integration, verification, regulatory compliance and oversight of the launch campaign.

Signed launch-services agreement; contract value is undisclosed. These two satellites form part of the planned six-satellite constellation. The primary release does not name Waymaker-2, SpaceX, SEOPS, spacecraft power or hardware configuration and does not cover the MOI-1A replacement launch.

Announced 10 Sept 2026 · Evidence checked 28 Sept 2026

RIDE! signs launch agreement with TakeMe2Space (opens in a new tab)

Little Place Labs

Research participant

Program organization: TakeMe2Space

Partnership
Research & feasibility studies

Joint ground demonstration of Little Place Labs' ORBITFY preprocessing and application software on TakeMe2Space's OrbitLab ground test platform under an announced demonstration agreement.

The release carries a February 25, 2026 announcement dateline and March 3 publication metadata. Pilot missions, orbital deployments and commercial agreements are conditional on future mutual alignment. No paid in-orbit service, procurement buyer, price or completed demonstration outcome is established.

Announced 25 Feb 2026 · Evidence checked 28 Sept 2026

Little Place Labs and TakeMe2Space Demonstrate ORBITFY on Ground Infrastructure as a Step Toward Near-Real-Time Edge AI in Orbit (opens in a new tab)

AICRAFT

Supplier

Program organization: TakeMe2Space

Preliminary agreement
Processors / accelerators

MoU for intended integration of AICRAFT Pulsar Development Kit, SpaceWire-enabled Pulsar and NEXON Edge AI Server equipment into TM2S’s planned OrbitLab constellation from 2026.

Disclosure date, not exact signing date. No paid order, fixed volume or completed integration established. OrbitLab is not a new duplicate project.

Announced 1 Oct 2025 · Evidence checked 13 Oct 2026

SASIC AICRAFT / TakeMe2Space MoU (opens in a new tab)

HYLENR

Research participant

Program organization: TakeMe2Space

Preliminary agreement
Research & feasibility studies

Exploratory MoU to develop and test proposed LENR-powered compute modules using TM2S satellite systems.

Issuer announcement only. No working LENR device, net power gain, flight hardware or launch established. Scientific efficacy claims are not verified.

Announced 26 Mar 2025 · Evidence checked 8 Oct 2026

HYLENR / TakeMe2Space experimental MoU (opens in a new tab)

Indian Space Research Organisation (ISRO)

Host

Program organization: TakeMe2Space

Supplier selected
Payload integration · Launch capacity

ISRO PSLV-C60 launched the MOI-TD payload on December 30, 2024; POEM-4 hosted the payload and provided its orbital platform.

This is an explicitly identified delivered launch and hosted-platform role. The data sheet is undated; December 30 is the launch date, not an agreement date. No direct buyer, procurement instrument, price or paid-service contract is disclosed. Current operator records report successful MOI-TD AI-lab operation, including in-orbit inference. The data sheet's conflicting outcome account is superseded historical evidence.

Announced Publication date not supplied · Evidence checked 27 Sept 2026

TakeMe2Space MOI-TD mission data sheet (opens in a new tab)

EON Space Labs

Supplier

Program organization: TakeMe2Space

Supplier selected
Sensors & monitoring

MIRA Earth-observation imaging payload integrated aboard TakeMe2Space's MOI-1 satellite for the PSLV-C62 mission.

The official website is undated. Integration is established, but the failed PSLV-C62 mission does not establish orbital qualification or operation. No separate MOI-1A procurement is inferred.

Announced Publication date not supplied · Evidence checked 20 Oct 2026

EON Space Labs MIRA mission integration (opens in a new tab)
NEXT MILESTONE

Operator targets MOI-1B for November 2026. Launch and results remain unconfirmed. The exact date and cause of the MOI-1A loss remain undisclosed.

Manual review with evidence gaps 29 Oct 2026. Current operator records support successful MOI-TD AI-lab operation. The older undated data sheet is retained as superseded historical evidence. Separate MOI-1A loss details and network schedule conflicts remain limited-profile questions. Primary body last observed 23 Oct, 06:37 UTC. Source monitoring: ongoing. Source collection and substantive profile review are separate checks. Plans and dates may change.

TakeMe2Space current mission history (opens in a new tab)
WHAT REMAINS UNKNOWN
  • D-Orbit confirms MOI-1A deployment on October 14 after the October 1 carrier launch. The current operator mission history reports MOI-1A lost in orbit. Exact loss date, cause and any earlier contact, commissioning or AI workload results remain undisclosed.
  • The operator homepage targets a total six-satellite network by Q4 2027, but RIDE!'s September 10 and 17 releases place two satellites explicitly belonging to that constellation in Q3 2028. The network completion schedule remains inconsistent. These two are not additional to the six; the older data sheet's post-MOI-1A wording does not establish seven spacecraft.
  • 117 TOPS is an advertised GPU specification without disclosed arithmetic precision or an in-orbit benchmark.
  • D-Orbit identifies Impulso Space as intermediary for MOI-1A. Direct legal purchasing chain and value remain undisclosed. RIDE! covers two later satellites, not this flight. Customer utilization and revenue remain unverified.
  • The technology page mixes MOI-1 and MOI-1A descriptions and advertises 120 W peak/payload allocation, 67.2 W peak solar generation and a 200 Wh battery alongside continuous-operation language. Sustained compute power and duty cycle are not demonstrated by these design figures.
  • Current TakeMe2Space mission history and technical article report successful MOI-TD AI-lab operation. An older undated data sheet conflicts and is retained as superseded historical evidence. Exact source revision dates and exact mission duration are not disclosed and are not treated as current performance facts.

Project updates

Verified announcements and milestones linked to this project, newest first.

MOI-1A launches aboard SpaceX Transporter-18 (opens in a new tab)

Punjab Newsline reports that TakeMe2Space’s MOI-1A orbital-computing satellite launched aboard SpaceX’s Transporter-18 rideshare mission. The spacecraft is designed to process imagery and other data in orbit and downlink selected results instead of all raw data.

MOI-1A launch targeted for October 1 (opens in a new tab)

India Today reports MOI-1A is scheduled for SpaceX’s Transporter-18 mission on October 1. TakeMe2Space’s mission page still labels the replacement mission as tentative for October. Flight, payload deployment and commissioning remain unconfirmed.

MOI-TD success accepted from current operator records (opens in a new tab)

Current TakeMe2Space mission history reports success and more than 20 experiments, while the current technical article reports nominal AI-lab protocol execution and a camera saturation fault. The older undated data sheet is retained as superseded historical evidence. Exact revision dates and mission duration remain undisclosed.

MOI-TD launched (opens in a new tab)

MOI-TD flew on PSLV-C60/POEM-4. Current TakeMe2Space mission history and technical article report successful AI-lab protocol execution and in-orbit inference. An older undated data sheet is retained as superseded historical evidence. Exact mission duration remains undisclosed.

Operator page names MOI-1B design (opens in a new tab)

Undated technology page identifies a 6U, 14 kg MOI-1B with 117 TOPS advertised compute and 2 TB storage, targeting November 2026. Not evidence of launch, commissioning or a correction to the separately deployed MOI-1A.

Operator reports MOI-1A lost in orbit (opens in a new tab)

The current undated operator mission history labels MOI-1A Lost in Orbit and reports loss for all purposes. It supplies no loss date or cause. D-Orbit’s confirmed October 14 deployment remains part of the mission history.