SignalSpore

SPACE DATA CENTERS
SUPPLIER INTELLIGENCE

SPACE COMPUTINGOrbital and lunar data centers
PROJECT COMPARISON

Space Data Centers Database

Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.

Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.

67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.

Which space data center projects have launched?

PROJECTS & RELATIONSHIPS

Compare the work behind each project.

Market & supply chainFinancingSuppliers
103 projects matching71 with supplier records32 no supplier record
Relationship filters

1–25 of 103 projects shown

Technical specifications and an inline supplier and relationship preview for each project. Expand relationship details without leaving the table.
Project / developerIntended useDevelopment statusConfiguration / scopeCompute / hardwareIT electrical power
Chenguang-1 (辰光一号)Beijing Xingchen Future Space Technology Research Institute / Beijing Orbital Chenguang Technology · ChinaLatest development 27 Nov 2026 ↗
Manual review with evidence gaps 28 Nov 2026

Stage detail: Research test service open

Chenguang-1 is open to researchers. The institute unveiled SUICE at the same event and did not report running that software aboard the satellite.

Last full profile review: 22 Oct 2026.

Sources collected: 22 Oct 2026.

Source collection and substantive profile review are separate checks.

Shared compute, power and thermal validationOperatingResearch test service open
Next project milestone

Publish detailed benchmark methods and follow-on deployment schedule

1 satelliteChenguang-1 demonstratorLaunched hardware specification
Notes & source

Configuration: Chenguang-1 demonstrator

Entered its planned orbit on 24 July 2026; in-orbit technology validation was still to follow.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
8 accelerator cardsChenguang-1 demonstratorLaunched hardware specification
Notes & source

Configuration: Server on Chenguang-1

The source describes an eight-card server sent into orbit. Accelerator models and benchmark performance are not disclosed.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
2 more configurations / specifications
Guoke Huanyu developed payload, integrated electronics, energy and fluid-loop cooling chainsChenguang-1 demonstratorUniversity component developer report and ground tests
Notes & source

Configuration: Chenguang-1 delivered power-conversion and systems hardware

University account of mission-specific responsibilities. It does not identify the eight accelerator-card models.

Evidence basis: University component developer report and ground tests

Source / observation date: .

Supporting source ↗
Radiation-hardened domestic commercial server operating in orbitChenguang-1 demonstratorGovernment reported third party orbital evaluation
Notes & source

Configuration: Chenguang-1 in-orbit evaluation

The result reports stable operation but does not name the server manufacturer, processor models, memory or storage. The existing eight-card launch metric remains the supported configuration count.

Evidence basis: Government reported third party orbital evaluation

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The reviewed roadmap and solar-technology disclosures do not establish a Chenguang-1 IT electrical load.

Suppliers & relationships

8 suppliers / hosts · 12 relationships

Show all 12 relationships & detailsHide relationship details for Chenguang-1 (辰光一号)Open relationship research →
Three-Body Computing ConstellationZhejiang Lab / ADA Space / partners · ChinaLatest development 27 Nov 2026 ↗
Manual review with evidence gaps 27 Nov 2026

Stage detail: In-orbit computing tests reported

ADA Space reported a full AI training run in orbit and confirmed that Libra was the satellite used. STAR.VISION has not confirmed a launch for Marco Polo and Ibn Battuta.

Last full profile review: 15 Oct 2026.

Sources collected: 15 Oct 2026.

Source collection and substantive profile review are separate checks.

Distributed computing, networking and AI researchDemonstratedIn-orbit computing tests reported
Next project milestone

Test the Group 02 laser links between satellites and to Earth.

12 satellitesFirst twelve-satellite batch: aggregateLaunched hardware specification
Notes & source

Configuration: First constellation batch

Launch count for the first batch, not a claim that all satellites remain operational.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
7 more configurations / specifications
2 planned satellitesMarco Polo / Ibn Battuta planned pair

October 9 recap targets Q4 2026 launch. No launcher, exact date, completed deployment or commissioning is established. Parent ecosystem membership does not establish a current…

Planned configuration
Notes & source

Configuration: Marco Polo / Ibn Battuta planned pair

October 9 recap targets Q4 2026 launch. No launcher, exact date, completed deployment or commissioning is established. Parent ecosystem membership does not establish a current active-satellite total.

Evidence basis: Planned configuration

Source / observation date: .

Supporting source ↗
2 planned satellitesNew Oman Lens / STAR.VISION pair

Source announces two new AI remote-sensing satellites. It does not establish launch date or operation. The new pair and prior OL-1 must not be combined into an asserted active…

Planned configuration
Notes & source

Configuration: New Oman Lens / STAR.VISION pair

Source announces two new AI remote-sensing satellites. It does not establish launch date or operation. The new pair and prior OL-1 must not be combined into an asserted active fleet count.

Evidence basis: Planned configuration

Source / observation date: .

Supporting source ↗
XSD-27 through XSD-38First twelve-satellite batchAttributed official published account
Notes & source

Configuration: First twelve-satellite batch

Issuer roster maps these twelve satellites to May 14, 2025 launch.

Evidence basis: Attributed official published account

Source / observation date: .

Supporting source ↗
XSD-39 and XSD-44 through XSD-50Shared Xingsuan group-02 batchAttributed official published account
Notes & source

Configuration: Shared Xingsuan group-02 batch

Issuer roster maps these eight satellites to October 14, 2026. Mingzhu payload hosts share this batch.

Evidence basis: Attributed official published account

Source / observation date: .

Supporting source ↗
Issuer describes Star-Compute as a rolling network supported by frequency and orbital resources for up to 2,800 AI-computing satellitesADA Space Star-Compute network roadmapIssuer reported network plan
Notes & source

Configuration: ADA Space Star-Compute network roadmap

November5 prospectus roadmap and issuer resource claim. The network has no fixed deployment milestone. This is a resource envelope, not launched inventory, operating capacity or independent confirmation of regulatory authorizations.

Evidence basis: Issuer reported network plan

Source / observation date: .

Supporting source ↗
ADA Space reports that the satellites came off the production lineStar-Compute Group 03Issuer newsroom announcement
Notes & source

Configuration: Star-Compute Group 03 production milestone

The announcement dates the production milestone. There is no launch or batch count in the listing.

Evidence basis: Issuer newsroom announcement

Source / observation date: .

Supporting source ↗
7 satellites with terminalsSeven Xingsuan Group 02 laser-terminal spacecraft

Xingyao Guangyu terminals flew on seven of the eight existing Group 02 satellites. These are not additional spacecraft.

Launch and in-orbit telemetry reported by Changzhou Science and Education Town
Notes & source

Configuration: Seven Xingsuan Group 02 laser-terminal spacecraft

Xingyao Guangyu terminals flew on seven of the eight existing Group 02 satellites. These are not additional spacecraft.

Evidence basis: Launch and in-orbit telemetry reported by Changzhou Science and Education Town

Source / observation date: .

Supporting source ↗
1,000 POPS · Arithmetic precision not specifiedFull constellation roadmapPlanned specification
Notes & source

Configuration: Full constellation roadmap

Peta operations per second as stated by the source. Numerical precision and realized utilization are not disclosed; not converted to FLOPS.

Evidence basis: Planned specification

Source / observation date: .

Supporting source ↗
4 more configurations / specifications
5 POPS · Arithmetic precision not specifiedFirst twelve-satellite batch: aggregateLaunched hardware specification
Notes & source

Configuration: Reported aggregate capability of the twelve May 2025 satellites

WIC/CCTV reports 5 POPS. This is an attributed capability rating for launched hardware, not an independent sustained benchmark. Precision is unspecified; an early 4 POPS report differs, so no PFLOPS conversion or reconciliation is assumed.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
Up to 744 TOPS · Arithmetic precision not specifiedHighest-rated member of the first batchLaunched hardware specification
Notes & source

Configuration: Highest stated single-satellite capability in the initial batch

Source states a maximum, not a uniform rating for each of twelve satellites. Precision and independent measured throughput are unspecified; do not multiply by twelve.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
32 PFLOPS · FP8 statedLibra satellite in Xingsuan Group 02Launched hardware specification
Notes & source

Configuration: Libra satellite in Xingsuan Group 02, nominal FP8 rating

ADA Space identified Libra in its November 27 follow-up. The 32 PFLOPS FP8 figure is the satellite’s nominal rating.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
10 POPSIbn Battuta planned satellite

Operator-reported planned capability in the native POPS unit. Arithmetic precision, operation type and sustained performance are unspecified. No FLOPS conversion or measured…

Planned configuration
Notes & source

Configuration: Ibn Battuta planned satellite

Operator-reported planned capability in the native POPS unit. Arithmetic precision, operation type and sustained performance are unspecified. No FLOPS conversion or measured orbital performance is established.

Evidence basis: Planned configuration

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

This is a coverage gap in the inspected published data. It does not prove that no disclosure exists elsewhere.

Suppliers & relationships

8 suppliers / hosts · 13 relationships

Show all 13 relationships & detailsHide relationship details for Three-Body Computing Constellation
  • Partnership

    Work completedReported

    The academy published results from the in-orbit assessment, as cited in ADA Space’s November filing.

    Original disclosure: ADA Space cites the China Academy of Information and Communications Technology’s third-party assessment and publication of results from the second Star-Compute satellite group.

    The filing identifies testing and reporting. It does not disclose contract terms.

    Associated organization: ADA Space (成都国星宇航科技股份有限公司)

    Source ↗
  • Role confirmed

    LaunchedReported

    Changzhou Science and Education Town reported that the seven terminals had unlocked and were sending normal telemetry after launch. Tests of laser links between satellites and to the ground were planned.

    Original disclosure: Xingyao Guangyu supplied the laser communications terminals carried by seven of ADA Space’s eight Xingsuan Group 02 satellites.

    The seven terminals are on satellites in the existing eight-spacecraft Group 02 batch.

    Associated organization: ADA Space (成都国星宇航科技股份有限公司)

    Source ↗
  • Role confirmed · Mission operations · Ground stations & ground segment

    Progress unconfirmed · Disclosure

    Early-orbit tracking, telemetry and control support for the eight Xingsuan group-02 satellites launched October 14, 2026.

    Official report date, not an inferred contract-signing date. Contract buyer, amount and commercial terms are undisclosed. Xi'an Huanyu is not Tianjin Huanyu Xingtong.

    Associated organization: ADA Space (成都国星宇航科技股份有限公司)

    Source ↗
  • Role confirmed · Launch capacity

    Progress unconfirmed · Disclosure

    Landspace’s Zhuque-2E Y4 launched eight ADA Space Xingsuan group-02 satellites on October 14, 2026, including Star Era-44, the Dongfang Tiansuan precursor for the Mingzhu plan.

    Shanghai’s October 16 account identifies six Oriental Tiansuan computing payloads in this shared batch. The launch provider names Star Era-39 and Star Era-44 through 50. The satellites were delivered to orbit for technology validation.

    Associated organization: ADA Space (成都国星宇航科技股份有限公司)

    Source ↗
  • Partnership · Compute & storage

    Progress unconfirmed · Disclosure

    STAR.VISION-announced Marco Polo and Ibn Battuta compute-pair development, including its A1 inference payload and planned model execution, within the Three-Body computing ecosystem.

    The October 9 recap targets Q4 2026 launch. October 8 wording describes on-orbit capabilities, so actual deployment and commissioning are not established. This records a named development contribution, not a procurement order, independently measured capacity or additional active-satellite total. Values and work allocation with Zhejiang Lab remain undisclosed.

    Associated organization: Zhejiang Lab (之江实验室)

    Source ↗
  • Partnership · Processors / accelerators

    Progress unconfirmed · Disclosure

    MetaX GPU chip used in the Yunjian–MetaX satellite intelligent-computing payload for in-orbit reliability testing.

    Joint development and GPU support, with no disclosed buyer, price or procurement contract. CAS Space explicitly connects Jitian A-04 / Yunjian–MetaX to Three-Body (https://www.cas-space.com/article/586.html). MetaX later reports an orbital AI-training verification (https://www.metax-tech.com/ndetail/12654.html); workload, precision and independent performance remain unknown.

    Associated organization: Zhejiang Lab (之江实验室)

    Source ↗
  • Role confirmed · Launch capacity

    Progress unconfirmed · Disclosure

    Delivered Kinetica-1 Y15 launch service for Jitian A-04 / Yunjian–MetaX.

    The source establishes the named technical role. The date is the public report date, not an inferred procurement-signing date. Contracting buyer, instrument, price and exclusivity are not disclosed.

    Associated organization: Zhejiang Lab (之江实验室)

    Source ↗
  • Partnership · Spacecraft & integration

    Progress unconfirmed · Disclosure

    Xuntian Qianhe is a named co-developer of Jitian A-04 / Yunjian–MetaX, a computing spacecraft associated with Three-Body.

    The launch-provider source names joint development without allocating an individual bus, GPU, router or laser package to this participant. Procurement buyer, price and detailed workshare remain unknown.

    Associated organization: Zhejiang Lab (之江实验室)

    Source ↗
  • Partnership · Spacecraft & integration

    Progress unconfirmed · Disclosure

    Zhejiang University City College is a named co-developer of Jitian A-04 / Yunjian–MetaX, a computing spacecraft associated with Three-Body.

    The launch-provider source names joint development without allocating an individual bus, GPU, router or laser package to this participant. Procurement buyer, price and detailed workshare remain unknown.

