United States · Orbital AI and optical-communications demonstrator

NASA R5-S9

NASA launched R5-S9 on July 7, 2026 to test onboard AI and optical communications. Sandia National Laboratories supplied an autonomous observation and radiation-monitoring payload using a modified NVIDIA Jetson Orin Nano Super computer. The Aerospace Corporation supplied an experimental LED transmitter. The mission tests commercial computing hardware in space and ways to send data to Earth.

NASA Johnson Space CenterLaunchedLaunched for technology demonstrations

Scope: Enabling research · A named mission testing enabling onboard AI and optical-communications technology.

Technical overview

Compare technical specifications →

Compute hardware
Modified NVIDIA Jetson Orin Nano Super Developer KitR5-S9Mission technical paper preflight design and ground tests
Notes & source

Configuration: R5-S9 flight configuration

Primary Sandia sensor-processing computer. A separate computer runs spacecraft flight software.

Evidence basis: Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
Basler machine-vision imager, radiation-upset memory board and additional Ximea MC023 star-tracker cameraR5-S9Mission technical paper preflight design and ground tests
Notes & source

Configuration: R5-S9 flight configuration

Installed R5-S9 configuration. The memory chip is an upset sensor, not a disclosed RAM or storage capacity.

Evidence basis: Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
NASA core Flight System with a payload interface and Automated Flight ManagerR5-S9Mission technical paper preflight design and ground tests
Notes & source

Configuration: R5-S9 flight configuration

Spacecraft software architecture. A second Jetson used in ground emulation is not an additional flight computer.

Evidence basis: Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
IT electrical power
7 W power modeR5-S9

Default Jetson mode selected for flight after thermal testing. This is a configured mode, not measured average IT demand.

Mission technical paper preflight design and ground tests
Notes & source

Configuration: R5-S9 flight configuration

Default Jetson mode selected for flight after thermal testing. This is a configured mode, not measured average IT demand.

Evidence basis: Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
Electrical power (boundary unresolved)
60 W rail outputR5-S9

Custom PDU v5 provides a 12 V rail rated for this output. This is distribution capability, not complete spacecraft demand.

Mission technical paper preflight design and ground tests
Notes & source

Configuration: R5-S9 flight configuration

Custom PDU v5 provides a 12 V rail rated for this output. This is distribution capability, not complete spacecraft demand.

Evidence basis: Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
Solar generation
Body-mounted panels with deployable wings omitted from the final buildR5-S9Mission technical paper preflight design and ground tests
Notes & source

Configuration: R5-S9 flight configuration

Deployable arrays were removed before environmental testing. No numerical flight generation is specified.

Evidence basis: Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
Heat rejection
Copper heatsink and silver Teflon tape above the payload computerR5-S9Mission technical paper preflight design and ground tests
Notes & source

Configuration: R5-S9 flight configuration

Solar cells above the computer were replaced with reflective tape to reduce heating. Heat-rejection capacity was not specified.

Evidence basis: Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
Orbit / altitude
Low-Earth orbitR5-S9Official operator mission history
Notes & source

Configuration: R5-S9

NASA mission-series objective and launch history. No numerical R5-S9 orbit is assigned from other spacecraft.

Evidence basis: Official operator mission history

Source / observation date: .

Supporting source ↗
Ground communications
100 kbps configuredR5-S9

LEDComm v2B optical demonstration to Aerospace's El Segundo station. Flight software sends a pseudorandom test pattern. No achieved orbital data rate is reported.

Mission technical paper preflight design and ground tests
Notes & source

Configuration: R5-S9 flight configuration

LEDComm v2B optical demonstration to Aerospace's El Segundo station. Flight software sends a pseudorandom test pattern. No achieved orbital data rate is reported.

Evidence basis: Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
Inter-satellite communications
Iridium telemetry plus experimental Ground Control RockBLOCK 9704 with integrated patch antennaR5-S9Mission technical paper preflight design and ground tests
Notes & source

Configuration: R5-S9 flight configuration

Iridium satellite relay, distinct from the optical ground downlink. The 9704 demonstration uses IMT messaging. No mission data rate is given.

