Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
1–25 of 103 projects shown
| Project / developer | Intended use | Development status | Configuration / scope | Compute / hardware | IT electrical power |
|---|---|---|---|---|---|
Chenguang-1 (辰光一号)Beijing Xingchen Future Space Technology Research Institute / Beijing Orbital Chenguang Technology · ChinaLatest development 27 Nov 2026 ↗Manual review with evidence gaps 28 Nov 2026Stage detail: Research test service open Chenguang-1 is open to researchers. The institute unveiled SUICE at the same event and did not report running that software aboard the satellite. Last full profile review: 22 Oct 2026. Sources collected: 22 Oct 2026. Source collection and substantive profile review are separate checks. | Shared compute, power and thermal validation | OperatingResearch test service openNext project milestonePublish detailed benchmark methods and follow-on deployment schedule | 1 satelliteChenguang-1 demonstratorLaunched hardware specification Notes & sourceConfiguration: Chenguang-1 demonstrator Entered its planned orbit on 24 July 2026; in-orbit technology validation was still to follow. Evidence basis: Launched hardware specification Source / observation date: . Supporting source ↗ | 8 accelerator cardsChenguang-1 demonstratorLaunched hardware specification Notes & sourceConfiguration: Server on Chenguang-1 The source describes an eight-card server sent into orbit. Accelerator models and benchmark performance are not disclosed. Evidence basis: Launched hardware specification Source / observation date: . Supporting source ↗2 more configurations / specificationsGuoke Huanyu developed payload, integrated electronics, energy and fluid-loop cooling chainsChenguang-1 demonstratorUniversity component developer report and ground tests Notes & sourceConfiguration: Chenguang-1 delivered power-conversion and systems hardware University account of mission-specific responsibilities. It does not identify the eight accelerator-card models. Evidence basis: University component developer report and ground tests Source / observation date: . Supporting source ↗Radiation-hardened domestic commercial server operating in orbitChenguang-1 demonstratorGovernment reported third party orbital evaluation Notes & sourceConfiguration: Chenguang-1 in-orbit evaluation The result reports stable operation but does not name the server manufacturer, processor models, memory or storage. The existing eight-card launch metric remains the supported configuration count. Evidence basis: Government reported third party orbital evaluation Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteThe reviewed roadmap and solar-technology disclosures do not establish a Chenguang-1 IT electrical load. |
Suppliers & relationships 8 suppliers / hosts · 12 relationships
Show all 12 relationships & detailsHide relationship details for Chenguang-1 (辰光一号)
| |||||
Three-Body Computing ConstellationZhejiang Lab / ADA Space / partners · ChinaLatest development 27 Nov 2026 ↗Manual review with evidence gaps 27 Nov 2026Stage detail: In-orbit computing tests reported ADA Space reported a full AI training run in orbit and confirmed that Libra was the satellite used. STAR.VISION has not confirmed a launch for Marco Polo and Ibn Battuta. Last full profile review: 15 Oct 2026. Sources collected: 15 Oct 2026. Source collection and substantive profile review are separate checks. | Distributed computing, networking and AI research | DemonstratedIn-orbit computing tests reportedNext project milestoneTest the Group 02 laser links between satellites and to Earth. | 12 satellitesFirst twelve-satellite batch: aggregateLaunched hardware specification Notes & sourceConfiguration: First constellation batch Launch count for the first batch, not a claim that all satellites remain operational. Evidence basis: Launched hardware specification Source / observation date: . Supporting source ↗7 more configurations / specifications2 planned satellitesMarco Polo / Ibn Battuta planned pair October 9 recap targets Q4 2026 launch. No launcher, exact date, completed deployment or commissioning is established. Parent ecosystem membership does not establish a current… Planned configurationNotes & sourceConfiguration: Marco Polo / Ibn Battuta planned pair October 9 recap targets Q4 2026 launch. No launcher, exact date, completed deployment or commissioning is established. Parent ecosystem membership does not establish a current active-satellite total. Evidence basis: Planned configuration Source / observation date: . Supporting source ↗2 planned satellitesNew Oman Lens / STAR.VISION pair Source announces two new AI remote-sensing satellites. It does not establish launch date or operation. The new pair and prior OL-1 must not be combined into an asserted active… Planned configurationNotes & sourceConfiguration: New Oman Lens / STAR.VISION pair Source announces two new AI remote-sensing satellites. It does not establish launch date or operation. The new pair and prior OL-1 must not be combined into an asserted active fleet count. Evidence basis: Planned configuration Source / observation date: . Supporting source ↗XSD-27 through XSD-38First twelve-satellite batchAttributed official published account Notes & sourceConfiguration: First twelve-satellite batch Issuer roster maps these twelve satellites to May 14, 2025 launch. Evidence basis: Attributed official published account Source / observation date: . Supporting source ↗XSD-39 and XSD-44 through XSD-50Shared Xingsuan group-02 batchAttributed official published account Notes & sourceConfiguration: Shared Xingsuan group-02 batch Issuer roster maps these eight satellites to October 14, 2026. Mingzhu payload hosts share this batch. Evidence basis: Attributed official published account Source / observation date: . Supporting source ↗Issuer describes Star-Compute as a rolling network supported by frequency and orbital resources for up to 2,800 AI-computing satellitesADA Space Star-Compute network roadmapIssuer reported network plan Notes & sourceConfiguration: ADA Space Star-Compute network roadmap November5 prospectus roadmap and issuer resource claim. The network has no fixed deployment milestone. This is a resource envelope, not launched inventory, operating capacity or independent confirmation of regulatory authorizations. Evidence basis: Issuer reported network plan Source / observation date: . Supporting source ↗ADA Space reports that the satellites came off the production lineStar-Compute Group 03Issuer newsroom announcement Notes & sourceConfiguration: Star-Compute Group 03 production milestone The announcement dates the production milestone. There is no launch or batch count in the listing. Evidence basis: Issuer newsroom announcement Source / observation date: . Supporting source ↗7 satellites with terminalsSeven Xingsuan Group 02 laser-terminal spacecraft Xingyao Guangyu terminals flew on seven of the eight existing Group 02 satellites. These are not additional spacecraft. Launch and in-orbit telemetry reported by Changzhou Science and Education TownNotes & sourceConfiguration: Seven Xingsuan Group 02 laser-terminal spacecraft Xingyao Guangyu terminals flew on seven of the eight existing Group 02 satellites. These are not additional spacecraft. Evidence basis: Launch and in-orbit telemetry reported by Changzhou Science and Education Town Source / observation date: . Supporting source ↗ | 1,000 POPS · Arithmetic precision not specifiedFull constellation roadmapPlanned specification Notes & sourceConfiguration: Full constellation roadmap Peta operations per second as stated by the source. Numerical precision and realized utilization are not disclosed; not converted to FLOPS. Evidence basis: Planned specification Source / observation date: . Supporting source ↗4 more configurations / specifications5 POPS · Arithmetic precision not specifiedFirst twelve-satellite batch: aggregateLaunched hardware specification Notes & sourceConfiguration: Reported aggregate capability of the twelve May 2025 satellites WIC/CCTV reports 5 POPS. This is an attributed capability rating for launched hardware, not an independent sustained benchmark. Precision is unspecified; an early 4 POPS report differs, so no PFLOPS conversion or reconciliation is assumed. Evidence basis: Launched hardware specification Source / observation date: . Supporting source ↗Up to 744 TOPS · Arithmetic precision not specifiedHighest-rated member of the first batchLaunched hardware specification Notes & sourceConfiguration: Highest stated single-satellite capability in the initial batch Source states a maximum, not a uniform rating for each of twelve satellites. Precision and independent measured throughput are unspecified; do not multiply by twelve. Evidence basis: Launched hardware specification Source / observation date: . Supporting source ↗32 PFLOPS · FP8 statedLibra satellite in Xingsuan Group 02Launched hardware specification Notes & sourceConfiguration: Libra satellite in Xingsuan Group 02, nominal FP8 rating ADA Space identified Libra in its November 27 follow-up. The 32 PFLOPS FP8 figure is the satellite’s nominal rating. Evidence basis: Launched hardware specification Source / observation date: . Supporting source ↗10 POPSIbn Battuta planned satellite Operator-reported planned capability in the native POPS unit. Arithmetic precision, operation type and sustained performance are unspecified. No FLOPS conversion or measured… Planned configurationNotes & sourceConfiguration: Ibn Battuta planned satellite Operator-reported planned capability in the native POPS unit. Arithmetic precision, operation type and sustained performance are unspecified. No FLOPS conversion or measured orbital performance is established. Evidence basis: Planned configuration Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteThis is a coverage gap in the inspected published data. It does not prove that no disclosure exists elsewhere. |