    Associated organization: Zhejiang Lab (之江实验室)

    Source ↗
  • 云尖信息Research participant

    Partnership · Spacecraft & integration

    Progress unconfirmed · Disclosure

    Yunjian Information is a named co-developer of Jitian A-04 / Yunjian–MetaX, a computing spacecraft associated with Three-Body.

    The launch-provider source names joint development without allocating an individual bus, GPU, router or laser package to this participant. Procurement buyer, price and detailed workshare remain unknown.

    Associated organization: Zhejiang Lab (之江实验室)

    Source ↗
  • Partnership · Satellite bus · Compute & storage

    Progress unconfirmed · Disclosure

    ADA Space developed the intelligent-networked spacecraft platforms and AI payloads for the initial twelve satellites shared with Three-Body/Xingsuan.

    Source-attributed development participation, not a disclosed procurement contract. These are the same first twelve spacecraft in both programs; no extra fleet or specific processor purchase is implied.

    Associated organization: Zhejiang Lab (之江实验室)

    Source ↗
  • Zhejiang Lab (之江实验室)Research participant

    Partnership · Compute & storage · Flight / payload software

    Progress unconfirmed · Disclosure

    Zhejiang Lab developed onboard intelligent computers and associated space-computing software/models carried by the initial twelve satellites.

    Joint technical contribution to the shared first batch. ADA Space is program context, not an established purchasing entity; price, contract and chip model are not disclosed.

    Associated organization: ADA Space (成都国星宇航科技股份有限公司)

    Source ↗
  • Contract / order disclosed · Communications

    Progress unconfirmed

    Onboard routers delivered for ADA Space Xingsuan group-02 satellites, launched October 14, 2026, supporting inter-satellite networking, data forwarding and spacecraft internal synchronization. The supplier describes primary and cold-backup architecture with health management, reconfiguration and radiation-protection measures.

    The supplier explicitly describes contractual technical and delivery milestones. The legal buyer, signing date, award value and router count per satellite are undisclosed. The undated article identifies October 14 as the launch event. In-orbit validation is prospective and no measured throughput or successful network test is reported. Xingsuan satellites overlap the wider Three-Body ecosystem and are not additional spacecraft to be counted again.

    Associated organization: ADA Space (成都国星宇航科技股份有限公司)

Open relationship research →
SpaceX orbital data centersSpaceX · United StatesLatest development 26 Nov 2026 ↗
Manual review 25 Nov 2026

Stage detail: FCC authorization granted. Spacecraft in development.

The FCC sets the first operating deadline for November 2033 and the final deployment deadline for November 2040. It lists the approved orbits and leaves the standard reentry rule in place.

Last full profile review: 14 Oct 2026.

Sources collected: 14 Oct 2026.

Source collection and substantive profile review are separate checks.

Large-scale orbital AI computingDevelopmentFCC authorization granted. Spacecraft in development.
Next project milestone

First Singulus HJT solar-cell production line due in the first half of 2027, followed by targeted Gigasat production as soon as late 2027.

Up to 1,000,000 satellitesStarmind FCC-authorized constellation

Maximum permitted by the FCC. No claim about the number launched or in operation.

Fcc authorization
Notes & source

Configuration: Starmind FCC-authorized constellation

Maximum permitted by the FCC. No claim about the number launched or in operation.

Evidence basis: Fcc authorization

Source / observation date: .

Supporting source ↗
2 more configurations / specifications
First station by Nov. 2033, 10% by Nov. 2035, 50% by Nov. 2038, full constellation by Nov. 2040Starmind FCC-authorized constellationFCC authorization condition
Notes & source

Configuration: Starmind FCC-authorized constellation

All deadlines fall on November 25 of the stated year. They require deployment, placement in the assigned orbits and operation.

Evidence basis: FCC authorization condition

Source / observation date: .

Supporting source ↗
15 yearsStarmind FCC-authorized constellation

The license term begins when SpaceX certifies first compliant operation. It does not specify the life of an individual satellite.

FCC authorization condition
Notes & source

Configuration: Starmind FCC-authorized constellation

The license term begins when SpaceX certifies first compliant operation. It does not specify the life of an individual satellite.

Evidence basis: FCC authorization condition

Source / observation date: .

Supporting source ↗
Optimized NVIDIA Vera Rubin NVL72 rack-scale systemFirst-generation Starmind planned computing hardwareNVIDIA collaboration announcement
Notes & source

Configuration: First-generation Starmind satellite

NVIDIA identifies the planned foundation for first-generation Starmind. Final orbital configuration, quantity and delivered performance remain undisclosed.

Evidence basis: NVIDIA collaboration announcement

Source / observation date: .

Supporting source ↗
Up to 175 kW · Average loadAI1 compute-payload designPlanned specification
Notes & source

Configuration: AI1 compute-payload average electrical design power

Average payload design target. The separate maximum design target is 250 kW. No commissioned capacity is established.

Evidence basis: Planned specification

Source / observation date: .

Supporting source ↗
Up to 250 kW · Peak design loadAI1 proposed compute payloadPlanned specification
Notes & source

Configuration: AI1 compute-payload peak electrical design power

Peak payload design target from the rendered company page, not average or observed flight consumption.

Evidence basis: Planned specification

Source / observation date: .

Supporting source ↗
Suppliers & relationships

1 supplier / host · 2 relationships

  • Contract / order disclosed · Power

    Progress unconfirmed · Disclosure

    Singulus Technologies will deliver a turnkey production line for heterojunction solar cells used by SpaceX Starmind satellites, with the…

  • NVIDIAStrategic partner

    Development agreement · Processors / accelerators · Research & feasibility studies

    Progress unconfirmed · Disclosure

    Joint adaptation of NVIDIA Vera Rubin NVL72 for SpaceXAI's planned first-generation Starmind orbital AI satellite.

Show relationship details & sourcesHide relationship details for SpaceX orbital data centers
  • Contract / order disclosed · Power

    Progress unconfirmed · Disclosure

    Singulus Technologies will deliver a turnkey production line for heterojunction solar cells used by SpaceX Starmind satellites, with the first line due in the first half of 2027 and additional lines planned

    The contract gives SpaceX a defined manufacturing path for the solar cells that will power its planned orbital computing spacecraft

    Buyer: SpaceX

    More than USD 67,284,000 (EUR 60,000,000)

    Source ↗
  • NVIDIAStrategic partner

    Development agreement · Processors / accelerators · Research & feasibility studies

    Progress unconfirmed · Disclosure

    Joint adaptation of NVIDIA Vera Rubin NVL72 for SpaceXAI's planned first-generation Starmind orbital AI satellite.

    NVIDIA's announcement identifies the planned architecture. Orbital deployment, final configuration, quantity and contract value are not established. Terrestrial Grok infrastructure is outside this relationship.

    Associated organization: SpaceX

    Source ↗
Open relationship research →
Hera shared software laboratoryEuropean Space Agency (ESA) · Europe / deep spaceLatest development 25 Nov 2026 ↗
Manual review with evidence gaps 27 Nov 2026

Stage detail: Guest software experiments planned after asteroid investigation

ESA reports that Hera tracked features on Mars for 20 minutes. The planned guest-software tests are separate, and ESA’s published estimates for their duration still differ.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Shared deep-space software experimentationDevelopmentGuest software experiments planned after asteroid investigation
Next project milestone

Validation of guest software before planned experiments in 2027.

One core for spacecraft operations and one protected guest-software environmentHera planned guest-software laboratoryOfficial planned software testbed
Notes & source

Configuration: Hera planned guest-software laboratory

Planned guest allocation on the existing spacecraft. This is not an additional spacecraft or a dedicated orbital data center.

Evidence basis: Official planned software testbed

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
Parallel processor streams for redundancyHera flight avionicsOperator reported flight operation
Notes & source

Configuration: Hera flight avionics

ESA reported two successful restarts to check the two streams after a software upgrade. These are spacecraft operations, separate from the planned guest experiments.

Evidence basis: Operator reported flight operation

Source / observation date: .

Supporting source ↗
Redwire ADPMS-3 computer with a dual-core LEON3 processorHera planned guest-software laboratorySupplier computer identification and esa processor description
Notes & source

Configuration: Hera planned guest-software laboratory

Redwire names the computer. ESA identifies the processor and says one core is reserved for protected guest software.

Evidence basis: Supplier computer identification and esa processor description

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The August software call and November mission timeline do not establish a guest-testbed value for this field.

Suppliers & relationships

2 suppliers / hosts · 2 relationships

  • Contract / order disclosed · Processors / accelerators

    In operationReported

    ESA reported that Hera’s computer restarted successfully after a flight software upgrade in deep space.

  • Contract / order disclosed · Satellite bus

    LaunchedReported

    The Hera spacecraft built by the OHB System-led team launched on October 7, 2024.

Show relationship details & sourcesHide relationship details for Hera shared software laboratory
  • Contract / order disclosed · Processors / accelerators

    In operationReported

    ESA reported that Hera’s computer restarted successfully after a flight software upgrade in deep space.

    Original disclosure: Built the ADPMS-3 onboard computer for Hera under contract with the mission’s main contractor, OHB System AG.

    Original announcement ↗

    The contract covers the spacecraft computer. The guest software experiments are planned separately.

    Buyer: OHB System AG

    Source ↗
  • Contract / order disclosed · Satellite bus

    LaunchedReported

    The Hera spacecraft built by the OHB System-led team launched on October 7, 2024.

    Original disclosure: Led the design, construction, and integration of Hera, the spacecraft that will host ESA’s guest software experiments.

    Original announcement ↗

    The price covers the original spacecraft mission contract. ESA did not announce a separate price for the later software lab.

    Buyer: European Space Agency (ESA)

    USD 153,882,480 (EUR 129,400,000) · Original Hera mission design, manufacturing, and testing contract.

    Source ↗
Open relationship research →
Stardubhe orbital computing for autonomous systemsStardubhe · ChinaLatest development 25 Nov 2026 ↗
Manual review 26 Nov 2026

Stage detail: Ground-to-orbit computing test reported

Stardubhe tested sending ground data to a satellite for AI processing and receiving the results. The district report describes the route and the tasks tested.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Orbital inference services for autonomous systemsDemonstratedGround-to-orbit computing test reported
Next project milestone

Test the service with vehicles and other equipment that work beyond mobile network coverage.

Shared space-to-ground AI computing serviceDetailed configuration not available in reviewed material.
CPU, GPU, FPGA, DSP and NPU heterogeneous computingStardubhe service architectureDesign description
Notes & source

Configuration: Stardubhe service architecture

Architecture description, without selected models or installed counts.

Evidence basis: Design description

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
Shared resources and cross-checks to detect and isolate faultsStardubhe service architectureDesign description
Notes & source

Configuration: Stardubhe service architecture

Design approach, without a measured fault rate.

Evidence basis: Design description

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

No numerical mission-specific specification established in reviewed official material.

Suppliers & relationships

4 relationships

Show all 4 relationships & detailsHide relationship details for Stardubhe orbital computing for autonomous systemsOpen relationship research →
Xingyun Constellation PlanAerospace Information Research Institute, Chinese Academy of Sciences · ChinaLatest development 25 Nov 2026 ↗
Manual review 27 Nov 2026

Stage detail: Network plan announced

The network operator outlined the planned satellite-to-ground computing link. Geovis and Shuguang Zhisuan were selected to develop the pilot.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Coordinate shared space and ground computing servicesDevelopmentNetwork plan announced
Next project milestone

Disclose engineering configuration and deployment schedule.

Combine remote-sensing, communications and computing satellites into a shared service networkXingyun planned shared networkPlanned architecture
Notes & source

Configuration: Xingyun planned shared network

Planned architecture. The source’s broader thousand-satellite ecosystem wording is not an established count for this plan.

Evidence basis: Planned architecture

Source / observation date: .

Supporting source ↗
Planned domestic computing chips, complete servers, satellite manufacturing and applicationsXingyun planned shared networkPlanned architecture
Notes & source

Configuration: Xingyun planned shared network

No selected processor model, supplier allocation or installed configuration is specified.

Evidence basis: Planned architecture

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
Three planned classes: remote-sensing satellites with high-performance edge computing, general-purpose computing satellites, and supercomputing satellitesXingyun planned shared networkPlanned architecture
Notes & source

Configuration: Xingyun planned shared network

Planned categories, without selected processor models, installed counts, arithmetic benchmarks or deployment dates. These classes are not an operating fleet.

Evidence basis: Planned architecture

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

No configuration-specific IT electrical demand is established in the inspected official sources.

Suppliers & relationships

3 relationships

Show all 3 relationships & detailsHide relationship details for Xingyun Constellation PlanOpen relationship research →
SpaceComputer Space FabricSpaceComputer · InternationalLatest development 24 Nov 2026 ↗
Manual review with evidence gaps 27 Nov 2026

Stage detail: Three missions planned for 2027

Orbitport ran during reported satellite passes. Space Fabric’s three flight tests remain planned. SpaceComputer’s sources give different quarters for its Spacemanic flight.

Last full profile review: 20 Oct 2026.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Confidential satellite computing and secure communicationsDevelopmentThree missions planned for 2027
Next project milestone

Fly the first Space Fabric demonstration mission, targeted for early 2027.