Evidence basis: Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
Other specifications
Autonomous space-object, maritime and radiation-upset detectionR5-S9Mission technical paper preflight design and ground tests
Notes & source

Configuration: R5-S9 flight configuration

Mission software design and ground tests. No achieved orbital arithmetic benchmark is reported.

Evidence basis: Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
Thermal throttling after 6–8 minutes in ground stress testsR5-S9 ground thermal testMission technical paper preflight design and ground tests
Notes & source

Configuration: R5-S9 ground thermal test

CPU/GPU workload and power settings varied. Test included the flight interface and heatsink but excluded spacecraft thermal mass.

Evidence basis: Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
90 s pointing limitR5-S9

Configured primary-mission pointing time limit to conserve propellant. Not an inference benchmark or mission lifetime.

Mission technical paper preflight design and ground tests
Notes & source

Configuration: R5-S9 flight configuration

Configured primary-mission pointing time limit to conserve propellant. Not an inference benchmark or mission lifetime.

Evidence basis: Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
State initialization at 90 s, payload pointing selection at 95 s and planned slew completion at 200 s after power-onR5-S9Mission technical paper preflight design and ground tests
Notes & source

Configuration: R5-S9 flight configuration

Proposed mission sequence in the technical paper, not measured orbital timings.

Evidence basis: Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
Reference configurations & supporting specifications (2)

Configuration: R5-S9 preflight thermal modelOfficial study estimate · Mission technical paper preflight design and ground tests

IT electrical power
25 W

Maximum specified Jetson load used for preflight thermal modelling. A separate modelling condition from the 7 W flight default.

Notes & source

Configuration: R5-S9 preflight thermal model

Maximum specified Jetson load used for preflight thermal modelling. A separate modelling condition from the 7 W flight default.

Evidence basis: Official study estimate · Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗
Thermal operating boundary
111 °C

Simulated maximum at continuous duty and direct solar exposure under the 25 W model. This is not a flight temperature or allowable operating limit.

Notes & source

Configuration: R5-S9 preflight thermal model

Simulated maximum at continuous duty and direct solar exposure under the 25 W model. This is not a flight temperature or allowable operating limit.

Evidence basis: Official study estimate · Mission technical paper preflight design and ground tests

Source / observation date: .

Supporting source ↗

Explore project relationships →

Figures retain their disclosed units and scope. Launched hardware does not establish demonstrated performance; targets may change. Not disclosed means no figure in the reviewed sources.

Organizations & responsibilities

Progress is unconfirmed for all recorded contributions.

Project organizations

Suppliers & hosts

Partnership
Progress unconfirmed · Disclosure

The Aerospace Corporation provided the experimental LED optical transmitter and El Segundo receiving station for R5-S9.

Full record & sources for The Aerospace Corporation

Associated organization: NASA

Project profile: NASA R5-S9

View this relationship on the organization profile →

Source checked 9 Nov 2026.

NASA CubeSat to Speed Technology Testing in Orbit ↗
Company information

The Aerospace Corporation provides technical research and engineering support for space missions.

Location
Chantilly, United States
Company information checked
Sources for The Aerospace Corporation
Development agreement
Progress unconfirmed · Disclosure

Sandia supplied R5-S9's autonomous observation, radiation-detection and AI payload and participated in integration under a nonreimbursable Space Act Agreement.

Full record & sources for Sandia National Laboratories

Associated organization: NASA

Project profile: NASA R5-S9

View this relationship on the organization profile →

Source checked 9 Nov 2026.

NASA CubeSat to Speed Technology Testing in Orbit ↗
Company information

Sandia conducts scientific and engineering research for national security.

Location
Albuquerque, United States
Company information checked
Sources for Sandia National Laboratories

SEOPS

SupplierLaunch
Contract / order disclosed
Progress unconfirmed · Disclosure

SEOPS manifested R5-S9 under a NASA VADR launch-services task order.

Full record & sources for SEOPS

Associated organization: NASA

Project profile: NASA R5-S9

View this relationship on the organization profile →

Source checked 9 Nov 2026.