Suppliers & relationships 8 suppliers / hosts · 13 relationships
Show all 13 relationships & detailsHide relationship details for Three-Body Computing Constellation
| |||||
SpaceX orbital data centersSpaceX · United StatesLatest development 26 Nov 2026 ↗Manual review 25 Nov 2026Stage detail: FCC authorization granted. Spacecraft in development. The FCC sets the first operating deadline for November 2033 and the final deployment deadline for November 2040. It lists the approved orbits and leaves the standard reentry rule in place. Last full profile review: 14 Oct 2026. Sources collected: 14 Oct 2026. Source collection and substantive profile review are separate checks. | Large-scale orbital AI computing | DevelopmentFCC authorization granted. Spacecraft in development.Next project milestoneFirst Singulus HJT solar-cell production line due in the first half of 2027, followed by targeted Gigasat production as soon as late 2027. | Up to 1,000,000 satellitesStarmind FCC-authorized constellation Maximum permitted by the FCC. No claim about the number launched or in operation. Fcc authorizationNotes & sourceConfiguration: Starmind FCC-authorized constellation Maximum permitted by the FCC. No claim about the number launched or in operation. Evidence basis: Fcc authorization Source / observation date: . Supporting source ↗2 more configurations / specificationsFirst station by Nov. 2033, 10% by Nov. 2035, 50% by Nov. 2038, full constellation by Nov. 2040Starmind FCC-authorized constellationFCC authorization condition Notes & sourceConfiguration: Starmind FCC-authorized constellation All deadlines fall on November 25 of the stated year. They require deployment, placement in the assigned orbits and operation. Evidence basis: FCC authorization condition Source / observation date: . Supporting source ↗15 yearsStarmind FCC-authorized constellation The license term begins when SpaceX certifies first compliant operation. It does not specify the life of an individual satellite. FCC authorization conditionNotes & sourceConfiguration: Starmind FCC-authorized constellation The license term begins when SpaceX certifies first compliant operation. It does not specify the life of an individual satellite. Evidence basis: FCC authorization condition Source / observation date: . Supporting source ↗ | Optimized NVIDIA Vera Rubin NVL72 rack-scale systemFirst-generation Starmind planned computing hardwareNVIDIA collaboration announcement Notes & sourceConfiguration: First-generation Starmind satellite NVIDIA identifies the planned foundation for first-generation Starmind. Final orbital configuration, quantity and delivered performance remain undisclosed. Evidence basis: NVIDIA collaboration announcement Source / observation date: . Supporting source ↗ | Up to 175 kW · Average loadAI1 compute-payload designPlanned specification Notes & sourceConfiguration: AI1 compute-payload average electrical design power Average payload design target. The separate maximum design target is 250 kW. No commissioned capacity is established. Evidence basis: Planned specification Source / observation date: . Supporting source ↗Up to 250 kW · Peak design loadAI1 proposed compute payloadPlanned specification Notes & sourceConfiguration: AI1 compute-payload peak electrical design power Peak payload design target from the rendered company page, not average or observed flight consumption. Evidence basis: Planned specification Source / observation date: . Supporting source ↗ |
Suppliers & relationships 1 supplier / host · 2 relationships
Show relationship details & sourcesHide relationship details for SpaceX orbital data centers
| |||||
Hera shared software laboratoryEuropean Space Agency (ESA) · Europe / deep spaceLatest development 25 Nov 2026 ↗Manual review with evidence gaps 27 Nov 2026Stage detail: Guest software experiments planned after asteroid investigation ESA reports that Hera tracked features on Mars for 20 minutes. The planned guest-software tests are separate, and ESA’s published estimates for their duration still differ. No completed full profile review is recorded. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Shared deep-space software experimentation | DevelopmentGuest software experiments planned after asteroid investigationNext project milestoneValidation of guest software before planned experiments in 2027. | One core for spacecraft operations and one protected guest-software environmentHera planned guest-software laboratoryOfficial planned software testbed Notes & sourceConfiguration: Hera planned guest-software laboratory Planned guest allocation on the existing spacecraft. This is not an additional spacecraft or a dedicated orbital data center. Evidence basis: Official planned software testbed Source / observation date: . Supporting source ↗1 more configurations / specificationsParallel processor streams for redundancyHera flight avionicsOperator reported flight operation Notes & sourceConfiguration: Hera flight avionics ESA reported two successful restarts to check the two streams after a software upgrade. These are spacecraft operations, separate from the planned guest experiments. Evidence basis: Operator reported flight operation Source / observation date: . Supporting source ↗ | Redwire ADPMS-3 computer with a dual-core LEON3 processorHera planned guest-software laboratorySupplier computer identification and esa processor description Notes & sourceConfiguration: Hera planned guest-software laboratory Redwire names the computer. ESA identifies the processor and says one core is reserved for protected guest software. Evidence basis: Supplier computer identification and esa processor description Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteThe August software call and November mission timeline do not establish a guest-testbed value for this field. |
Suppliers & relationships 2 suppliers / hosts · 2 relationships
Show relationship details & sourcesHide relationship details for Hera shared software laboratory
| |||||
Stardubhe orbital computing for autonomous systemsStardubhe · ChinaLatest development 25 Nov 2026 ↗Manual review 26 Nov 2026Stage detail: Ground-to-orbit computing test reported Stardubhe tested sending ground data to a satellite for AI processing and receiving the results. The district report describes the route and the tasks tested. No completed full profile review is recorded. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Orbital inference services for autonomous systems | DemonstratedGround-to-orbit computing test reportedNext project milestoneTest the service with vehicles and other equipment that work beyond mobile network coverage. | Shared space-to-ground AI computing serviceDetailed configuration not available in reviewed material. | CPU, GPU, FPGA, DSP and NPU heterogeneous computingStardubhe service architectureDesign description Notes & sourceConfiguration: Stardubhe service architecture Architecture description, without selected models or installed counts. Evidence basis: Design description Source / observation date: . Supporting source ↗1 more configurations / specificationsShared resources and cross-checks to detect and isolate faultsStardubhe service architectureDesign description Notes & sourceConfiguration: Stardubhe service architecture Design approach, without a measured fault rate. Evidence basis: Design description Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteNo numerical mission-specific specification established in reviewed official material. |
Suppliers & relationships 4 relationships
Show all 4 relationships & detailsHide relationship details for Stardubhe orbital computing for autonomous systems
| |||||