Spacemanic sovereign CubeSat payload targeting Q4 2027Space Fabric planned Spacemanic LEO payloadUnresolved conflict / configuration · Planned mission description
Notes & source

Configuration: Space Fabric planned Spacemanic LEO payload

The undated mission page states Q4 2027. The July 22 operator announcement stated Q3 2027. Preserve this attributed discrepancy and keep the LEO payload separate from the early-2027 LEO-to-GEO mission.

Evidence basis: Unresolved conflict / configuration · Planned mission description

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
Shared D-Orbit spacecraft demonstration planned for 2027Space Fabric D-Orbit/Aptos LEO demonstrationOfficial planned mission integration
Notes & source

Configuration: Planned D-Orbit/Aptos LEO demonstration

Developer identifies its second planned 2027 flight and first LEO-focused demonstration. No launch day or exact D-Orbit spacecraft is specified.

Evidence basis: Official planned mission integration

Source / observation date: .

Supporting source ↗
2 secure elementsSpace Fabric architecture, flight mapping unconfirmedPlanned specification
Notes & source

Configuration: Two independent secure elements in described Space Fabric architecture

TROPIC01 and NXP SE050 design components. Not flight validation or processor throughput.

Evidence basis: Planned specification

Source / observation date: .

Supporting source ↗
5 more configurations / specifications
USB Armory Mk II with NXP i.MX6UL ARM Cortex-A7 and ARM TrustZone, connected by USB to a Raspberry Pi 5 relay with TPM 2.0Space Fabric architecture, flight mapping unconfirmedOfficial implementation description
Notes & source

Configuration: Space Fabric architecture, flight mapping unconfirmed

Published implementation, with no flight configuration yet identified. The relay sits outside the critical trust path.

Evidence basis: Official implementation description

Source / observation date: .

Supporting source ↗
Two USB Armory Mk II units and two independent carrier boardsSpace Fabric design and ground implementationDesign / ground implementation
Notes & source

Configuration: spacefabric-design

Radiation-resilience architecture described in section 7.8. Not an installed flight inventory.

Evidence basis: Design / ground implementation

Source / observation date: .

Supporting source ↗
Space Fabric compute hardware and OS connected to Aptos Orbital cEDGESpace Fabric D-Orbit/Aptos LEO demonstrationOfficial planned mission integration
Notes & source

Configuration: Planned D-Orbit/Aptos LEO demonstration

cEDGE is a communications proxy to Iridium, while Space Fabric uses its own compute hardware. No processor, memory capacity or installed board count is disclosed for this configuration.

Evidence basis: Official planned mission integration

Source / observation date: .

Supporting source ↗
RISC-V-based TROPIC01 secure element paired with NXP SE050Space Fabric network architectureOfficial hardware integration design
Notes & source

Configuration: Space Fabric network architecture

The RISC-V core belongs to a security element, not the application's compute CPU. Integration and testing are reported for upcoming payloads, without a mission-specific installed inventory.

Evidence basis: Official hardware integration design

Source / observation date: .

Supporting source ↗
Google Cloud Confidential VMs using Intel TDXOrbitport ground gatewayProvider reported ground operation
Notes & source

Configuration: Orbitport ground gateway

The report identifies the hardware feature. It does not name the CPU model or install this equipment aboard a spacecraft.

Evidence basis: Provider reported ground operation

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

November 9 comparison of the operator recap, hardware article, technical paper and supplier account found no mission-specific value for this field.

Suppliers & relationships

7 suppliers / hosts · 9 relationships

  • Role confirmed · Cloud capacity & advisory

    In operationReported

    Google Cloud infrastructure ran the Orbitport ground gateway during the satellite passes described in the November case study.

  • InfineonStrategic partner

    Partnership · Avionics / integrated electronics

    Progress unconfirmed · Disclosure

    Security hardware enabling one planned Space Fabric mission.

Show all 9 relationships & detailsHide relationship details for SpaceComputer Space Fabric
  • Role confirmed · Cloud capacity & advisory

    In operationReported

    Google Cloud infrastructure ran the Orbitport ground gateway during the satellite passes described in the November case study.

    Original disclosure: Google Cloud provides the infrastructure for SpaceComputer’s Orbitport ground gateway. SpaceComputer runs the gateway on Google Kubernetes Engine and Confidential VMs to connect software on Earth to spacecraft.

    The service runs on Earth. The case study does not name a spacecraft using it.

    Associated organization: SpaceComputer

    Source ↗
  • Partnership · Communications

    PlannedReported

    Aptos cEDGE and its ground gateway are planned communications components of the 2027 D-Orbit LEO demonstration.

    Original disclosure: cEDGE communications proxy to Iridium and cEDGE Gateway ground command-and-control service for SpaceComputer's planned D-Orbit LEO demonstration.

    Space Fabric uses its own compute hardware. Routing other satellites' workloads and broader shared access are planned validation steps.

    Associated organization: SpaceComputer

    Source ↗
  • Partnership · Compute & storage

    PlannedReported

    D-Orbit is named as the planned rideshare host for the 2027 LEO demonstration.

    Original disclosure: D-Orbit rideshare spacecraft hosting a planned 2027 Space Fabric confidential-computing demonstration with Aptos Orbital connectivity.

    The developer identifies D-Orbit as host but supplies no spacecraft name, launch day or procurement value. The LEO mission is separate from its LEO-to-GEO and Spacemanic roadmap entries.

    Associated organization: SpaceComputer

    Source ↗
  • Role confirmed · Communications

    PlannedReported

    Iridium relay through Aptos cEDGE is planned for the 2027 LEO demonstration.

    Original disclosure: Iridium satellite connectivity used through Aptos Orbital's cEDGE proxy for the planned Space Fabric LEO demonstration.

    Named network role through cEDGE, without a separately announced direct SpaceComputer–Iridium procurement order, price or measured availability.

    Associated organization: SpaceComputer

    Source ↗
  • InfineonStrategic partner

    Partnership · Avionics / integrated electronics

    Progress unconfirmed · Disclosure

    Security hardware enabling one planned Space Fabric mission.

    Development role disclosed. Launch, delivery and paid purchase terms are not established.

    Associated organization: SpaceComputer

    Source ↗
  • SpacemanicStrategic partner

    Partnership · Launch integration

    Progress unconfirmed · Disclosure

    SpaceComputer names Spacemanic as a planned mission partner. Its July 22 roadmap targeted Q3 2027, while the undated operator mission page states Q4 2027 for a sovereign LEO CubeSat payload. This remains a mission partnership without a disclosed binding launch purchase.

    Development role disclosed. Launch, delivery and paid purchase terms are not established.

    Associated organization: SpaceComputer

    Source ↗
  • Role confirmed · Processors / accelerators

    Progress unconfirmed · Disclosure

    NXP SE050 security chip and i.MX6UL Cortex-A7 processor in Space Fabric’s published design.

    The March 24 paper identifies the i.MX6UL inside USB Armory Mk II. The July 7 Tropic Square account identifies SE050. These are component roles, with no direct NXP purchase order or flight result disclosed. Paper: https://arxiv.org/html/2603.23745v1

    Associated organization: SpaceComputer

    Source ↗
  • Partnership · Processors / accelerators

    In developmentReported

    SpaceComputer reports actively integrating and testing TROPIC01 in Space Fabric payloads for upcoming missions. The stated internal temperature range is a design target.

    Original disclosure: TROPIC01 secure-element integration into Space Fabric architecture.

    Original announcement ↗

    Named technology integration, not a disclosed priced purchase or completed orbital test.

    Associated organization: SpaceComputer

    Source ↗
  • Role confirmed · Compute & storage

    Progress unconfirmed

    Raspberry Pi 5 is the host relay in the published Space Fabric implementation.

    The paper and May 27 operator hardware article identify the Raspberry Pi 5 relay. This records a component role, not a direct supply agreement or completed flight. Operator article: https://blog.spacecomputer.io/satellite-hardware-components/

    Associated organization: SpaceComputer

Open relationship research →
Zhongke Xingsi orbital computing networkZhongke Xingsi · ChinaLatest development 24 Nov 2026 ↗
Manual review 25 Nov 2026

Stage detail: Orbital payload test planned

The plan starts with an orbital test of a computing payload. Later phases would connect groups of satellites.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Connect computing and storage on satellites with ground systemsProposal / studyOrbital payload test planned
Next project milestone

Test a computing payload in orbit.

Shared orbital computing network proposalDetailed configuration not available in reviewed material.
Computing payload for an initial orbital testPlanned Zhongke Xingsi networkCompany plans reported by its partner
Notes & source

Configuration: Planned Zhongke Xingsi network

The company plans to test a computing payload before attempting satellite clusters.

Evidence basis: Company plans reported by its partner

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

No supported project-specific value is recorded in the current catalog. This does not establish zero or the absence of disclosure elsewhere.

Suppliers & relationships

1 relationship

Show relationship details & sourcesHide relationship details for Zhongke Xingsi orbital computing networkOpen relationship research →
KunlunMeta Yuanjing Constellation (昆仑元境星座)KunlunMeta · ChinaLatest development 20 Nov 2026 ↗
Manual review 27 Nov 2026

Stage detail: Three validation nodes demonstrated

KunlunMeta says one early satellite tested a model with 120 billion parameters in orbit. The company names three framework partners and plans 11 launches through 2028.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Shared orbital infrastructure for hosted AI models, data processing and task deliveryDemonstratedThree validation nodes demonstrated
Next project milestone

Fly selected payloads on L-05 and expand the constellation toward 80 satellites by the end of 2028.

3 satellitesEarly validation nodes

KunlunMeta reports three early nodes launched by October 2026. The source does not identify the spacecraft or launch dates.

Company-reported status in a provincial industry notice
Notes & source

Configuration: Early Yuanjing validation deployment

KunlunMeta reports three early nodes launched by October 2026. The source does not identify the spacecraft or launch dates.

Evidence basis: Company-reported status in a provincial industry notice

Source / observation date: .

Supporting source ↗
2 more configurations / specifications
80 satellitesEnd-2028 plan

Current company roadmap target for cumulative deployment by the end of 2028.

Official study estimate · Company roadmap
Notes & source

Configuration: Planned Yuanjing constellation

Current company roadmap target for cumulative deployment by the end of 2028.

Evidence basis: Official study estimate · Company roadmap

Source / observation date: .

Supporting source ↗
11 planned launchesEnd-2028 plan

Flights are planned from December 2026 through December 2028. The company targets a total of 80 satellites by the end of that period.

Company plan
Notes & source

Configuration: End-2028 plan

Flights are planned from December 2026 through December 2028. The company targets a total of 80 satellites by the end of that period.

Evidence basis: Company plan

Source / observation date: .

Supporting source ↗
GPT-Station Asterism onboard computing platformEnd-2028 planCompany plan
Notes & source

Configuration: End-2028 plan

KunlunMeta proposes this platform for the network. It does not identify the installed processors or memory of the early nodes.

Evidence basis: Company plan

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

No satellite IT electrical load is disclosed.

Suppliers & relationships

3 relationships

Show all 3 relationships & detailsHide relationship details for KunlunMeta Yuanjing Constellation (昆仑元境星座)Open relationship research →
Project SuncatcherGoogle / Planet · United StatesLatest development 19 Nov 2026 ↗
Manual review 25 Nov 2026

Stage detail: Operator-reported onboard AI inference

Google reported memory errors in a ground radiation test while other tests continued at higher doses. The satellite answered a prompt from orbit in October. Its sustained power and cooling performance are still unknown.

Last full profile review: 20 Oct 2026.

Sources collected: 20 Oct 2026.

Source collection and substantive profile review are separate checks.

TPU hardware and optical interconnect validationDemonstratedOperator-reported onboard AI inference
Next project milestone

Continue prototype thermal and radiation tests and the separate two-satellite experiment planned for 2027, ahead of a dedicated New Glenn launch targeted for Q1 2029.

2 satellitesSeparate planned 2027 two-satellite interconnect testPlanned specification · 2027
Notes & source

Configuration: Interconnect experiment

Separate from the initial Transporter-18 TPU hardware-survival test.

Evidence basis: Planned specification · 2027

Source / observation date: .

Supporting source ↗
2 more configurations / specifications
1 prototype satellite2026 TPU survival-test prototype

One prototype launched October 1, 2026. Google's October30 report establishes an operator-reported onboard Gemma4 workload response, not a commercial fleet or measured throughput.

Official operator launch account
Notes & source

Configuration: 2026 TPU survival-test prototype

One prototype launched October 1, 2026. Google's October30 report establishes an operator-reported onboard Gemma4 workload response, not a commercial fleet or measured throughput.

Evidence basis: Official operator launch account

Source / observation date: .

Supporting source ↗
81 satellitesSuncatcher illustrative formation study

One possible formation used to test orbital dynamics. This is not the expected fleet size.

Official study estimate · Illustrative simulation
Notes & source

Configuration: Suncatcher illustrative formation study

One possible formation used to test orbital dynamics. This is not the expected fleet size.

Evidence basis: Official study estimate · Illustrative simulation

Source / observation date: .

Supporting source ↗
Roughly one data-center rack’s computing capacity per satellitePlanned 2029 heavy-lift missionOfficial announced mission design
Notes & source

Configuration: Suncatcher dedicated heavy-lift mission targeted for Q1 2029

Qualitative mission-design comparison. TPU count, model, arithmetic throughput and precision are not specified. Not assigned to the 2026 prototype or 2027 twin-satellite experiment.