NASA CubeSat to Speed Technology Testing in Orbit ↗
Company information

SEOPS provides small satellite launch integration, deployment and mission services.

Location
Giddings, United States
Company information checked
Sources for SEOPS

SpaceX

SupplierLaunch
Role confirmed
Progress unconfirmed · Disclosure

SpaceX launched R5-S9 on Falcon 9 Transporter-17 on July 7, 2026.

Full record & sources for SpaceX

SEOPS provided the NASA launch-service task-order role.

Associated organization: NASA

Project profile: NASA R5-S9

View this relationship on the organization profile →

Source checked 9 Nov 2026.

NASA CubeSat to Speed Technology Testing in Orbit ↗
Company information

SpaceX develops launch vehicles, spacecraft and satellite communications systems.

Location
Starbase, United States
Company information checked
Sources for SpaceX
Role confirmed
Progress unconfirmed

A Basler machine-vision imager and ruggedized lens are installed in the Sandia R5-S9 payload.

Full record & sources for Basler

Associated organization: NASA

Project profile: NASA R5-S9

View this relationship on the organization profile →

Source checked 9 Nov 2026.

R5 Spacecraft 7, 9, and 10 technical paper ↗
Company information

Basler develops machine-vision cameras, imaging components and computer-vision systems.

Headquarters
Ahrensburg, Germany
Role confirmed
Progress unconfirmed

A Ground Control RockBLOCK 9704 radio with integrated patch antenna is installed for the R5-S9 messaging experiment.

Full record & sources for Ground Control

Associated organization: NASA

Project profile: NASA R5-S9

View this relationship on the organization profile →

Source checked 9 Nov 2026.

R5 Spacecraft 7, 9, and 10 technical paper ↗
Company information

Ground Control provides satellite and cellular connectivity for remote monitoring and tracking.

Headquarters
Churcham, United Kingdom / Las Vegas, United States
Role confirmed
Progress unconfirmed

R5-S9 uses Iridium-based telemetry and an experimental 9704 radio with IMT messaging.

Full record & sources for Iridium

Associated organization: NASA

Project profile: NASA R5-S9

View this relationship on the organization profile →

Source checked 9 Nov 2026.

R5 Spacecraft 7, 9, and 10 technical paper ↗
Company information

Iridium operates a satellite communications network providing voice, data and connectivity services.

Headquarters
McLean, United States
Company information checked
Sources for Iridium
Role confirmed
Progress unconfirmed

A modified NVIDIA Jetson Orin Nano Super Developer Kit serves as R5-S9's primary payload computer.

Full record & sources for NVIDIA

Associated organization: NASA

Project profile: NASA R5-S9

View this relationship on the organization profile →

Source checked 9 Nov 2026.

R5 Spacecraft 7, 9, and 10 technical paper ↗
Company information

NVIDIA develops GPUs, accelerated-computing systems and software for AI, graphics and scientific computing.

Location
Santa Clara, United States
Role confirmed
Progress unconfirmed

An additional Ximea MC023 camera serves as an R5-S9 star tracker.

Full record & sources for Ximea

Associated organization: NASA

Project profile: NASA R5-S9

View this relationship on the organization profile →

Source checked 9 Nov 2026.

R5 Spacecraft 7, 9, and 10 technical paper ↗
Company information

XIMEA develops industrial and scientific imaging cameras.

Location
Münster, Germany
Company information checked
Sources for Ximea
NEXT MILESTONE

Results from the onboard AI and optical-communications experiments

Manual review 24 Nov 2026. NASA confirms the July launch of R5-S9 to test Sandia’s onboard computer and an optical transmitter. The published engineering paper reports ground tests for R5-S9. Primary body last observed not available. Source monitoring: blocked. Source collection and substantive profile review are separate checks. Plans and dates may change.

NASA launch account and mission technical paper (opens in a new tab)
WHAT REMAINS UNKNOWN
  • Achieved orbital AI and optical-communications results
  • Installed RAM and storage capacity
  • Complete payload and spacecraft electrical demand
  • Numerical orbit, mission duration, mass and dimensions

Project updates

Verified announcements and milestones linked to this project, newest first.