Xingyun Constellation PlanAerospace Information Research Institute, Chinese Academy of Sciences · ChinaLatest development 25 Nov 2026 ↗Manual review 27 Nov 2026Stage detail: Network plan announced The network operator outlined the planned satellite-to-ground computing link. Geovis and Shuguang Zhisuan were selected to develop the pilot. No completed full profile review is recorded. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Coordinate shared space and ground computing services | DevelopmentNetwork plan announcedNext project milestoneDisclose engineering configuration and deployment schedule. | Combine remote-sensing, communications and computing satellites into a shared service networkXingyun planned shared networkPlanned architecture Notes & sourceConfiguration: Xingyun planned shared network Planned architecture. The source’s broader thousand-satellite ecosystem wording is not an established count for this plan. Evidence basis: Planned architecture Source / observation date: . Supporting source ↗ | Planned domestic computing chips, complete servers, satellite manufacturing and applicationsXingyun planned shared networkPlanned architecture Notes & sourceConfiguration: Xingyun planned shared network No selected processor model, supplier allocation or installed configuration is specified. Evidence basis: Planned architecture Source / observation date: . Supporting source ↗1 more configurations / specificationsThree planned classes: remote-sensing satellites with high-performance edge computing, general-purpose computing satellites, and supercomputing satellitesXingyun planned shared networkPlanned architecture Notes & sourceConfiguration: Xingyun planned shared network Planned categories, without selected processor models, installed counts, arithmetic benchmarks or deployment dates. These classes are not an operating fleet. Evidence basis: Planned architecture Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteNo configuration-specific IT electrical demand is established in the inspected official sources. |
Suppliers & relationships 3 relationships
Show all 3 relationships & detailsHide relationship details for Xingyun Constellation Plan
| |||||
SpaceComputer Space FabricSpaceComputer · InternationalLatest development 24 Nov 2026 ↗Manual review with evidence gaps 27 Nov 2026Stage detail: Three missions planned for 2027 Orbitport ran during reported satellite passes. Space Fabric’s three flight tests remain planned. SpaceComputer’s sources give different quarters for its Spacemanic flight. Last full profile review: 20 Oct 2026. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Confidential satellite computing and secure communications | DevelopmentThree missions planned for 2027Next project milestoneFly the first Space Fabric demonstration mission, targeted for early 2027. | Spacemanic sovereign CubeSat payload targeting Q4 2027Space Fabric planned Spacemanic LEO payloadUnresolved conflict / configuration · Planned mission description Notes & sourceConfiguration: Space Fabric planned Spacemanic LEO payload The undated mission page states Q4 2027. The July 22 operator announcement stated Q3 2027. Preserve this attributed discrepancy and keep the LEO payload separate from the early-2027 LEO-to-GEO mission. Evidence basis: Unresolved conflict / configuration · Planned mission description Source / observation date: . Supporting source ↗1 more configurations / specificationsShared D-Orbit spacecraft demonstration planned for 2027Space Fabric D-Orbit/Aptos LEO demonstrationOfficial planned mission integration Notes & sourceConfiguration: Planned D-Orbit/Aptos LEO demonstration Developer identifies its second planned 2027 flight and first LEO-focused demonstration. No launch day or exact D-Orbit spacecraft is specified. Evidence basis: Official planned mission integration Source / observation date: . Supporting source ↗ | 2 secure elementsSpace Fabric architecture, flight mapping unconfirmedPlanned specification Notes & sourceConfiguration: Two independent secure elements in described Space Fabric architecture TROPIC01 and NXP SE050 design components. Not flight validation or processor throughput. Evidence basis: Planned specification Source / observation date: . Supporting source ↗5 more configurations / specificationsUSB Armory Mk II with NXP i.MX6UL ARM Cortex-A7 and ARM TrustZone, connected by USB to a Raspberry Pi 5 relay with TPM 2.0Space Fabric architecture, flight mapping unconfirmedOfficial implementation description Notes & sourceConfiguration: Space Fabric architecture, flight mapping unconfirmed Published implementation, with no flight configuration yet identified. The relay sits outside the critical trust path. Evidence basis: Official implementation description Source / observation date: . Supporting source ↗Two USB Armory Mk II units and two independent carrier boardsSpace Fabric design and ground implementationDesign / ground implementation Notes & sourceConfiguration: spacefabric-design Radiation-resilience architecture described in section 7.8. Not an installed flight inventory. Evidence basis: Design / ground implementation Source / observation date: . Supporting source ↗Space Fabric compute hardware and OS connected to Aptos Orbital cEDGESpace Fabric D-Orbit/Aptos LEO demonstrationOfficial planned mission integration Notes & sourceConfiguration: Planned D-Orbit/Aptos LEO demonstration cEDGE is a communications proxy to Iridium, while Space Fabric uses its own compute hardware. No processor, memory capacity or installed board count is disclosed for this configuration. Evidence basis: Official planned mission integration Source / observation date: . Supporting source ↗RISC-V-based TROPIC01 secure element paired with NXP SE050Space Fabric network architectureOfficial hardware integration design Notes & sourceConfiguration: Space Fabric network architecture The RISC-V core belongs to a security element, not the application's compute CPU. Integration and testing are reported for upcoming payloads, without a mission-specific installed inventory. Evidence basis: Official hardware integration design Source / observation date: . Supporting source ↗Google Cloud Confidential VMs using Intel TDXOrbitport ground gatewayProvider reported ground operation Notes & sourceConfiguration: Orbitport ground gateway The report identifies the hardware feature. It does not name the CPU model or install this equipment aboard a spacecraft. Evidence basis: Provider reported ground operation Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteNovember 9 comparison of the operator recap, hardware article, technical paper and supplier account found no mission-specific value for this field. |
Suppliers & relationships 7 suppliers / hosts · 9 relationships
Show all 9 relationships & detailsHide relationship details for SpaceComputer Space Fabric
| |||||
Zhongke Xingsi orbital computing networkZhongke Xingsi · ChinaLatest development 24 Nov 2026 ↗Manual review 25 Nov 2026Stage detail: Orbital payload test planned The plan starts with an orbital test of a computing payload. Later phases would connect groups of satellites. No completed full profile review is recorded. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Connect computing and storage on satellites with ground systems | Proposal / studyOrbital payload test plannedNext project milestoneTest a computing payload in orbit. | Shared orbital computing network proposalDetailed configuration not available in reviewed material. | Computing payload for an initial orbital testPlanned Zhongke Xingsi networkCompany plans reported by its partner Notes & sourceConfiguration: Planned Zhongke Xingsi network The company plans to test a computing payload before attempting satellite clusters. Evidence basis: Company plans reported by its partner Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteNo supported project-specific value is recorded in the current catalog. This does not establish zero or the absence of disclosure elsewhere. |
Suppliers & relationships 1 relationship
Show relationship details & sourcesHide relationship details for Zhongke Xingsi orbital computing network
| |||||
KunlunMeta Yuanjing Constellation (昆仑元境星座)KunlunMeta · ChinaLatest development 20 Nov 2026 ↗Manual review 27 Nov 2026Stage detail: Three validation nodes demonstrated KunlunMeta says one early satellite tested a model with 120 billion parameters in orbit. The company names three framework partners and plans 11 launches through 2028. No completed full profile review is recorded. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Shared orbital infrastructure for hosted AI models, data processing and task delivery | DemonstratedThree validation nodes demonstratedNext project milestoneFly selected payloads on L-05 and expand the constellation toward 80 satellites by the end of 2028. | 3 satellitesEarly validation nodes KunlunMeta reports three early nodes launched by October 2026. The source does not identify the spacecraft or launch dates. Company-reported status in a provincial industry noticeNotes & sourceConfiguration: Early Yuanjing validation deployment KunlunMeta reports three early nodes launched by October 2026. The source does not identify the spacecraft or launch dates. Evidence basis: Company-reported status in a provincial industry notice Source / observation date: . Supporting source ↗2 more configurations / specifications80 satellitesEnd-2028 plan Current company roadmap target for cumulative deployment by the end of 2028. Official study estimate · Company roadmapNotes & sourceConfiguration: Planned Yuanjing constellation Current company roadmap target for cumulative deployment by the end of 2028. Evidence basis: Official study estimate · Company roadmap Source / observation date: . Supporting source ↗11 planned launchesEnd-2028 plan Flights are planned from December 2026 through December 2028. The company targets a total of 80 satellites by the end of that period. Company planNotes & sourceConfiguration: End-2028 plan Flights are planned from December 2026 through December 2028. The company targets a total of 80 satellites by the end of that period. Evidence basis: Company plan Source / observation date: . Supporting source ↗ | GPT-Station Asterism onboard computing platformEnd-2028 planCompany plan Notes & sourceConfiguration: End-2028 plan KunlunMeta proposes this platform for the network. It does not identify the installed processors or memory of the early nodes. Evidence basis: Company plan Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteNo satellite IT electrical load is disclosed. |