Evidence basis: Official announced mission design

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The September 24 and October 1 Google accounts do not disclose project-specific IT electrical power.

Suppliers & relationships

3 suppliers / hosts · 4 relationships

  • Contract / order disclosed · Launch

    PlannedReported

    A dedicated New Glenn launch is targeted for Q1 2029 to deploy Suncatcher computing satellites into sun-synchronous orbit.

  • Partnership

    Progress unconfirmed · Disclosure

    Crocker Nuclear Laboratory proton-beam facility used for Google TPU ground radiation testing while AI workloads ran

Show all 4 relationships & detailsHide relationship details for Project Suncatcher
  • Contract / order disclosed · Launch

    PlannedReported

    A dedicated New Glenn launch is targeted for Q1 2029 to deploy Suncatcher computing satellites into sun-synchronous orbit.

    Original disclosure: New Glenn launch service for Google's first dedicated heavy-lift Suncatcher mission, targeted for Q1 2029.

    The dedicated 2029 launch is separate from the first prototype and 2027 interconnect experiment. Price and spacecraft count are undisclosed.

    Buyer: Google

    Source ↗
  • SpaceXSupplierLaunch

    Role confirmed · Launch

    Progress unconfirmed · Disclosure

    Launch service for the first Project Suncatcher prototype satellite on the Transporter-18 rideshare mission.

    Google confirmed the prototype’s Transporter-18 launch on October 1, 2026.

    Associated organization: Google

    Source ↗
  • Partnership

    Progress unconfirmed · Disclosure

    Crocker Nuclear Laboratory proton-beam facility used for Google TPU ground radiation testing while AI workloads ran

    Ground tests exposed the TPUs to a proton beam while they ran AI workloads.

    Associated organization: Google

    Source ↗
  • Partnership · Satellite bus · Mission operations

    Progress unconfirmed · Disclosure

    Planet is to build and operate spacecraft for Google’s Suncatcher research program.

    Planet develops and operates the spacecraft for the research collaboration.

    Associated organization: Google

    Source ↗
Open relationship research →
EDGX STERNA orbital-computing demonstrationsEDGX · EuropeLatest development 18 Nov 2026 ↗
Manual review with evidence gaps 26 Nov 2026

Stage detail: Customer AI models demonstrated in orbit

Early Bird flew on Clustergate-2. Leaving the Nest was one of five payloads on SpaceLocker’s satellite. The published GPU ratings do not use confirmed matching test settings.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Onboard AI and third-party software hostingDemonstratedCustomer AI models demonstrated in orbit
Next project milestone

Out of Tern is planned for February 2027 on Gracious Gloria, followed by Wingman on D-Orbit ION in October 2027.

D-Orbit booked to launch and host Sterna on ION Gracious GloriaOut of TernOfficial configuration or mission report
Notes & source

Configuration: Out of Tern

EDGX lists Gracious Gloria for the planned February 2027 flight. The booking covers integration and operating the payload.

Evidence basis: Official configuration or mission report

Source / observation date: .

Supporting source ↗
4 more configurations / specifications
Launched on Clustergate-2Early Bird Sterna payloadProject specification
Notes & source

Configuration: Early Bird Sterna payload

EDGX lists the host and the March 2026 Transporter-16 launch. The initial EDGX AI results remain recorded against the March demonstrations.

Evidence basis: Project specification

Source / observation date: .

Supporting source ↗
Launched on Out-of-the-BoxLeaving the Nest Sterna payloadProject specification
Notes & source

Configuration: Leaving the Nest Sterna payload

EDGX lists the host as Out-of-the-Box on the same March 2026 launch as Early Bird.

Evidence basis: Project specification

Source / observation date: .

Supporting source ↗
5 hosted payloadsSpaceLocker Out-of-the-Box host

Five payloads flew on the shared Out-of-the-Box satellite. EDGX identifies Sterna as one of them.

Official launch integration release
Notes & source

Configuration: SpaceLocker Out-of-the-Box host

Five payloads flew on the shared Out-of-the-Box satellite. EDGX identifies Sterna as one of them.

Evidence basis: Official launch integration release

Source / observation date: .

Supporting source ↗
Two March 2026 hosted demonstrationsMarch 2026 STERNA demonstrationsRecorded description · Existing catalog prose, not a new measurement
Notes & source

Configuration: March 2026 STERNA demonstrations

One payload returned operational data within two weeks. The second still awaits satellite commissioning. Later 2027 bookings are separate.

Evidence basis: Recorded description · Existing catalog prose, not a new measurement

Source / observation date: .

Supporting source ↗
STERNA with NVIDIA Jetson Orin NX in Super ModeOut of Tern planned for February 2027Project specification
Notes & source

Configuration: Out of Tern planned for February 2027

The operator explicitly maps this hardware and mode to the booked Gracious Gloria demonstration. It does not establish the March 2026 payload mode, numerical performance or sustained flight power. The October28 release describes over50percent more AI performance in Super Mode. Relative design claim only, with workload and arithmetic format unspecified.

Evidence basis: Project specification

Source / observation date: .

Supporting source ↗
3 more configurations / specifications
Hyperspectral camera, STERNA, Morus based on NVIDIA Jetson Thor, and relay linkWingman planned for October 2027Project specification
Notes & source

Configuration: Wingman planned for October 2027

The booked D-Orbit ION mission is described as the first complete EDGX payload and first Morus flight. Component models, count, workload throughput and mission power are not disclosed here. Product-wide Morus ratings are not assigned to this mission. The October 28 release identifies Morus as based on Jetson Thor. This is planned hardware, not flown performance.

Evidence basis: Project specification

Source / observation date: .

Supporting source ↗
EDGX Sterna with NVIDIA Jetson Orin NX on Clustergate-2Early BirdOfficial configuration or mission report
Notes & source

Configuration: Early Bird

DPhi Space identifies the flown GPU model in its platform specifications. EDGX names this flight Early Bird.

Evidence basis: Official configuration or mission report

Source / observation date: .

Supporting source ↗
Sterna computer with NVIDIA Jetson on Out-of-the-BoxLeaving the NestOfficial configuration or mission report
Notes & source

Configuration: Leaving the Nest

EDGX identifies the second payload and its host. The exact installed Jetson version, RAM and storage are not identified for this flight.

Evidence basis: Official configuration or mission report

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

EDGX states 10 to 45 watts for the Sterna product. No measured flight demand or exact mission power setting is published.

Suppliers & relationships

8 suppliers / hosts · 10 relationships

  • Capacity reserved · Payload integration

    Progress unconfirmed · Disclosure

    D-Orbit ION launch, integration, hosting and in-orbit operations for Out of Tern in February 2027 and Wingman in October 2027

  • VITOResearch participant

    Preliminary agreement · Flight / payload software

    In developmentReported

    The partners signed a memorandum to prepare onboard image processing and AI compression for a future optical mission.

Show all 10 relationships & detailsHide relationship details for EDGX STERNA orbital-computing demonstrations
  • VITOResearch participant

    Preliminary agreement · Flight / payload software

    In developmentReported

    The partners signed a memorandum to prepare onboard image processing and AI compression for a future optical mission.

    Original disclosure: VITO will provide onboard image processing, AI compression, a use case and optical-instrument commissioning support. EDGX will provide onboard computing, integration and project coordination.

    The memorandum covers an unnamed upcoming optical mission. The previously reported CORSA orbital run is distinct from this planned work.

    Associated organization: EDGX

    Source ↗
  • Capacity reserved · Payload integration

    Progress unconfirmed · Disclosure

    D-Orbit ION launch, integration, hosting and in-orbit operations for Out of Tern in February 2027 and Wingman in October 2027

    Two booked future hosted-payload missions. This updates the existing Wingman booking record to include the jointly announced Out of Tern mission. Launch and flight results remain future events.

    Associated organization: EDGX

    Source ↗
  • Role confirmed · Processors / accelerators

    Progress unconfirmed · Disclosure

    NVIDIA Jetson technology used for STERNA. Separate planned 2027 systems identify Orin NX Super Mode and Morus based on Jetson Thor.

    Manufacturer technology role. No purchase order, quantity, exclusivity, contract value or achieved AI benchmark is disclosed.

    Associated organization: EDGX

    Source ↗
  • Role confirmed · Payload integration

    Progress unconfirmed · Disclosure

    Shock testing of the Sterna satellite computer at the V2i laboratory in Liege, with three shocks in each of three directions and functional checks.

    V2i provides the external shock-test facility used in the Sterna launch-test campaign.

    Associated organization: EDGX

    Source ↗
  • EDGXCategory not recorded
    Supplier

    Role confirmed

    DemonstratedReported

    DPhi Space reported that Clustergate-2 generated an image caption while being commissioned.

    Original disclosure: EDGX provided a Sterna computer with an NVIDIA GPU for Clustergate-2. EDGX calls this flight Early Bird.

    Associated organization: DPhi Space

    Source ↗
    Research participant

    Development agreement

    Progress unconfirmed · Disclosure

    ARTES-supported STERNA definition, technology development and in-orbit demonstration.

    Disclosed phase budgets do not establish ESA contribution amounts.

    Associated organization: European Space Agency (ESA)

    Source ↗
  • SpaceXSupplierLaunch

    Role confirmed · Launch capacity

    Progress unconfirmed · Disclosure

    Transporter-16 launch carrying the March 2026 STERNA demonstration payloads.

    Launch role is established. Direct contracting party and price are not disclosed. The ESA source establishes launch participation but does not disclose an EDGX launch contract or order. This record is excluded from contract-record totals.

    Associated organization: EDGX

    Source ↗
  • Role confirmed · Launch integration

    Progress unconfirmed · Disclosure

    ISISPACE coordinated with RIDE! Space on the separation system and payload integration in Toulouse for SpaceLocker’s Out-of-the-Box satellite.

    Associated organization: SpaceLocker

    Source ↗
  • Role confirmed · Launch integration

    Progress unconfirmed · Disclosure

    RIDE! Space managed the launch campaign and interfaces for SpaceLocker’s 16U satellite, which carried EDGX’s Sterna.

    Associated organization: SpaceLocker

    Source ↗
  • SpaceLockerHostCategory not recorded

    Partnership

    Progress unconfirmed

    SpaceLocker’s Out-of-the-Box satellite hosted EDGX’s Leaving the Nest Sterna payload on Transporter-16.

    Associated organization: EDGX

Open relationship research →
Kepler Tranche 1Kepler Communications · CanadaLatest development 18 Nov 2026 ↗
Manual review 26 Nov 2026

Stage detail: Commercial services operating

Kepler reports commercial relay and computing service. Sophia Space used several satellites to test how its software coordinates work and handles failures.

Last full profile review: 15 Oct 2026.

Sources collected: 23 Oct 2026.

Source collection and substantive profile review are separate checks.

Optical relay, distributed compute and hosted nodesOperatingCommercial services operating
Next project milestone

Expand customer use of the operating relay and computing network.

10 satellitesFirst tranche: aggregate across ten satellitesLaunched hardware specification
Notes & source

Configuration: First Kepler optical-relay tranche

Counts spacecraft, including those carrying hosted services. Do not add Axiom node counts to this asset total.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
Single-node and clustered distributed workloads, with reassignment when a node is unavailableFirst tranche: ten-satellite compute networkOfficial attributed description
Notes & source

Configuration: First tranche: ten-satellite compute network

Described in Kepler’s March 16, 2026 commissioning announcement.

Evidence basis: Official attributed description

Source / observation date: .

Supporting source ↗
40 Jetson Orin modulesFirst tranche: aggregate across ten satellitesReported demonstration
Notes & source

Configuration: Distributed computing across ten Tranche 1 satellites

Commissioned hardware modules, not forty satellites or measured throughput. No conversion to FLOPS or IT power.

Evidence basis: Reported demonstration

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

Launch, commissioning and commercial-service accounts reviewed November 7 do not provide a configuration-specific numerical specification for this field.

Suppliers & relationships

3 suppliers / hosts · 3 relationships

  • Partnership · Processors / accelerators

    Progress unconfirmed · Disclosure

    NVIDIA Jetson Orin compute modules powering distributed edge-compute nodes across Kepler Tranche 1.

  • SpaceXSupplierLaunch

    Role confirmed · Launch capacity

    Progress unconfirmed · Disclosure

    Falcon 9 launch service used for the ten Tranche 1 satellites.

Show all 3 relationships & detailsHide relationship details for Kepler Tranche 1
  • Partnership · Processors / accelerators

    Progress unconfirmed · Disclosure

    NVIDIA Jetson Orin compute modules powering distributed edge-compute nodes across Kepler Tranche 1.

    Kepler reports forty deployed modules across ten first-tranche satellites.

    Associated organization: Kepler Communications

    Source ↗
  • SpaceXSupplierLaunch

    Role confirmed · Launch capacity

    Progress unconfirmed · Disclosure

    Falcon 9 launch service used for the ten Tranche 1 satellites.

    Launch completed on January 11, 2026.

    Associated organization: Kepler Communications

    Source ↗
  • Role confirmed · Optical links

    Progress unconfirmed · Disclosure

    ConLCT80 optical terminals selected for Kepler’s first planned optical-relay tranche.

    Historical terminal selection announced in June 2022.

    Buyer: Kepler Communications

    Source ↗
Open relationship research →
Sophia Orbital Operating System (SOOS)Sophia Space · GlobalLatest development 18 Nov 2026 ↗
Manual review 26 Nov 2026

Stage detail: Distributed software functions demonstrated in orbit

Sophia ran its software across multiple Kepler satellites. Kepler identifies the host processor family as NVIDIA Jetson Orin. PiLogic’s separate ground test is planned.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Manage and orchestrate computing workloads across shared orbital infrastructureDemonstratedDistributed software functions demonstrated in orbit
Next project milestone

Partner application deployments and further testing of distributed workloads.

Distributed operating-system functions across multiple Kepler Tranche 1 satellitesSOOS on Kepler spacecraftOfficial operator software deployment account
Notes & source

Configuration: SOOS on Kepler spacecraft

Operator-reported software demonstration. Exact spacecraft identities and deployment dates are not given. These are hosted software nodes on existing spacecraft.

Evidence basis: Official operator software deployment account

Source / observation date: .

Supporting source ↗
NVIDIA Jetson Orin on the participating Kepler Tranche 1 spacecraftSOOS on Kepler spacecraftKepler host specification and Sophia demonstration report
Notes & source

Configuration: SOOS on Kepler spacecraft

Sophia reported using multiple GPUs on participating satellites. Kepler confirms 40 Orin modules across the ten-satellite host fleet. The reports do not name the Orin variant or the number of modules used in the SOOS test.

Evidence basis: Kepler host specification and Sophia demonstration report

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The November 18 deployment release and FAQ do not establish a deployment-specific numerical value for this field.

Suppliers & relationships

3 suppliers / hosts · 4 relationships

  • PiLogic, Inc.SupplierCategory not recorded

    Contract / order disclosed

    PlannedReported

    PiLogic will demonstrate its software on Sophia Space’s ground test platform and use the results to inform later flight work.

  • SPACEWERXProgramme funding contributor

    Contract awarded

    Progress unconfirmed · Disclosure

    A separate SpaceWERX award supports work on Sophia Space’s ground test platform and preparation for flight testing.

Show all 4 relationships & detailsHide relationship details for Sophia Orbital Operating System (SOOS)
  • PiLogic, Inc.SupplierCategory not recorded

    Contract / order disclosed

    PlannedReported

    PiLogic will demonstrate its software on Sophia Space’s ground test platform and use the results to inform later flight work.

    Original disclosure: PiLogic will analyze mission needs and demonstrate software on Sophia Space’s ground test platform.

    Associated organization: Sophia Space

    Source ↗
  • SPACEWERXProgramme funding contributor

    Contract awarded

    Progress unconfirmed · Disclosure

    A separate SpaceWERX award supports work on Sophia Space’s ground test platform and preparation for flight testing.

    Associated organization: Sophia Space

    Source ↗
  • Development agreement · Communications · Flight / payload software · Data services

    DemonstratedReported

    Sophia reports distributed operating-system functions across multiple Kepler Tranche 1 satellites and multiple GPUs on each spacecraft.

    Original disclosure: Commercial collaboration combining Sophia's distributed orbital-compute software with Kepler's hosted compute and optical/RF relay network.

    Original announcement ↗

    The April agreement planned demonstrations from Q4 2026. Sophia's November 18 release reports distributed operating-system functions across Kepler Tranche 1 spacecraft and GPUs. Exact spacecraft identities, hardware allocation and deployment dates are undisclosed.

    Associated organization: Sophia Space

    Source ↗
  • Partnership · Processors / accelerators

    Progress unconfirmed · Disclosure

    NVIDIA Jetson Orin compute platform used in Sophia Space hosted orbital-computing infrastructure.

    Technology-use relationship disclosed by NVIDIA and quoted by Sophia; purchase terms, order volume and mission assignment are not disclosed. Excluded from contract-award counts.

    Associated organization: Sophia Space

    Source ↗
Open relationship research →
ATHENE-1 / SeRANIS orbital research platformUniversität der Bundeswehr München / LuxSpace · Europe · GermanyLatest development 17 Nov 2026 ↗
Manual review 27 Nov 2026

Stage detail: Launched research platform, experiments planned

LuxSpace identifies two flight computers and describes the ground thermal tests. The mission team confirmed first contact. Results from the individual experiments have not been reported.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Shared orbital research platformLaunchedLaunched research platform, experiments planned
Next project milestone

Read a dated mission-specific result or revised flight-test milestone when available.

15 payloads supporting 22 scientific experimentsATHENE-1 flight platformOfficial project-specific source
Notes & source

Configuration: ATHENE-1 launched research platform

One shared research satellite. Experiments and payloads are not additional satellites.

Evidence basis: Official project-specific source

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
More than 30 individual payload unitsATHENE-1 flight platformLuxSpace project presentation at ESA
Notes & source

Configuration: ATHENE-1 flight platform

LuxSpace counts individual units, while the university release reports 15 payloads for 22 experiments. These different counts are not added.

Evidence basis: LuxSpace project presentation at ESA

Source / observation date: .

Supporting source ↗
LuxSpace Triton-X Heavy with UniBw multifunctional experimental payloadATHENE-1 flight platformOfficial project-specific source
Notes & source

Configuration: ATHENE-1 launched research platform

Specific flown bus identified by October 2026 operator/provider sources. No exact AI-OBC processor model is supplied.

Evidence basis: Official project-specific source

Source / observation date: .

Supporting source ↗
2 more configurations / specifications
Dedicated AI-OBC for demanding AI/non-AI tasks, separate communication DSPs and a payload-control subsystem for simple processingATHENE mission designOfficial project-specific source
Notes & source

Configuration: ATHENE mission design

Prelaunch mission architecture. AI-OBC model/count and installed RAM/storage remain unknown. Do not assume all tasks run on one identical processor.

Evidence basis: Official project-specific source

Source / observation date: .

Supporting source ↗
2 integrated avionics computersATHENE-1 flight platform

LuxSpace identifies two installed Integrated Avionic Units. The report does not identify either unit as the separate AI computer.

LuxSpace project presentation at ESA
Notes & source

Configuration: ATHENE-1 flight platform

LuxSpace identifies two installed Integrated Avionic Units. The report does not identify either unit as the separate AI computer.

Evidence basis: LuxSpace project presentation at ESA

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

No current numerical project-specific specification established in the reviewed official material.

Suppliers & relationships

7 suppliers / hosts · 7 relationships

  • Critical SoftwareSupplierCategory not recorded

    Partnership

    Progress unconfirmed · Disclosure

    Critical Software reports that its Karvel onboard software platform ran across multiple ATHENE-1 onboard systems and reached TRL 9 in orbit.

  • OHB Czechspace s.r.o.SupplierCategory not recorded

    Role confirmed

    LaunchedReported

    LuxSpace reported that electronic units designed by OHB Czechspace were installed on the satellite that reached orbit.

Show all 7 relationships & detailsHide relationship details for ATHENE-1 / SeRANIS orbital research platform
  • Critical SoftwareSupplierCategory not recorded

    Partnership

    Progress unconfirmed · Disclosure

    Critical Software reports that its Karvel onboard software platform ran across multiple ATHENE-1 onboard systems and reached TRL 9 in orbit.

    The official source establishes flight use but does not disclose a procurement instrument, installed computer models or the number of software instances.

    Associated organization: Universität der Bundeswehr München

    Source ↗
  • OHB Czechspace s.r.o.SupplierCategory not recorded

    Role confirmed

    LaunchedReported

    LuxSpace reported that electronic units designed by OHB Czechspace were installed on the satellite that reached orbit.

    Original disclosure: OHB Czechspace designed electronic units installed on ATHENE-1 to support its payloads.

    Associated organization: Universität der Bundeswehr München

    Source ↗
  • Role confirmed · Ground stations & ground segment

    Progress unconfirmed · Disclosure

    DLR GSOC provides ground infrastructure for telemetry, commands, monitoring and satellite control.

    The shared research satellite provides flight experience for new computing, sensing and communications technologies.

    Associated organization: Universität der Bundeswehr München

    Source ↗
  • Role confirmed · Satellite bus

    Progress unconfirmed · Disclosure

    LuxSpace developed and built ATHENE-1 with UniBw Munich using its Triton-X Heavy platform.

    The shared research satellite provides flight experience for new computing, sensing and communications technologies.

    Associated organization: Universität der Bundeswehr München

    Source ↗
  • Development agreement · Payload integration

    Progress unconfirmed · Disclosure

    The multifunctional experimental payload was integrated at OHB's Oberpfaffenhofen site.

    The shared research satellite provides flight experience for new computing, sensing and communications technologies.

    Associated organization: Universität der Bundeswehr München

    Source ↗
  • Role confirmed · Launch integration

    Progress unconfirmed · Disclosure

    OHB Orbital Access conducted ATHENE-1's launch campaign.

    The shared research satellite provides flight experience for new computing, sensing and communications technologies.

    Associated organization: Universität der Bundeswehr München

    Source ↗
  • SpaceXSupplierLaunch

    Role confirmed · Launch capacity

    Progress unconfirmed · Disclosure

    SpaceX provided Falcon 9 Transporter-18 launch service for ATHENE-1.

    The shared research satellite provides flight experience for new computing, sensing and communications technologies.

    Associated organization: Universität der Bundeswehr München

    Source ↗
Open relationship research →
Kepler Tranche 2Kepler Communications · CanadaLatest development 17 Nov 2026 ↗
Manual review with evidence gaps 26 Nov 2026

Stage detail: Launch arranged

Kepler lists 400 kg-class satellites for Motus Via Sol and 300 kg-class satellites in its general 2028 hosting offer. Kepler has not said which launch will carry the spacecraft in the hosting offer.

Last full profile review: 15 Oct 2026.

Sources collected: 23 Oct 2026.

Source collection and substantive profile review are separate checks.

Optical relay, onboard compute and hosted payload expansionDevelopmentLaunch arranged
Next project milestone

Multiple 2028 launches: dedicated Neutron mission no earlier than 2028 and ten-satellite Motus Via Sol allocation targeted for mid-2028.

10 satellitesMotus Via Sol ten-satellite allocationPlanned specification · Mid-2028
Notes & source

Configuration: Motus Via Sol allocation

Launch capacity secured for this tranche. Does not count Kepler’s earlier fleet.

Evidence basis: Planned specification · Mid-2028

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
Ten Tranche 2 host spacecraft for Vyoma FlaHOPs allocationVyoma-hosting dedicated launch allocationAnnounced design or research specification
Notes & source

Configuration: Vyoma-hosting dedicated launch allocation

The release links the dedicated Neutron mission. Separate from the existing Motus Via Sol ten-satellite allocation, without an inferred aggregate.

Evidence basis: Announced design or research specification

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

Direct November8 source comparison and targeted processor, memory, electrical/thermal and communications searches found no additional configuration-specific numerical value for this field. Existing source-scoped design descriptions and held references remain separate.

Not disclosed in reviewed sources
Coverage note

Direct November8 source comparison and targeted processor, memory, electrical/thermal and communications searches found no additional configuration-specific numerical value for this field. Existing source-scoped design descriptions and held references remain separate.

Suppliers & relationships

4 suppliers / hosts · 5 relationships

  • Contract / order disclosed · Payload integration · Optical links

    PlannedReported

    Kepler plans to host Vyoma's surveillance payloads on ten Tranche 2 satellites, with a dedicated launch no earlier than October 2028.

  • Portal Space SystemsStrategic partner

    Partnership

    Progress unconfirmed · Disclosure

    Motus Via Sol mission partnership providing launch access alongside Portal spacecraft for ten Kepler Tranche 2 satellites

Show all 5 relationships & detailsHide relationship details for Kepler Tranche 2
  • Contract / order disclosed · Payload integration · Optical links

    PlannedReported

    Kepler plans to host Vyoma's surveillance payloads on ten Tranche 2 satellites, with a dedicated launch no earlier than October 2028.

    Original disclosure: Hosting of Vyoma FlaHOP surveillance payloads across ten Tranche 2 spacecraft, with Kepler optical data relay and a dedicated launch targeted no earlier than October 2028.

    Buyer: Vyoma

    Source ↗
  • Capacity reserved · Launch capacity · Launch integration

    Progress unconfirmed · Disclosure

    Capacity and launch integration for ten Kepler Tranche-2 satellites on Portal’s Motus Via Sol mission.

    Target: mid-2028. Commercial terms are undisclosed; SpaceX is the planned launch vehicle provider, not an inferred direct Kepler contract.

    Buyer: Kepler Communications

    Source ↗
  • Portal Space SystemsStrategic partner

    Partnership

    Progress unconfirmed · Disclosure

    Motus Via Sol mission partnership providing launch access alongside Portal spacecraft for ten Kepler Tranche 2 satellites

    Maverick manages Kepler payload accommodation and integration. Portal is the named mission partner, not an established Kepler spacecraft host, compute-hardware supplier or separate paid procurement.

    Associated organization: Kepler Communications

    Source ↗
  • SpaceXSupplierLaunch

    Capacity reserved · Launch capacity

    Progress unconfirmed · Disclosure

    SpaceX Falcon 9 is the named launch vehicle for the planned mid-2028 Motus Via Sol mission carrying ten Kepler Tranche 2 satellites

    Capacity was secured through Maverick for this shared mission. No separate direct Kepler-SpaceX contract or value is disclosed. Distinct from the January2026 Tranche 1 launch.