Suppliers & relationships 3 relationships
Show all 3 relationships & detailsHide relationship details for KunlunMeta Yuanjing Constellation (昆仑元境星座)
| |||||
Project SuncatcherGoogle / Planet · United StatesLatest development 19 Nov 2026 ↗Manual review 25 Nov 2026Stage detail: Operator-reported onboard AI inference Google reported memory errors in a ground radiation test while other tests continued at higher doses. The satellite answered a prompt from orbit in October. Its sustained power and cooling performance are still unknown. Last full profile review: 20 Oct 2026. Sources collected: 20 Oct 2026. Source collection and substantive profile review are separate checks. | TPU hardware and optical interconnect validation | DemonstratedOperator-reported onboard AI inferenceNext project milestoneContinue prototype thermal and radiation tests and the separate two-satellite experiment planned for 2027, ahead of a dedicated New Glenn launch targeted for Q1 2029. | 2 satellitesSeparate planned 2027 two-satellite interconnect testPlanned specification · 2027 Notes & sourceConfiguration: Interconnect experiment Separate from the initial Transporter-18 TPU hardware-survival test. Evidence basis: Planned specification · 2027 Source / observation date: . Supporting source ↗2 more configurations / specifications1 prototype satellite2026 TPU survival-test prototype One prototype launched October 1, 2026. Google's October30 report establishes an operator-reported onboard Gemma4 workload response, not a commercial fleet or measured throughput. Official operator launch accountNotes & sourceConfiguration: 2026 TPU survival-test prototype One prototype launched October 1, 2026. Google's October30 report establishes an operator-reported onboard Gemma4 workload response, not a commercial fleet or measured throughput. Evidence basis: Official operator launch account Source / observation date: . Supporting source ↗81 satellitesSuncatcher illustrative formation study One possible formation used to test orbital dynamics. This is not the expected fleet size. Official study estimate · Illustrative simulationNotes & sourceConfiguration: Suncatcher illustrative formation study One possible formation used to test orbital dynamics. This is not the expected fleet size. Evidence basis: Official study estimate · Illustrative simulation Source / observation date: . Supporting source ↗ | Roughly one data-center rack’s computing capacity per satellitePlanned 2029 heavy-lift missionOfficial announced mission design Notes & sourceConfiguration: Suncatcher dedicated heavy-lift mission targeted for Q1 2029 Qualitative mission-design comparison. TPU count, model, arithmetic throughput and precision are not specified. Not assigned to the 2026 prototype or 2027 twin-satellite experiment. Evidence basis: Official announced mission design Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteThe September 24 and October 1 Google accounts do not disclose project-specific IT electrical power. |
Suppliers & relationships 3 suppliers / hosts · 4 relationships
Show all 4 relationships & detailsHide relationship details for Project Suncatcher
| |||||
EDGX STERNA orbital-computing demonstrationsEDGX · EuropeLatest development 18 Nov 2026 ↗Manual review with evidence gaps 26 Nov 2026Stage detail: Customer AI models demonstrated in orbit Early Bird flew on Clustergate-2. Leaving the Nest was one of five payloads on SpaceLocker’s satellite. The published GPU ratings do not use confirmed matching test settings. No completed full profile review is recorded. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Onboard AI and third-party software hosting | DemonstratedCustomer AI models demonstrated in orbitNext project milestoneOut of Tern is planned for February 2027 on Gracious Gloria, followed by Wingman on D-Orbit ION in October 2027. | D-Orbit booked to launch and host Sterna on ION Gracious GloriaOut of TernOfficial configuration or mission report Notes & sourceConfiguration: Out of Tern EDGX lists Gracious Gloria for the planned February 2027 flight. The booking covers integration and operating the payload. Evidence basis: Official configuration or mission report Source / observation date: . Supporting source ↗4 more configurations / specificationsLaunched on Clustergate-2Early Bird Sterna payloadProject specification Notes & sourceConfiguration: Early Bird Sterna payload EDGX lists the host and the March 2026 Transporter-16 launch. The initial EDGX AI results remain recorded against the March demonstrations. Evidence basis: Project specification Source / observation date: . Supporting source ↗Launched on Out-of-the-BoxLeaving the Nest Sterna payloadProject specification Notes & sourceConfiguration: Leaving the Nest Sterna payload EDGX lists the host as Out-of-the-Box on the same March 2026 launch as Early Bird. Evidence basis: Project specification Source / observation date: . Supporting source ↗5 hosted payloadsSpaceLocker Out-of-the-Box host Five payloads flew on the shared Out-of-the-Box satellite. EDGX identifies Sterna as one of them. Official launch integration releaseNotes & sourceConfiguration: SpaceLocker Out-of-the-Box host Five payloads flew on the shared Out-of-the-Box satellite. EDGX identifies Sterna as one of them. Evidence basis: Official launch integration release Source / observation date: . Supporting source ↗Two March 2026 hosted demonstrationsMarch 2026 STERNA demonstrationsRecorded description · Existing catalog prose, not a new measurement Notes & sourceConfiguration: March 2026 STERNA demonstrations One payload returned operational data within two weeks. The second still awaits satellite commissioning. Later 2027 bookings are separate. Evidence basis: Recorded description · Existing catalog prose, not a new measurement Source / observation date: . Supporting source ↗ | STERNA with NVIDIA Jetson Orin NX in Super ModeOut of Tern planned for February 2027Project specification Notes & sourceConfiguration: Out of Tern planned for February 2027 The operator explicitly maps this hardware and mode to the booked Gracious Gloria demonstration. It does not establish the March 2026 payload mode, numerical performance or sustained flight power. The October28 release describes over50percent more AI performance in Super Mode. Relative design claim only, with workload and arithmetic format unspecified. Evidence basis: Project specification Source / observation date: . Supporting source ↗3 more configurations / specificationsHyperspectral camera, STERNA, Morus based on NVIDIA Jetson Thor, and relay linkWingman planned for October 2027Project specification Notes & sourceConfiguration: Wingman planned for October 2027 The booked D-Orbit ION mission is described as the first complete EDGX payload and first Morus flight. Component models, count, workload throughput and mission power are not disclosed here. Product-wide Morus ratings are not assigned to this mission. The October 28 release identifies Morus as based on Jetson Thor. This is planned hardware, not flown performance. Evidence basis: Project specification Source / observation date: . Supporting source ↗EDGX Sterna with NVIDIA Jetson Orin NX on Clustergate-2Early BirdOfficial configuration or mission report Notes & sourceConfiguration: Early Bird DPhi Space identifies the flown GPU model in its platform specifications. EDGX names this flight Early Bird. Evidence basis: Official configuration or mission report Source / observation date: . Supporting source ↗Sterna computer with NVIDIA Jetson on Out-of-the-BoxLeaving the NestOfficial configuration or mission report Notes & sourceConfiguration: Leaving the Nest EDGX identifies the second payload and its host. The exact installed Jetson version, RAM and storage are not identified for this flight. Evidence basis: Official configuration or mission report Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteEDGX states 10 to 45 watts for the Sterna product. No measured flight demand or exact mission power setting is published. |
Suppliers & relationships 8 suppliers / hosts · 10 relationships
Show all 10 relationships & detailsHide relationship details for EDGX STERNA orbital-computing demonstrations
| |||||