    Associated organization: Kepler Communications

    Source ↗
  • Role confirmed · Launch

    Progress unconfirmed · Disclosure

    Dedicated Neutron launch for Kepler's next-generation network expansion, no earlier than 2028.

    Price, spacecraft count and full legal terms are undisclosed. Separate from the ten-spacecraft Maverick/Portal allocation.

    Buyer: Kepler Communications

    Source ↗
Open relationship research →
Lonestar data centersLonestar Data Holdings · United StatesLatest development 17 Nov 2026 ↗
Manual review 27 Nov 2026

Stage detail: Demonstration program

Freedom used a Microchip processor running Linux and reported a networking test on the way to the Moon. The first StarVault’s 488 TB of raw storage and about 370 TB usable remain planned.

Last full profile review: 19 Oct 2026.

Sources collected: 19 Oct 2026.

Source collection and substantive profile review are separate checks.

Lunar and orbital storage and processingDemonstratedDemonstration program
Next project milestone

First StarVault payload is planned aboard LizzieSat-4 on SpaceX Bandwagon-6, alongside LizzieSat-5, no earlier than April 2027. Timing depends on qualification, integration and launch readiness.

Hosted Freedom aboard Intuitive Machines’ Athena landerAthena lunar lander on IM-2Official mission account
Notes & source

Configuration: Athena lunar lander on IM-2

Lonestar reported storage and edge-processing tests during the transit to the Moon.

Evidence basis: Official mission account

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
Scheduled to host the first StarVault payloadLizzieSat-4 host spacecraftMission plan
Notes & source

Configuration: LizzieSat-4 host spacecraft

Sidus identifies LizzieSat-4 as the spacecraft assigned to the first StarVault payload. The September 2026 announcement gives the updated launch target.

Evidence basis: Mission plan

Source / observation date: .

Supporting source ↗
Phison Pascari Space SSD storageStarVault-001Official supplier planned configuration
Notes & source

Configuration: StarVault-001 planned storage payload

Supplier names the storage family. Individual drive models, counts and mission-specific endurance or radiation limits are unspecified. Generic portfolio ratings are not installed payload specifications.

Evidence basis: Official supplier planned configuration

Source / observation date: .

Supporting source ↗
2 more configurations / specifications
Microchip PolarFire system-on-chip with a RISC-V processor, running LinuxFreedomLonestar’s published mission hardware
Notes & source

Configuration: Freedom

Lonestar announced this hardware for Freedom on IM-2. The source does not identify an exact chip variant.

Evidence basis: Lonestar’s published mission hardware

Source / observation date: .

Supporting source ↗
Phison Pascari enterprise solid-state storageFreedomOfficial Freedom mission account
Notes & source

Configuration: Freedom

Phison names its enterprise storage for Freedom. This is separate from the later Pascari Space supply for StarVault-001.

Evidence basis: Official Freedom mission account

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

This is a coverage gap in the inspected published data. It does not prove that no disclosure exists elsewhere.

Suppliers & relationships

12 suppliers / hosts · 23 relationships

  • Role confirmed · Storage payload

    Progress unconfirmed · Disclosure

    Phison Pascari Space SSD storage for StarVault-001, planned at 488 TB raw and approximately 370 TB usable.

  • City of Coral GablesStrategic partner

    Partnership

    Progress unconfirmed · Disclosure

    A 12-month founding-city pilot using StarSafe and StarKey for disaster-recovery information, security keys and a Coral Gables Digital…

Show all 23 relationships & detailsHide relationship details for Lonestar data centers
  • Role confirmed · Storage payload

    Progress unconfirmed · Disclosure

    Phison Pascari Space SSD storage for StarVault-001, planned at 488 TB raw and approximately 370 TB usable.

    Planned mission configuration. Phison targets the first half of 2027.

    Associated organization: Lonestar Data Holdings

    Source ↗

    Role confirmed · Storage payload

    Progress unconfirmed · Disclosure

    Storage hardware installed in Lonestar's Freedom lunar data-center payload.

    The source states that Phison supplied a storage device for Freedom, but does not identify the purchasing party, order value, capacity or exact hardware model.

    Associated organization: Lonestar Data Holdings

    Source ↗
  • City of Coral GablesStrategic partner

    Partnership

    Progress unconfirmed · Disclosure

    A 12-month founding-city pilot using StarSafe and StarKey for disaster-recovery information, security keys and a Coral Gables Digital Heritage Archive.

    The teams are preparing selected city data for StarVault’s planned April 2027 launch. The city retains ownership and control of its data.

    Associated organization: Lonestar Data Holdings

    Source ↗
  • Development agreement · Communications · Ground stations & ground segment

    PlannedReported

    The framework provides for staged orders and targets first ground-station deliveries in 2027.

    Original disclosure: Staged supply of a dedicated ground-station network for Lonestar orbital data infrastructure, targeting up to 30 stations with a first order covering at least 10.

    Commercial framework with orders to be placed in stages. Approximately USD 12,050,275 (PLN 47.5 million) is the value at full utilization. First deliveries are planned for 2027.

    Buyer: Lonestar Data Holdings

    Approximately USD 12,050,275 (PLN 47,500,000) · Approximately USD 12,050,275 (PLN 47.5 million) at full utilization of the staged framework. This is not an amount already ordered or paid.

    Source ↗

    Contract / order disclosed · Spacecraft protection systems

    Progress unconfirmed · Disclosure

    AI-assisted sensing and nonkinetic high-power microwave protection for three Lonestar orbital-server satellites in the initial phase. Wider constellation protection is prospective.

    ARES reports TRL 4 after laboratory tests. Orbital deployment and completed deliveries are not established. Wider constellation protection remains prospective. The signature date is undisclosed.

    Buyer: Lonestar Data Holdings

    More than USD 5,976,520 (PLN 22,000,000) · More than USD 5,976,520 (PLN 22 million). Latest issuer disclosure.

    Source ↗
  • Preliminary agreement · Payload integration · Data services

    Progress unconfirmed · Disclosure

    An LOI proposes StarVault hosting and engineering studies, with intended OSPREYBuilder participation in 2028 and larger structures from 2030.

    Intentions are subject to development and further agreements; no reserved capacity, price or firm service order is disclosed.

    Associated organization: Lonestar Data Holdings

    Source ↗
  • NASAResearch participant

    Partnership · Communications · Data services

    Progress unconfirmed · Disclosure

    The parties signed a Space Act Agreement covering off-world storage, computing and communications evaluation.

    This framework does not establish NASA funding or procurement.

    Associated organization: Lonestar Data Holdings

    Source ↗
  • Contract / order disclosed · Storage payload

    Progress unconfirmed · Disclosure

    Build and deliver an additional StarVault orbital data-storage payload under an amended agreement.

    Amendment to an existing agreement, not a separate value to add to the preliminary lunar program. April15 identified the first StarVault on LizzieSat-4. Sidus's September28 release confirms Lonestar aboard LS4 and a joint LS4/LS5 Bandwagon6 launch no earlier than April2027, subject to readiness (https://investors.sidusspace.com/news-events/press-releases/detail/294/sidus-space-to-launch-lizziesat-4-and-lizziesat-5-together). Host and schedule of the additional StarVault remain undisclosed; LS5 is not assigned to it.

    Buyer: Lonestar Data Holdings

    Source ↗

    Preliminary agreement · Satellite bus · Payload integration · Mission operations

    Progress unconfirmed · Disclosure

    Design, build, payload integration and on-orbit support for six lunar data-storage spacecraft.

    Approximately $120m preliminary agreement; the source explicitly warns a definitive agreement may not be entered into. Not booked revenue or a firm contract total.

    Buyer: Lonestar Data Holdings

    Approximately USD 120,000,000 · Approximate preliminary agreement value; not firm backlog

    Source ↗
  • Role confirmed · Solar arrays

    Progress unconfirmed · Disclosure

    Light Wing solar arrays for the Sidus spacecraft supporting Lonestar’s cislunar storage program.

    Selection by Sidus, not a direct Lonestar award. Parent program remains described as a preliminary agreement; array order value is undisclosed.

    Buyer: Sidus Space

    Source ↗
  • Partnership · Data services

    Progress unconfirmed · Disclosure

    A signed MoU covers data sharing and analysis relevant to terrestrial and space interferometry.

    Research collaboration, not a commercial storage purchase or guaranteed observing capability.

    Associated organization: Lonestar Data Holdings

    Source ↗
  • Caddis Cloud SolutionsStrategic partner

    Partnership · Cloud capacity & advisory

    In developmentReported

    Caddis reports facilitating technology partnerships for Lonestar and developing hybrid storage services spanning Earth, satellites and the Moon.

    Original disclosure: Cloud-capacity sourcing, data-center advisory and commercial-network support for Lonestar's terrestrial, orbital and lunar services.

    Original announcement ↗

    A bilateral strategic partnership. No customer, capacity commitment, purchase order, value or revenue-sharing terms are disclosed.

    Associated organization: Lonestar Data Holdings

    Source ↗
  • Partnership · Flight / payload software

    Progress unconfirmed · Disclosure

    Active Vigilance system-health and radiation-diagnostics software for Lonestar's Freedom lunar data-center payload.

    The software is described as developed by Exploration Institute and commercialized by Active Vigilance Inc. The buyer, license terms, value and responsibility split are undisclosed.

    Associated organization: Lonestar Data Holdings

    Source ↗
  • ValkyrieResearch participant

    Partnership · Flight / payload software

    Progress unconfirmed · Disclosure

    The partners announced AI and graph-database work for Lonestar's Freedom mission.

    The August 2024 first-party announcement establishes a partnership and planned Graph Database payload test, not a paid order. It gives no legal buyer, price or contract instrument. Its late-2024 lunar-landing schedule was prospective; Lonestar later reported Valkyrie AI data handling during the February-March 2025 cislunar transit, while IM-2 ended before sustained lunar-surface operations.

    Associated organization: Lonestar Data Holdings

    Source ↗
  • Partnership · Payload industrial design

    Progress unconfirmed · Disclosure

    Architectural and 3D-printed exterior design for Lonestar's Freedom lunar data-center payload.

    The announcement describes a design partnership. Commercial terms are undisclosed, and BIG is not identified as the payload hardware builder or spacecraft supplier.

    Associated organization: Lonestar Data Holdings

    Source ↗
  • Role confirmed · Processors / accelerators

    Progress unconfirmed · Disclosure

    Microchip PolarFire system-on-chip running Linux for Lonestar's Freedom lunar data-center payload; the processor family is named in the October 2024 developer-network announcement.

    The April 2024 release names Microchip as the RISC-V processor supplier; the October 22, 2024 developer-network release identifies the PolarFire SoC family (https://www.lonestarlunar.com/press-release/lonestar-unveils-lunar-developer-network). The purchasing party, exact part number, quantity, order value and commercial terms remain undisclosed. This historical Freedom hardware does not establish StarVault's configuration.

    Associated organization: Lonestar Data Holdings

    Source ↗
  • Role confirmed · Radiation sensors

    Progress unconfirmed · Disclosure

    ARMAS radiation sensor supplied for Skycorp/SpaceBilt's experiment within Lonestar's Freedom payload on IM-2.

    The April 2024 release says the sensor was built for Skycorp; the September 17, 2024 ARMAS release explicitly names Space Environment Technologies. Preserve the existing supplier identity without duplication. Contract form, price, detailed ownership and achieved mission-specific radiation measurements are not disclosed by these preflight releases.

    Buyer: Spacebilt

    Source ↗
  • Lonestar Data HoldingsCustomer service provider

    Role confirmed · Data services

    Progress unconfirmed · Disclosure

    Data-storage payload participation on Lonestar's Independence cislunar test mission.

    Lonestar calls SSPI a customer on board but does not disclose the contracting entity, value, data volume, service level or whether the relationship continued after the test.

    Customer: Space & Satellite Professionals International

    Source ↗

    Role confirmed · Data services

    DemonstratedReported

    Lonestar reported completing the Independence lunar data storage test for the State of Florida with Space Florida.

    Original disclosure: State of Florida customer participation in the IM-1 Independence storage and retrieval test.

    Original announcement ↗

    Customer announcement page is dated October 19, 2023, with an October 10 body dateline; neither is a verified contract signature date. Successful February 2024 test is documented separately at https://lonestar.space/press-releases/lonestar-lands-on-the-moon. Value, procuring legal entity, duration and recurring service terms remain undisclosed.

    Customer: State of Florida

    Source ↗
  • Development agreement · Radiators / cooling

    Progress unconfirmed · Disclosure

    Co-development and co-patenting of ultra-high-density cooling technology for terrestrial, orbital and lunar data-center applications.

    A development partnership without disclosed flight hardware, project schedule, exclusivity, purchase order, value or intellectual-property allocation.

    Associated organization: Lonestar Data Holdings

    Source ↗
  • Partnership · Mission operations

    Progress unconfirmed · Disclosure

    Hands-on mission-management services for Lonestar lunar missions.

    Lonestar identifies Tierra Lunar as Dr. Jose Hernandez's company and says it is working closely with Lonestar on mission-management services. The release does not identify a legal buyer, contract instrument, value, effective date, work package, receiving spacecraft or mission-specific allocation; no independent authoritative corroboration was found.

    Associated organization: Lonestar Data Holdings

    Source ↗
  • Contract / order disclosed · Lunar payload delivery

    Progress unconfirmed · Disclosure

    Lunar payload delivery and service testing on IM-1 and delivery of Lonestar's first full data-services payload on IM-2.

    The source confirms contracts for the first two lunar missions but does not disclose values, detailed deliverables or later schedule changes.

    Buyer: Lonestar Data Holdings

    Source ↗
  • Contract / order disclosed · Payload integration · Storage payload

    Progress unconfirmed · Disclosure

    Build Lonestar's first lunar data-services payload for the IM-2 mission, later announced as Freedom.

    The April 2022 announcement explicitly states the payload build was contracted with Skycorp, now SpaceBilt. Contract value and detailed work split are undisclosed; later Lonestar releases identify the IM-2 payload as Freedom.

    Buyer: Lonestar Data Holdings

    Source ↗
Open relationship research →
Parsimoni SpaceOSParsimoni · Europe / United StatesLatest development 17 Nov 2026 ↗
Manual review with evidence gaps 25 Nov 2026

Stage detail: Software demonstrated in orbit

Borealis ran on Clustergate-2 in April 2026. Parsimoni’s homepage reports that encryption keys were changed in orbit, but gives no date or test details. Necara’s software integration is planned.

No completed full profile review is recorded.

Sources collected: 10 Oct 2026.

Source collection and substantive profile review are separate checks.

Secure software deployment and application sharing on satellite payload computersDemonstratedSoftware demonstrated in orbit
Next project milestone

Further payload deployments and mission-specific validation of secure software updates.

SpaceOS deployed in orbit and undergoing operational testsSpaceOS on Clustergate-1Company reported orbital software demonstration
Notes & source

Configuration: SpaceOS on Clustergate-1

March 24 account reports software deployment, not completed customer-service readiness.

Evidence basis: Company reported orbital software demonstration

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
Non-real-time payload platform in a separate partition alongside existing spacecraft flight softwareGeneric SpaceOS software designCompany software design claim
Notes & source

Configuration: Generic SpaceOS software design

Generic product architecture. Bus, attitude, thermal and power-control software remains outside SpaceOS.

Evidence basis: Company software design claim

Source / observation date: .

Supporting source ↗
Arm SoC with four Cortex-A53 cores running LinuxBorealis on Clustergate-2Company reported orbital software demonstration
Notes & source

Configuration: Borealis on Clustergate-2

Host-module configuration reported for the Borealis guest. SoC model and dedicated CPU allocation are not supplied.

Evidence basis: Company reported orbital software demonstration

Source / observation date: .

Supporting source ↗
2 more configurations / specifications
Innoflight CFC-400XS with SpaceOS planned as an integrated offeringPlanned CFC-400XS and SpaceOS offeringAnnounced product integration
Notes & source

Configuration: Planned CFC-400XS and SpaceOS offering

The computer's existing flight heritage is not evidence that the combined SpaceOS offering has flown.

Evidence basis: Announced product integration

Source / observation date: .

Supporting source ↗
Applications as single-address-space VMs under KVM, Xen or Muen on ARM or x86 payload computersGeneric SpaceOS software designCompany software design claim
Notes & source

Configuration: Generic SpaceOS software design

Company reports validation on eight onboard computers, without a full model list or mapping all hypervisors to each flight. The Borealis Linux process remains a distinct configuration.

Evidence basis: Company software design claim

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The reviewed SpaceOS flight accounts and integration announcement establish no configuration-specific numeric specification for this field.

Suppliers & relationships

3 suppliers / hosts · 8 relationships

  • Partnership · Flight / payload software

    Progress unconfirmed · Disclosure

    Clustergate-2 hosted-payload module running Parsimoni's Borealis communications software.

  • ParsimoniResearch participant

    Partnership · Flight / payload software

    DemonstratedReported

    Parsimoni SpaceOS demonstrated running on a KP Labs Leopard DPU at Space Tech Expo Europe. Ground demonstration reported by KP Labs.

Show all 8 relationships & detailsHide relationship details for Parsimoni SpaceOS
  • Research participant

    Partnership · Flight / payload software

    DemonstratedReported

    Parsimoni SpaceOS demonstrated running on a KP Labs Leopard DPU at Space Tech Expo Europe. Ground demonstration reported by KP Labs.

    Original disclosure: Parsimoni SpaceOS demonstrated running on a KP Labs Leopard DPU at Space Tech Expo Europe.

    Original announcement ↗

    Ground software demonstration. No link to the LeopardISS installation or a procurement award is established.

    Associated organization: KP Labs

    Source ↗

    Partnership · Flight / payload software

    Progress unconfirmed · Disclosure

    Satlyt and Parsimoni will evaluate interoperability between distributed satellite workload orchestration and the SpaceOS runtime for secure applications across heterogeneous satellites.

    Prospective integration and exploration of technical/commercial interoperability. No completed delivery, Satlyt orbital deployment, legal procurement buyer, paid order, contract value or service availability is disclosed. Parsimoni flight heritage is not Satlyt flight evidence.

    Associated organization: Satlyt Inc.

    Source ↗

    Partnership · Flight / payload software

    Progress unconfirmed · Disclosure

    SpaceOS flight-software deployment and orbital operational testing on DPhi Space's Clustergate-1 shared payload platform.

    Orbital deployment was reported, while operational testing remained in progress. The post does not confirm completed commissioning, paid customer service or in-orbit validation of marketed performance claims.

    Associated organization: DPhi Space

    Source ↗
    Supplier

    Partnership · Flight / payload software

    Progress unconfirmed · Disclosure

    SpaceOS and Satellite App Store software integration with OHB Hellas' Versal Orbital HPC for a planned joint offering.

    The first commercial offering is planned. No named mission, purchasing terms, paid value or completed orbital integration is disclosed.

    Associated organization: OHB Hellas

    Source ↗
  • Partnership · Flight / payload software

    Progress unconfirmed · Disclosure

    Clustergate-2 hosted-payload module running Parsimoni's Borealis communications software.

    First boot occurred on April 23, 2026. Software uses the module's Linux environment and file-based ground transfer. The report planned a later signing-key rotation exercise.

    Associated organization: Parsimoni

    Source ↗
  • Necara SolutionsStrategic partner

    Development agreement

    Progress unconfirmed · Disclosure

    Parsimoni and Necara Solutions agreed to integrate Necara’s Osteo data processing software into SpaceOS for use aboard satellites.

    Associated organization: Parsimoni

    Source ↗
  • Partnership · Payload integration

    Progress unconfirmed · Disclosure

    SpaceOS integration into North American satellite mission architectures, flight systems and onboard components.

    The source announces an integration partnership. No specific customer order, paid value or completed orbital deployment is disclosed.

    Associated organization: Parsimoni

    Source ↗
  • InnoflightStrategic partner

    Partnership · Compute & storage

    Progress unconfirmed · Disclosure

    Joint offering combining Innoflight's CFC-400XS flight computer with Parsimoni's SpaceOS payload software.

    The companies announced a planned integrated offering for U.S. and European markets. The announcement identifies no mission carrying the combined product.

    Associated organization: Parsimoni

    Source ↗
Open relationship research →
OpenConstellation 1.0 onboard image processingOpen Cosmos · EuropeLatest development 16 Nov 2026 ↗
Manual review 29 Nov 2026

Stage detail: First satellites launched

Open Cosmos reported that Posidònia and Hyperion GR-1 reached orbit in July 2026. Greece’s November register names the Hyperion operator and gives its orbit. The 30-minute target is for delivering useful imagery or information.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Multiple customers share satellite infrastructure. The onboard processing analyzes the satellites’ own Earth imagery before it is sent to users.LaunchedFirst satellites launched
Next project milestone

Open Cosmos plans to expand the network. The launch announcement gave a goal of delivering useful information in as little as 30 minutes.

Shared Earth observation satellites with onboard image analysisDetailed configuration not available in reviewed material.
Not disclosed in reviewed sources
Coverage note

The sources reviewed do not give a value for this configuration.

Not disclosed in reviewed sources
Coverage note

The sources reviewed do not give a value for this configuration.

Suppliers & relationships

2 suppliers / hosts · 3 relationships

  • Open Cosmos Aegean Single Member P.C.SupplierCategory not recorded

    Contract / order disclosed

    Progress unconfirmed · Disclosure

    Open Cosmos Aegean implemented and operates Hyperion GR-1 under ESA contract 4000144613/24/NL/VA.

  • Government of the Balearic IslandsProgramme funding contributor

    Partnership

    Progress unconfirmed · Disclosure

    The Government of the Balearic Islands helped fund the Posidònia satellite through European recovery funds.

Show all 3 relationships & detailsHide relationship details for OpenConstellation 1.0 onboard image processing
  • Open Cosmos Aegean Single Member P.C.SupplierCategory not recorded

    Contract / order disclosed

    Progress unconfirmed · Disclosure

    Open Cosmos Aegean implemented and operates Hyperion GR-1 under ESA contract 4000144613/24/NL/VA.

    Buyer: European Space Agency (ESA)

    Source ↗
  • Government of the Balearic IslandsProgramme funding contributor

    Partnership

    Progress unconfirmed · Disclosure

    The Government of the Balearic Islands helped fund the Posidònia satellite through European recovery funds.

    Associated organization: Open Cosmos

    Source ↗
  • SpaceXSupplierCategory not recorded

    Role confirmed

    LaunchedReported

    SpaceX launched Posidònia and Hyperion GR-1, the first two OpenConstellation 1.0 satellites, on Transporter-17.

    Original disclosure: SpaceX launched Posidònia and Hyperion GR-1, the first two OpenConstellation 1.0 satellites, on Transporter-17.

    Associated organization: Open Cosmos

    Source ↗
Open relationship research →
Zhongke Tiansuan PlanZhongke Tiansuan · ChinaLatest development 14 Nov 2026 ↗
Manual review with evidence gaps 21 Nov 2026

Stage detail: Planned research and development

Compared the new Aurora 5000C report with the existing prototype, two-satellite plan and center forecasts. The named payload is built for flight testing, while its launch date and exact operating specifications remain undisclosed. The latest center target is around 2035.

Last full profile review: 14 Oct 2026.

Sources collected: 14 Oct 2026.

Source collection and substantive profile review are separate checks.

Shared orbital computing, integrated power research and weather AIDevelopmentPlanned research and development
Next project milestone

Launch Aurora 5000C for in-orbit validation and continue the planned two-satellite demonstration before March 2027.

Space-supercomputing core nodes coordinate with weather satellites as edge-intelligence nodesYunyao weather-computing planOfficial government published cooperation plan
Notes & source

Configuration: Planned Yunyao weather-computing cooperation

Proposed cloud-edge architecture. Yunyao's90GNSS and24remote-sensing constellation plans are not Zhongke compute deployments or additional computing assets.

Evidence basis: Official government published cooperation plan

Source / observation date: .

Supporting source ↗
2 more configurations / specifications
2 satellitesComospace, Hangsheng and Yanhe planned demonstration

April21 2026 agreement targets development, integration, launch and orbital validation before March2027. No completed launch or additional count on top of the proposed 2030 centre…

Official announced development agreement
Notes & source

Configuration: Comospace, Hangsheng and Yanhe planned demonstration

April21 2026 agreement targets development, integration, launch and orbital validation before March2027. No completed launch or additional count on top of the proposed 2030 centre is inferred.

Evidence basis: Official announced development agreement

Source / observation date: .

Supporting source ↗
Ten-thousand-card-scale space supercomputing center around 2035Proposed 2035 center roadmapCompany roadmap reported by shanghai party newspaper
Notes & source

Configuration: November 2026 center roadmap

This is a proposed deployment target. Earlier sources described a center around 2030 and are retained as historical forecasts.

Evidence basis: Company roadmap reported by shanghai party newspaper

Source / observation date: .

Supporting source ↗
10 POPS-level AI rating, arithmetic precision unspecifiedComospace and Yanhe ground-integrated prototypeCompany-reported ground development
Notes & source

Configuration: Comospace and Yanhe ground-integrated prototype

Yanhe reports joint development and integration tests. This is a company-reported prototype rating, without a measured benchmark, numerical precision or confirmed flight allocation. Distinct from the 2030 centre and generic Aurora product ranges.

Evidence basis: Company-reported ground development

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The inspected official-government accounts do not establish a configuration-specific value for this field. Solar generation is not IT demand, product-family ratings are not installed hardware, and roadmap dates are not design life.

Suppliers & relationships

2 suppliers / hosts · 5 relationships

Show all 5 relationships & detailsHide relationship details for Zhongke Tiansuan PlanOpen relationship research →
Huanyu Haohang–Hangsheng VLEO computing networkSuzhou Huanyu Haohang and Hunan Hangsheng · ChinaLatest development 12 Nov 2026 ↗
Manual review 21 Nov 2026

Stage detail: Planned constellation

Compared the August agreement account with Hunan’s November follow-up. The proposed 1,920-satellite total, two-satellite 2027 test and 24-satellite network test remain unchanged. Current sources still do not give payload models, throughput, storage, numerical orbit, power, thermal limits or spacecraft mass.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Shared very-low-orbit communications and computing infrastructureProposal / studyPlanned constellation
Next project milestone

Two technology-validation satellites are planned for 2027, followed by a 24-satellite network-validation phase.

1,920 satellitesHuanyu Haohang–Hangsheng VLEO plan

Proposed overall constellation size, also repeated by Hunan's industry department on November 12. Not launched capacity.