Kepler Tranche 1Kepler Communications · CanadaLatest development 18 Nov 2026 ↗Manual review 26 Nov 2026Stage detail: Commercial services operating Kepler reports commercial relay and computing service. Sophia Space used several satellites to test how its software coordinates work and handles failures. Last full profile review: 15 Oct 2026. Sources collected: 23 Oct 2026. Source collection and substantive profile review are separate checks. | Optical relay, distributed compute and hosted nodes | OperatingCommercial services operatingNext project milestoneExpand customer use of the operating relay and computing network. | 10 satellitesFirst tranche: aggregate across ten satellitesLaunched hardware specification Notes & sourceConfiguration: First Kepler optical-relay tranche Counts spacecraft, including those carrying hosted services. Do not add Axiom node counts to this asset total. Evidence basis: Launched hardware specification Source / observation date: . Supporting source ↗1 more configurations / specificationsSingle-node and clustered distributed workloads, with reassignment when a node is unavailableFirst tranche: ten-satellite compute networkOfficial attributed description Notes & sourceConfiguration: First tranche: ten-satellite compute network Described in Kepler’s March 16, 2026 commissioning announcement. Evidence basis: Official attributed description Source / observation date: . Supporting source ↗ | 40 Jetson Orin modulesFirst tranche: aggregate across ten satellitesReported demonstration Notes & sourceConfiguration: Distributed computing across ten Tranche 1 satellites Commissioned hardware modules, not forty satellites or measured throughput. No conversion to FLOPS or IT power. Evidence basis: Reported demonstration Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteLaunch, commissioning and commercial-service accounts reviewed November 7 do not provide a configuration-specific numerical specification for this field. |
Suppliers & relationships 3 suppliers / hosts · 3 relationships
Show all 3 relationships & detailsHide relationship details for Kepler Tranche 1
| |||||
Sophia Orbital Operating System (SOOS)Sophia Space · GlobalLatest development 18 Nov 2026 ↗Manual review 26 Nov 2026Stage detail: Distributed software functions demonstrated in orbit Sophia ran its software across multiple Kepler satellites. Kepler identifies the host processor family as NVIDIA Jetson Orin. PiLogic’s separate ground test is planned. No completed full profile review is recorded. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Manage and orchestrate computing workloads across shared orbital infrastructure | DemonstratedDistributed software functions demonstrated in orbitNext project milestonePartner application deployments and further testing of distributed workloads. | Distributed operating-system functions across multiple Kepler Tranche 1 satellitesSOOS on Kepler spacecraftOfficial operator software deployment account Notes & sourceConfiguration: SOOS on Kepler spacecraft Operator-reported software demonstration. Exact spacecraft identities and deployment dates are not given. These are hosted software nodes on existing spacecraft. Evidence basis: Official operator software deployment account Source / observation date: . Supporting source ↗ | NVIDIA Jetson Orin on the participating Kepler Tranche 1 spacecraftSOOS on Kepler spacecraftKepler host specification and Sophia demonstration report Notes & sourceConfiguration: SOOS on Kepler spacecraft Sophia reported using multiple GPUs on participating satellites. Kepler confirms 40 Orin modules across the ten-satellite host fleet. The reports do not name the Orin variant or the number of modules used in the SOOS test. Evidence basis: Kepler host specification and Sophia demonstration report Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteThe November 18 deployment release and FAQ do not establish a deployment-specific numerical value for this field. |
Suppliers & relationships 3 suppliers / hosts · 4 relationships
Show all 4 relationships & detailsHide relationship details for Sophia Orbital Operating System (SOOS)
| |||||
ATHENE-1 / SeRANIS orbital research platformUniversität der Bundeswehr München / LuxSpace · Europe · GermanyLatest development 17 Nov 2026 ↗Manual review 27 Nov 2026Stage detail: Launched research platform, experiments planned LuxSpace identifies two flight computers and describes the ground thermal tests. The mission team confirmed first contact. Results from the individual experiments have not been reported. No completed full profile review is recorded. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Shared orbital research platform | LaunchedLaunched research platform, experiments plannedNext project milestoneRead a dated mission-specific result or revised flight-test milestone when available. | 15 payloads supporting 22 scientific experimentsATHENE-1 flight platformOfficial project-specific source Notes & sourceConfiguration: ATHENE-1 launched research platform One shared research satellite. Experiments and payloads are not additional satellites. Evidence basis: Official project-specific source Source / observation date: . Supporting source ↗1 more configurations / specificationsMore than 30 individual payload unitsATHENE-1 flight platformLuxSpace project presentation at ESA Notes & sourceConfiguration: ATHENE-1 flight platform LuxSpace counts individual units, while the university release reports 15 payloads for 22 experiments. These different counts are not added. Evidence basis: LuxSpace project presentation at ESA Source / observation date: . Supporting source ↗ | LuxSpace Triton-X Heavy with UniBw multifunctional experimental payloadATHENE-1 flight platformOfficial project-specific source Notes & sourceConfiguration: ATHENE-1 launched research platform Specific flown bus identified by October 2026 operator/provider sources. No exact AI-OBC processor model is supplied. Evidence basis: Official project-specific source Source / observation date: . Supporting source ↗2 more configurations / specificationsDedicated AI-OBC for demanding AI/non-AI tasks, separate communication DSPs and a payload-control subsystem for simple processingATHENE mission designOfficial project-specific source Notes & sourceConfiguration: ATHENE mission design Prelaunch mission architecture. AI-OBC model/count and installed RAM/storage remain unknown. Do not assume all tasks run on one identical processor. Evidence basis: Official project-specific source Source / observation date: . Supporting source ↗2 integrated avionics computersATHENE-1 flight platform LuxSpace identifies two installed Integrated Avionic Units. The report does not identify either unit as the separate AI computer. LuxSpace project presentation at ESANotes & sourceConfiguration: ATHENE-1 flight platform LuxSpace identifies two installed Integrated Avionic Units. The report does not identify either unit as the separate AI computer. Evidence basis: LuxSpace project presentation at ESA Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteNo current numerical project-specific specification established in the reviewed official material. |
Suppliers & relationships 7 suppliers / hosts · 7 relationships
Show all 7 relationships & detailsHide relationship details for ATHENE-1 / SeRANIS orbital research platform
| |||||
Kepler Tranche 2Kepler Communications · CanadaLatest development 17 Nov 2026 ↗Manual review with evidence gaps 26 Nov 2026Stage detail: Launch arranged Kepler lists 400 kg-class satellites for Motus Via Sol and 300 kg-class satellites in its general 2028 hosting offer. Kepler has not said which launch will carry the spacecraft in the hosting offer. Last full profile review: 15 Oct 2026. Sources collected: 23 Oct 2026. Source collection and substantive profile review are separate checks. | Optical relay, onboard compute and hosted payload expansion | DevelopmentLaunch arrangedNext project milestoneMultiple 2028 launches: dedicated Neutron mission no earlier than 2028 and ten-satellite Motus Via Sol allocation targeted for mid-2028. | 10 satellitesMotus Via Sol ten-satellite allocationPlanned specification · Mid-2028 Notes & sourceConfiguration: Motus Via Sol allocation Launch capacity secured for this tranche. Does not count Kepler’s earlier fleet. Evidence basis: Planned specification · Mid-2028 Source / observation date: . Supporting source ↗1 more configurations / specificationsTen Tranche 2 host spacecraft for Vyoma FlaHOPs allocationVyoma-hosting dedicated launch allocationAnnounced design or research specification Notes & sourceConfiguration: Vyoma-hosting dedicated launch allocation The release links the dedicated Neutron mission. Separate from the existing Motus Via Sol ten-satellite allocation, without an inferred aggregate. Evidence basis: Announced design or research specification Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteDirect November8 source comparison and targeted processor, memory, electrical/thermal and communications searches found no additional configuration-specific numerical value for this field. Existing source-scoped design descriptions and held references remain separate. | Not disclosed in reviewed sources Coverage noteDirect November8 source comparison and targeted processor, memory, electrical/thermal and communications searches found no additional configuration-specific numerical value for this field. Existing source-scoped design descriptions and held references remain separate. |
Suppliers & relationships 4 suppliers / hosts · 5 relationships
Show all 5 relationships & detailsHide relationship details for Kepler Tranche 2
| |||||
Lonestar data centersLonestar Data Holdings · United StatesLatest development 17 Nov 2026 ↗Manual review 27 Nov 2026Stage detail: Demonstration program Freedom used a Microchip processor running Linux and reported a networking test on the way to the Moon. The first StarVault’s 488 TB of raw storage and about 370 TB usable remain planned. Last full profile review: 19 Oct 2026. Sources collected: 19 Oct 2026. Source collection and substantive profile review are separate checks. | Lunar and orbital storage and processing | DemonstratedDemonstration programNext project milestoneFirst StarVault payload is planned aboard LizzieSat-4 on SpaceX Bandwagon-6, alongside LizzieSat-5, no earlier than April 2027. Timing depends on qualification, integration and launch readiness. | Hosted Freedom aboard Intuitive Machines’ Athena landerAthena lunar lander on IM-2Official mission account Notes & sourceConfiguration: Athena lunar lander on IM-2 Lonestar reported storage and edge-processing tests during the transit to the Moon. Evidence basis: Official mission account Source / observation date: . Supporting source ↗1 more configurations / specificationsScheduled to host the first StarVault payloadLizzieSat-4 host spacecraftMission plan Notes & sourceConfiguration: LizzieSat-4 host spacecraft Sidus identifies LizzieSat-4 as the spacecraft assigned to the first StarVault payload. The September 2026 announcement gives the updated launch target. Evidence basis: Mission plan Source / observation date: . Supporting source ↗ | Phison Pascari Space SSD storageStarVault-001Official supplier planned configuration Notes & sourceConfiguration: StarVault-001 planned storage payload Supplier names the storage family. Individual drive models, counts and mission-specific endurance or radiation limits are unspecified. Generic portfolio ratings are not installed payload specifications. Evidence basis: Official supplier planned configuration Source / observation date: . Supporting source ↗2 more configurations / specificationsMicrochip PolarFire system-on-chip with a RISC-V processor, running LinuxFreedomLonestar’s published mission hardware Notes & sourceConfiguration: Freedom Lonestar announced this hardware for Freedom on IM-2. The source does not identify an exact chip variant. Evidence basis: Lonestar’s published mission hardware Source / observation date: . Supporting source ↗Phison Pascari enterprise solid-state storageFreedomOfficial Freedom mission account Notes & sourceConfiguration: Freedom Phison names its enterprise storage for Freedom. This is separate from the later Pascari Space supply for StarVault-001. Evidence basis: Official Freedom mission account Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteThis is a coverage gap in the inspected published data. It does not prove that no disclosure exists elsewhere. |
Suppliers & relationships 12 suppliers / hosts · 23 relationships
Show all 23 relationships & detailsHide relationship details for Lonestar data centers
| |||||
Parsimoni SpaceOSParsimoni · Europe / United StatesLatest development 17 Nov 2026 ↗Manual review with evidence gaps 25 Nov 2026Stage detail: Software demonstrated in orbit Borealis ran on Clustergate-2 in April 2026. Parsimoni’s homepage reports that encryption keys were changed in orbit, but gives no date or test details. Necara’s software integration is planned. No completed full profile review is recorded. Sources collected: 10 Oct 2026. Source collection and substantive profile review are separate checks. | Secure software deployment and application sharing on satellite payload computers | DemonstratedSoftware demonstrated in orbitNext project milestoneFurther payload deployments and mission-specific validation of secure software updates. | SpaceOS deployed in orbit and undergoing operational testsSpaceOS on Clustergate-1Company reported orbital software demonstration Notes & sourceConfiguration: SpaceOS on Clustergate-1 March 24 account reports software deployment, not completed customer-service readiness. Evidence basis: Company reported orbital software demonstration Source / observation date: . Supporting source ↗1 more configurations / specificationsNon-real-time payload platform in a separate partition alongside existing spacecraft flight softwareGeneric SpaceOS software designCompany software design claim Notes & sourceConfiguration: Generic SpaceOS software design Generic product architecture. Bus, attitude, thermal and power-control software remains outside SpaceOS. Evidence basis: Company software design claim Source / observation date: . Supporting source ↗ | Arm SoC with four Cortex-A53 cores running LinuxBorealis on Clustergate-2Company reported orbital software demonstration Notes & sourceConfiguration: Borealis on Clustergate-2 Host-module configuration reported for the Borealis guest. SoC model and dedicated CPU allocation are not supplied. Evidence basis: Company reported orbital software demonstration Source / observation date: . Supporting source ↗2 more configurations / specificationsInnoflight CFC-400XS with SpaceOS planned as an integrated offeringPlanned CFC-400XS and SpaceOS offeringAnnounced product integration Notes & sourceConfiguration: Planned CFC-400XS and SpaceOS offering The computer's existing flight heritage is not evidence that the combined SpaceOS offering has flown. Evidence basis: Announced product integration Source / observation date: . Supporting source ↗Applications as single-address-space VMs under KVM, Xen or Muen on ARM or x86 payload computersGeneric SpaceOS software designCompany software design claim Notes & sourceConfiguration: Generic SpaceOS software design Company reports validation on eight onboard computers, without a full model list or mapping all hypervisors to each flight. The Borealis Linux process remains a distinct configuration. Evidence basis: Company software design claim Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteThe reviewed SpaceOS flight accounts and integration announcement establish no configuration-specific numeric specification for this field. |
Suppliers & relationships 3 suppliers / hosts · 8 relationships
Show all 8 relationships & detailsHide relationship details for Parsimoni SpaceOS
| |||||
OpenConstellation 1.0 onboard image processingOpen Cosmos · EuropeLatest development 16 Nov 2026 ↗Manual review 29 Nov 2026Stage detail: First satellites launched Open Cosmos reported that Posidònia and Hyperion GR-1 reached orbit in July 2026. Greece’s November register names the Hyperion operator and gives its orbit. The 30-minute target is for delivering useful imagery or information. No completed full profile review is recorded. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Multiple customers share satellite infrastructure. The onboard processing analyzes the satellites’ own Earth imagery before it is sent to users. | LaunchedFirst satellites launchedNext project milestoneOpen Cosmos plans to expand the network. The launch announcement gave a goal of delivering useful information in as little as 30 minutes. | Shared Earth observation satellites with onboard image analysisDetailed configuration not available in reviewed material. | Not disclosed in reviewed sources Coverage noteThe sources reviewed do not give a value for this configuration. | Not disclosed in reviewed sources Coverage noteThe sources reviewed do not give a value for this configuration. |
Suppliers & relationships 2 suppliers / hosts · 3 relationships
Show all 3 relationships & detailsHide relationship details for OpenConstellation 1.0 onboard image processing
| |||||
Zhongke Tiansuan PlanZhongke Tiansuan · ChinaLatest development 14 Nov 2026 ↗Manual review with evidence gaps 21 Nov 2026Stage detail: Planned research and development Compared the new Aurora 5000C report with the existing prototype, two-satellite plan and center forecasts. The named payload is built for flight testing, while its launch date and exact operating specifications remain undisclosed. The latest center target is around 2035. Last full profile review: 14 Oct 2026. Sources collected: 14 Oct 2026. Source collection and substantive profile review are separate checks. | Shared orbital computing, integrated power research and weather AI | DevelopmentPlanned research and developmentNext project milestoneLaunch Aurora 5000C for in-orbit validation and continue the planned two-satellite demonstration before March 2027. | Space-supercomputing core nodes coordinate with weather satellites as edge-intelligence nodesYunyao weather-computing planOfficial government published cooperation plan Notes & sourceConfiguration: Planned Yunyao weather-computing cooperation Proposed cloud-edge architecture. Yunyao's90GNSS and24remote-sensing constellation plans are not Zhongke compute deployments or additional computing assets. Evidence basis: Official government published cooperation plan Source / observation date: . Supporting source ↗2 more configurations / specifications2 satellitesComospace, Hangsheng and Yanhe planned demonstration April21 2026 agreement targets development, integration, launch and orbital validation before March2027. No completed launch or additional count on top of the proposed 2030 centre… Official announced development agreementNotes & sourceConfiguration: Comospace, Hangsheng and Yanhe planned demonstration April21 2026 agreement targets development, integration, launch and orbital validation before March2027. No completed launch or additional count on top of the proposed 2030 centre is inferred. Evidence basis: Official announced development agreement Source / observation date: . Supporting source ↗Ten-thousand-card-scale space supercomputing center around 2035Proposed 2035 center roadmapCompany roadmap reported by shanghai party newspaper Notes & sourceConfiguration: November 2026 center roadmap This is a proposed deployment target. Earlier sources described a center around 2030 and are retained as historical forecasts. Evidence basis: Company roadmap reported by shanghai party newspaper Source / observation date: . Supporting source ↗ | 10 POPS-level AI rating, arithmetic precision unspecifiedComospace and Yanhe ground-integrated prototypeCompany-reported ground development Notes & sourceConfiguration: Comospace and Yanhe ground-integrated prototype Yanhe reports joint development and integration tests. This is a company-reported prototype rating, without a measured benchmark, numerical precision or confirmed flight allocation. Distinct from the 2030 centre and generic Aurora product ranges. Evidence basis: Company-reported ground development Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteThe inspected official-government accounts do not establish a configuration-specific value for this field. Solar generation is not IT demand, product-family ratings are not installed hardware, and roadmap dates are not design life. |
Suppliers & relationships 2 suppliers / hosts · 5 relationships
Show all 5 relationships & detailsHide relationship details for Zhongke Tiansuan Plan
| |||||
Huanyu Haohang–Hangsheng VLEO computing networkSuzhou Huanyu Haohang and Hunan Hangsheng · ChinaLatest development 12 Nov 2026 ↗Manual review 21 Nov 2026Stage detail: Planned constellation Compared the August agreement account with Hunan’s November follow-up. The proposed 1,920-satellite total, two-satellite 2027 test and 24-satellite network test remain unchanged. Current sources still do not give payload models, throughput, storage, numerical orbit, power, thermal limits or spacecraft mass. No completed full profile review is recorded. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Shared very-low-orbit communications and computing infrastructure | Proposal / studyPlanned constellationNext project milestoneTwo technology-validation satellites are planned for 2027, followed by a 24-satellite network-validation phase. | 1,920 satellitesHuanyu Haohang–Hangsheng VLEO plan Proposed overall constellation size, also repeated by Hunan's industry department on November 12. Not launched capacity. Company agreement reported by municipal newspaperNotes & sourceConfiguration: Proposed Huanyu Haohang–Hangsheng constellation Proposed overall constellation size, also repeated by Hunan's industry department on November 12. Not launched capacity. Evidence basis: Company agreement reported by municipal newspaper Source / observation date: . Supporting source ↗3 more configurations / specifications2 satellitesHuanyu Haohang–Hangsheng VLEO plan Initial technology-validation phase planned for 2027. A phase within the 1,920-satellite plan, not an additional constellation. Company agreement reported by municipal newspaperNotes & sourceConfiguration: Proposed Huanyu Haohang–Hangsheng constellation Initial technology-validation phase planned for 2027. A phase within the 1,920-satellite plan, not an additional constellation. Evidence basis: Company agreement reported by municipal newspaper Source / observation date: . Supporting source ↗24 satellitesHuanyu Haohang–Hangsheng VLEO plan Network-validation phase follows the initial two spacecraft. No specific follow-on launch date is established and the phase is not added to the overall 1,920 target. Company agreement reported by municipal newspaperNotes & sourceConfiguration: Proposed Huanyu Haohang–Hangsheng constellation Network-validation phase follows the initial two spacecraft. No specific follow-on launch date is established and the phase is not added to the overall 1,920 target. Evidence basis: Company agreement reported by municipal newspaper Source / observation date: . Supporting source ↗2026–2030 planned construction windowHuanyu Haohang–Hangsheng VLEO planCompany agreement reported by municipal newspaper Notes & sourceConfiguration: Proposed Huanyu Haohang–Hangsheng constellation Roadmap for planning, development, deployment and operations. This is not a spacecraft design-life specification. Evidence basis: Company agreement reported by municipal newspaper Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteThe inspected agreement and government follow-up do not give a configuration-specific specification for this field. | Not disclosed in reviewed sources Coverage noteThe inspected agreement and government follow-up do not give a configuration-specific specification for this field. |
Suppliers & relationships 2 suppliers / hosts · 2 relationships
Show relationship details & sourcesHide relationship details for Huanyu Haohang–Hangsheng VLEO computing network
| |||||
NeuralSat orbital computing and data relay networkNeuralSat · GermanyLatest development 12 Nov 2026 ↗Manual review with evidence gaps 21 Nov 2026Stage detail: In development NeuralSat still describes a planned shared orbital relay and computing network with a 50 Gbit per second relay ceiling and configurable edge clusters. Its homepage still conflicts between TFOPS and TOPS, while installed processors, memory, power, thermal design and orbit remain unpublished. No completed full profile review is recorded. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Shared satellite data relay and processing services | DevelopmentIn developmentNext project milestoneAn initial orbital demonstration is planned for 2027. The first constellation launches are targeted from 2028. | Data relay and distributed processing shared by satellite operatorsNeuralSat planned networkPlanned specification Notes & sourceConfiguration: Planned NeuralSat orbital network The investor describes distributed processing across multiple satellites. The network is in development. Evidence basis: Planned specification Source / observation date: . Supporting source ↗2 more configurations / specificationsFirst orbital demonstration planned for 2027NeuralSat 2027 demonstrationPlanned specification Notes & sourceConfiguration: Planned initial orbital demonstration Announced development target. A specific launch date and demonstrated results are not reported. Evidence basis: Planned specification Source / observation date: . Supporting source ↗First constellation launches targeted from 2028NeuralSat planned networkPlanned specification Notes & sourceConfiguration: Planned NeuralSat orbital network Initial launch target rather than a completed deployment. Evidence basis: Planned specification Source / observation date: . Supporting source ↗ | Distributed computing clusters and AI accelerationNeuralSat planned networkPlanned specification Notes & sourceConfiguration: Planned NeuralSat orbital network Planned service architecture. No processor model, installed count or arithmetic format is specified. Evidence basis: Planned specification Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteThe inspected official company homepage, services, products and investor announcement do not specify a configuration-specific value for this field. |
Suppliers & relationships No relationships recorded. View project organizations → | |||||
OwlO Orbital Cloud NodesOwlO Cloud · Luxembourg / EuropeLatest development 12 Nov 2026 ↗Manual review with evidence gaps 21 Nov 2026Stage detail: Proposed Compared OwlO Cloud’s current network description with its 2030 roadmap and preliminary collaborations. The site describes three prototype orbital computing nodes in the founder’s experience but does not identify them as OwlO deployments. Node hardware, memory, power, thermal design, orbit and launch plan remain undisclosed. No completed full profile review is recorded. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Shared orbital computing and storage services | Proposal / studyProposedNext project milestoneDevelop the initial Orbital Cloud Nodes network, targeting operations in 2030. | Initial network targeted for 2030Initial OwlO networkFounder interview Notes & sourceConfiguration: Planned OwlO Orbital Cloud Nodes network CEO interview gives the deployment target. Evidence basis: Founder interview Source / observation date: . Supporting source ↗1 more configurations / specificationsAt least 10 satellitesInitial OwlO network The CEO interview account describes at least ten nodes by 2030. The distributed company announcement says more than ten, so ten is retained only as a lower bound. Founder interviewNotes & sourceConfiguration: Planned OwlO Orbital Cloud Nodes network The CEO interview account describes at least ten nodes by 2030. The distributed company announcement says more than ten, so ten is retained only as a lower bound. Evidence basis: Founder interview Source / observation date: . Supporting source ↗ | Cooperating data processing and storage nodesInitial OwlO networkPlanned architecture Notes & sourceConfiguration: Planned OwlO Orbital Cloud Nodes network The operator describes shared processing across nodes without specifying processor models or installed counts. Evidence basis: Planned architecture Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteNo project-specific value for this field was established from the official website and inspected announcement material. Generic conference architecture is not an installed configuration. |
Suppliers & relationships 1 supplier / host · 2 relationships
Show relationship details & sourcesHide relationship details for OwlO Orbital Cloud Nodes
| |||||
JAXA D-OBEC / QPS-SAR12JAXA / iQPS · JapanLatest development 10 Nov 2026 ↗Manual review 26 Nov 2026Stage detail: In-orbit demonstrations Rocket Lab confirmed the host satellite entered a circular orbit at 575 km. JAXA’s app selection and Space Shift’s four ship detection trials are separate steps. Last full profile review: 16 Oct 2026. Sources collected: 16 Oct 2026. Source collection and substantive profile review are separate checks. | Post-launch AI apps and SAR image processing | DemonstratedIn-orbit demonstrationsNext project milestoneFurther results from the selected AI apps and confirmation of continuing demonstration operations; no firm next event date disclosed. | 1 satelliteD-OBEC mission / H²-OBC computerLaunched hardware specification Notes & sourceConfiguration: QPS-SAR12 host carrying JAXA D-OBEC Single named host confirmed by iQPS and JAXA; other iQPS spacecraft and selected apps are not additional compute satellites. Evidence basis: Launched hardware specification Source / observation date: . Supporting source ↗ | AMD Ryzen Embedded V1605B with Radeon Vega 8 graphics and one Intel Movidius Myriad VPU, NCS2-equivalentD-OBEC mission / H²-OBC computerPublished environment specification Notes & sourceConfiguration: D-OBEC mission / H²-OBC computer JAXA's July 15, 2025 host-environment specification. Trial apps may use CPU or VPU base images and cannot access the GPU. H²-OBC's accepted modified-Unibap-iX10 provenance is retained, without importing a generic processor benchmark or inferring installed current utilization. Evidence basis: Published environment specification Source / observation date: . Supporting source ↗ | About 0.04 kWD-OBEC mission / H²-OBC computer JAXA lists approximately 40 W for the computer. Rating condition and exact current flight consumption are not stated; exclude host spacecraft demand. Reported specificationNotes & sourceConfiguration: JAXA H²-OBC computer JAXA lists approximately 40 W for the computer. Rating condition and exact current flight consumption are not stated; exclude host spacecraft demand. Evidence basis: Reported specification Source / observation date: . Supporting source ↗ |
Suppliers & relationships 6 suppliers / hosts · 15 relationships
Show all 15 relationships & detailsHide relationship details for JAXA D-OBEC / QPS-SAR12
| |||||
Mitsubishi Electric–NTT megaconstellation studyMitsubishi Electric and four partners · JapanLatest development 9 Nov 2026 ↗Manual review 24 Nov 2026Stage detail: Joint feasibility study Mitsubishi Electric, NTT, and three partners are studying whether a satellite network could support services including space data centers. The partners have set out their roles in the study. No completed full profile review is recorded. Sources collected: Date unavailable. Source collection and substantive profile review are separate checks. | Joint feasibility research for multi-service satellite infrastructure including space data centers | Proposal / studyJoint feasibility studyNext project milestoneJoint technical and commercial feasibility findings | Satellite-network and space-data-center feasibility studyDetailed configuration not available in reviewed material. | Digital Space Interface considered for adding and updating onboard softwareFive-company megaconstellation studyIssuer feasibility study description Notes & sourceConfiguration: Five-company megaconstellation concept Open interface under development by the Digital Space Consortium. Adoption in the proposed constellation is under study. Evidence basis: Issuer feasibility study description Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteThe joint-study announcement does not select a mission configuration or disclose a quantitative it specification. |
Suppliers & relationships 4 relationships
Show all 4 relationships & detailsHide relationship details for Mitsubishi Electric–NTT megaconstellation study
| |||||
Tiansuan / BUPT Orbital Computing Research PlatformBeijing University of Posts and Telecommunications / Spacety · ChinaLatest development 5 Nov 2026 ↗Manual review 23 Nov 2026Stage detail: Research satellites launched BUPT-4 launched on July 22, 2026. Beijing’s separate cloud platform pools resources from several operators, including BUPT. Last full profile review: 18 Oct 2026. Sources collected: 18 Oct 2026. Source collection and substantive profile review are separate checks. | Open satellite computing and network-security experiments | LaunchedResearch satellites launchedNext project milestonePublish current per-node experiment and federated-cloud service availability, verified benchmarks and further phase-two launches | 24 satellitesPhase-two roadmap, not deployed totalPlanned specification Notes & sourceConfiguration: Tiansuan second-phase deployment plan Planned phase-two total. Do not infer that 24 satellites have launched or add earlier repository phase figures as deployed capacity. Evidence basis: Planned specification Source / observation date: . Supporting source ↗3 more configurations / specifications16 satellitesResearch network reported September 7, 2026 Beijing Haidian Commerce Bureau reports a network of sixteen LEO satellites. This is an attributed program snapshot, not sixteen dedicated compute satellites, an audited live… Reported specificationNotes & sourceConfiguration: Research network reported September 7, 2026 Beijing Haidian Commerce Bureau reports a network of sixteen LEO satellites. This is an attributed program snapshot, not sixteen dedicated compute satellites, an audited live count, or an amount additional to historical launch batches. Evidence basis: Reported specification Source / observation date: . Supporting source ↗More than 40 satellite resourcesFederated cloud resource pool, October 2026 Reported coverage is more than 40 satellite resources, including BUPT-2/3 and third-party spacecraft. It is not an independently audited active count, a new launch batch or… Attributed government platform accountNotes & sourceConfiguration: Beijing center federated cloud released October 30, 2026 Reported coverage is more than 40 satellite resources, including BUPT-2/3 and third-party spacecraft. It is not an independently audited active count, a new launch batch or capacity additional to the 16-satellite Tiansuan snapshot. Evidence basis: Attributed government platform account Source / observation date: . Supporting source ↗Planned twelve-satellite network and native space-computing chip verification in 2028Tiansuan 2027–2029 roadmapAttributed chief scientist interview Notes & sourceConfiguration: Tiansuan 2027–2029 roadmap The same roadmap plans an open-source computing satellite in2027 and commercial operations in2029. This is a dated plan, distinct from the earlier24-satellite phase-two target. Evidence basis: Attributed chief scientist interview Source / observation date: . Supporting source ↗ | Satellite-computing module and satellite-network security moduleBUPT-4 / TY49 spacecraftOfficial launch hardware description Notes & sourceConfiguration: BUPT-4 / TY49 spacecraft University launch account identifies these modules and a small remote-sensing camera. Processor models, memory and computing throughput are not specified. Launch telemetry is not a sustained compute benchmark. The university-authored July 23 launch account on Beijing Daily's author platform confirms the same modules and camera at https://peking.bjd.com.cn/content/s6a622584e4b0e45f3fd517fc.html. Evidence basis: Official launch hardware description Source / observation date: . Supporting source ↗1 more configurations / specificationsGround CPU, GPU and NPU resources pooled with satellite resourcesFederated cloud resource pool, October 2026Attributed government platform account Notes & sourceConfiguration: Beijing center federated cloud released October 30, 2026 These processor classes describe the ground resource pool. No installed orbital processor model, accelerator count, throughput or arithmetic precision is specified. Evidence basis: Attributed government platform account Source / observation date: . Supporting source ↗ | Not disclosed in reviewed sources Coverage noteUniversity-authored BUPT-4 launch account and supplier solar-wing mission account do not give installed processor ratings, RAM, storage capacity or IT-only electrical power. The separately reported token-per-joule claim lacks an identified configuration and benchmark. |
Suppliers & relationships 6 suppliers / hosts · 18 relationships
Show all 18 relationships & detailsHide relationship details for Tiansuan / BUPT Orbital Computing Research Platform
| |||||
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.