Company agreement reported by municipal newspaper
Notes & source

Configuration: Proposed Huanyu Haohang–Hangsheng constellation

Proposed overall constellation size, also repeated by Hunan's industry department on November 12. Not launched capacity.

Evidence basis: Company agreement reported by municipal newspaper

Source / observation date: .

Supporting source ↗
3 more configurations / specifications
2 satellitesHuanyu Haohang–Hangsheng VLEO plan

Initial technology-validation phase planned for 2027. A phase within the 1,920-satellite plan, not an additional constellation.

Company agreement reported by municipal newspaper
Notes & source

Configuration: Proposed Huanyu Haohang–Hangsheng constellation

Initial technology-validation phase planned for 2027. A phase within the 1,920-satellite plan, not an additional constellation.

Evidence basis: Company agreement reported by municipal newspaper

Source / observation date: .

Supporting source ↗
24 satellitesHuanyu Haohang–Hangsheng VLEO plan

Network-validation phase follows the initial two spacecraft. No specific follow-on launch date is established and the phase is not added to the overall 1,920 target.

Company agreement reported by municipal newspaper
Notes & source

Configuration: Proposed Huanyu Haohang–Hangsheng constellation

Network-validation phase follows the initial two spacecraft. No specific follow-on launch date is established and the phase is not added to the overall 1,920 target.

Evidence basis: Company agreement reported by municipal newspaper

Source / observation date: .

Supporting source ↗
2026–2030 planned construction windowHuanyu Haohang–Hangsheng VLEO planCompany agreement reported by municipal newspaper
Notes & source

Configuration: Proposed Huanyu Haohang–Hangsheng constellation

Roadmap for planning, development, deployment and operations. This is not a spacecraft design-life specification.

Evidence basis: Company agreement reported by municipal newspaper

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The inspected agreement and government follow-up do not give a configuration-specific specification for this field.

Not disclosed in reviewed sources
Coverage note

The inspected agreement and government follow-up do not give a configuration-specific specification for this field.

Suppliers & relationships

2 suppliers / hosts · 2 relationships

Show relationship details & sourcesHide relationship details for Huanyu Haohang–Hangsheng VLEO computing networkOpen relationship research →
NeuralSat orbital computing and data relay networkNeuralSat · GermanyLatest development 12 Nov 2026 ↗
Manual review with evidence gaps 21 Nov 2026

Stage detail: In development

NeuralSat still describes a planned shared orbital relay and computing network with a 50 Gbit per second relay ceiling and configurable edge clusters. Its homepage still conflicts between TFOPS and TOPS, while installed processors, memory, power, thermal design and orbit remain unpublished.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Shared satellite data relay and processing servicesDevelopmentIn development
Next project milestone

An initial orbital demonstration is planned for 2027. The first constellation launches are targeted from 2028.

Data relay and distributed processing shared by satellite operatorsNeuralSat planned networkPlanned specification
Notes & source

Configuration: Planned NeuralSat orbital network

The investor describes distributed processing across multiple satellites. The network is in development.

Evidence basis: Planned specification

Source / observation date: .

Supporting source ↗
2 more configurations / specifications
First orbital demonstration planned for 2027NeuralSat 2027 demonstrationPlanned specification
Notes & source

Configuration: Planned initial orbital demonstration

Announced development target. A specific launch date and demonstrated results are not reported.

Evidence basis: Planned specification

Source / observation date: .

Supporting source ↗
First constellation launches targeted from 2028NeuralSat planned networkPlanned specification
Notes & source

Configuration: Planned NeuralSat orbital network

Initial launch target rather than a completed deployment.

Evidence basis: Planned specification

Source / observation date: .

Supporting source ↗
Distributed computing clusters and AI accelerationNeuralSat planned networkPlanned specification
Notes & source

Configuration: Planned NeuralSat orbital network

Planned service architecture. No processor model, installed count or arithmetic format is specified.

Evidence basis: Planned specification

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The inspected official company homepage, services, products and investor announcement do not specify a configuration-specific value for this field.

Suppliers & relationships

No relationships recorded.

View project organizations →
OwlO Orbital Cloud NodesOwlO Cloud · Luxembourg / EuropeLatest development 12 Nov 2026 ↗
Manual review with evidence gaps 21 Nov 2026

Stage detail: Proposed

Compared OwlO Cloud’s current network description with its 2030 roadmap and preliminary collaborations. The site describes three prototype orbital computing nodes in the founder’s experience but does not identify them as OwlO deployments. Node hardware, memory, power, thermal design, orbit and launch plan remain undisclosed.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Shared orbital computing and storage servicesProposal / studyProposed
Next project milestone

Develop the initial Orbital Cloud Nodes network, targeting operations in 2030.

Initial network targeted for 2030Initial OwlO networkFounder interview
Notes & source

Configuration: Planned OwlO Orbital Cloud Nodes network

CEO interview gives the deployment target.

Evidence basis: Founder interview

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
At least 10 satellitesInitial OwlO network

The CEO interview account describes at least ten nodes by 2030. The distributed company announcement says more than ten, so ten is retained only as a lower bound.

Founder interview
Notes & source

Configuration: Planned OwlO Orbital Cloud Nodes network

The CEO interview account describes at least ten nodes by 2030. The distributed company announcement says more than ten, so ten is retained only as a lower bound.

Evidence basis: Founder interview

Source / observation date: .

Supporting source ↗
Cooperating data processing and storage nodesInitial OwlO networkPlanned architecture
Notes & source

Configuration: Planned OwlO Orbital Cloud Nodes network

The operator describes shared processing across nodes without specifying processor models or installed counts.

Evidence basis: Planned architecture

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

No project-specific value for this field was established from the official website and inspected announcement material. Generic conference architecture is not an installed configuration.

Suppliers & relationships

1 supplier / host · 2 relationships

  • Preliminary agreement · Compute & storage

    Progress unconfirmed · Disclosure

    Engineering and preparation of computing payloads for OwlO Cloud’s initial Orbital Cloud Nodes constellation.

  • Thales Alenia SpaceStrategic partner

    Preliminary agreement

    Progress unconfirmed · Disclosure

    OwlO Cloud joined Thales Alenia Space’s Space Business Catalyst industrial acceleration programme to develop a European space computing…

Show relationship details & sourcesHide relationship details for OwlO Orbital Cloud Nodes
  • Preliminary agreement · Compute & storage

    Progress unconfirmed · Disclosure

    Engineering and preparation of computing payloads for OwlO Cloud’s initial Orbital Cloud Nodes constellation.

    The companies announced a memorandum of understanding. Edge’s CEO described cooperation on the initial constellation.

    Buyer: OwlO Cloud

    Source ↗
  • Thales Alenia SpaceStrategic partner

    Preliminary agreement

    Progress unconfirmed · Disclosure

    OwlO Cloud joined Thales Alenia Space’s Space Business Catalyst industrial acceleration programme to develop a European space computing ecosystem.

    The announced memorandum and acceleration programme do not specify a satellite procurement order.

    Associated organization: OwlO Cloud

    Source ↗
Open relationship research →
JAXA D-OBEC / QPS-SAR12JAXA / iQPS · JapanLatest development 10 Nov 2026 ↗
Manual review 26 Nov 2026

Stage detail: In-orbit demonstrations

Rocket Lab confirmed the host satellite entered a circular orbit at 575 km. JAXA’s app selection and Space Shift’s four ship detection trials are separate steps.

Last full profile review: 16 Oct 2026.

Sources collected: 16 Oct 2026.

Source collection and substantive profile review are separate checks.

Post-launch AI apps and SAR image processingDemonstratedIn-orbit demonstrations
Next project milestone

Further results from the selected AI apps and confirmation of continuing demonstration operations; no firm next event date disclosed.

1 satelliteD-OBEC mission / H²-OBC computerLaunched hardware specification
Notes & source

Configuration: QPS-SAR12 host carrying JAXA D-OBEC

Single named host confirmed by iQPS and JAXA; other iQPS spacecraft and selected apps are not additional compute satellites.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
AMD Ryzen Embedded V1605B with Radeon Vega 8 graphics and one Intel Movidius Myriad VPU, NCS2-equivalentD-OBEC mission / H²-OBC computerPublished environment specification
Notes & source

Configuration: D-OBEC mission / H²-OBC computer

JAXA's July 15, 2025 host-environment specification. Trial apps may use CPU or VPU base images and cannot access the GPU. H²-OBC's accepted modified-Unibap-iX10 provenance is retained, without importing a generic processor benchmark or inferring installed current utilization.

Evidence basis: Published environment specification

Source / observation date: .

Supporting source ↗
About 0.04 kWD-OBEC mission / H²-OBC computer

JAXA lists approximately 40 W for the computer. Rating condition and exact current flight consumption are not stated; exclude host spacecraft demand.

Reported specification
Notes & source

Configuration: JAXA H²-OBC computer

JAXA lists approximately 40 W for the computer. Rating condition and exact current flight consumption are not stated; exclude host spacecraft demand.

Evidence basis: Reported specification

Source / observation date: .

Supporting source ↗
Suppliers & relationships

6 suppliers / hosts · 15 relationships

  • Role confirmed · Communications

    Progress unconfirmed · Disclosure

    Inmarsat relay was used to deliver D-OBEC ship-identification results to users; JAXA reported average latency of about 14 minutes from…

  • Degas (Degas株式会社)Research participant

    Development agreement · Flight / payload software · Research & feasibility studies

    Progress unconfirmed · Disclosure

    Three selected app proposals: observation-data compression; ship detection with satellite coordination; and SAR interference detection. The…

Show all 15 relationships & detailsHide relationship details for JAXA D-OBEC / QPS-SAR12
  • Role confirmed · Communications

    Progress unconfirmed · Disclosure

    Inmarsat relay was used to deliver D-OBEC ship-identification results to users; JAXA reported average latency of about 14 minutes from observation completion.

    Slide 8 establishes use of Inmarsat relay service, not legal procurement buyer or price. No optical-link role is inferred. June 4 is presentation date, and this result predates Space Shift’s June-July trials; it must not be attributed to that app. The original PDF was visually reviewed; automated capture remains separate.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • Role confirmed · Processors / accelerators

    Progress unconfirmed · Disclosure

    JAXA’s H²-OBC uses a Unibap iX10 commercial computer modified for the satellite’s thermal, mechanical and electrical environment.

    Hardware provenance is explicit on slide 6 of JAXA’s June 4, 2026 status presentation. The flight computer is a JAXA modification of the commercial Unibap iX10. Direct procurement buyer, signing date, price and exact modifications are not disclosed; June 4 is presentation date. The complete original PDF was downloaded and visually reviewed; automated source capture remains separate.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • Degas (Degas株式会社)Research participant

    Development agreement · Flight / payload software · Research & feasibility studies

    Progress unconfirmed · Disclosure

    Three selected app proposals: observation-data compression; ship detection with satellite coordination; and SAR interference detection. The source does not establish three separate executed contracts.

    JAXA’s selection result reports demonstration agreements with proposers. The call assigns app-development costs to applicants and environment/data/orbital-operation costs to JAXA; it does not establish a paid procurement award. Contract signing dates, value and executed terms are not disclosed. Selection alone does not establish a completed flight experiment. March 2 is the selection-result publication date corroborated by JAXA’s dated program index.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • Development agreement · Flight / payload software · Research & feasibility studies

    Progress unconfirmed · Disclosure

    Development of QPS SAR onboard AI for rapid urban-flood detection and wide-area monitoring.

    JAXA’s selection result reports demonstration agreements with proposers. The call assigns app-development costs to applicants and environment/data/orbital-operation costs to JAXA; it does not establish a paid procurement award. Contract signing dates, value and executed terms are not disclosed. Selection alone does not establish a completed flight experiment. March 2 is the selection-result publication date corroborated by JAXA’s dated program index.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • Development agreement · Flight / payload software · Research & feasibility studies

    In developmentReported

    Hutzper is developing SAR-ResQ to assess potential disaster damage from radar imagery onboard a satellite.

    Original disclosure: Development of SAR-ResQ, an onboard AI app for early identification of buildings at risk of collapse.

    Original announcement ↗

    JAXA’s selection result reports demonstration agreements with proposers. The call assigns app-development costs to applicants and environment/data/orbital-operation costs to JAXA; it does not establish a paid procurement award. Contract signing dates, value and executed terms are not disclosed. Selection alone does not establish a completed flight experiment. March 2 is the selection-result publication date corroborated by JAXA’s dated program index.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • Development agreement · Flight / payload software · Research & feasibility studies

    Progress unconfirmed · Disclosure

    Research into vessel-class identification using onboard AI logic on SAR satellite data.

    JAXA’s selection result reports demonstration agreements with proposers. The call assigns app-development costs to applicants and environment/data/orbital-operation costs to JAXA; it does not establish a paid procurement award. Contract signing dates, value and executed terms are not disclosed. Selection alone does not establish a completed flight experiment. March 2 is the selection-result publication date corroborated by JAXA’s dated program index.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • NTT, Inc. (NTT株式会社)Research participant

    Development agreement · Flight / payload software · Research & feasibility studies

    Progress unconfirmed · Disclosure

    Development of an onboard SAR application for real-time port monitoring.

    JAXA’s selection result reports demonstration agreements with proposers. The call assigns app-development costs to applicants and environment/data/orbital-operation costs to JAXA; it does not establish a paid procurement award. Contract signing dates, value and executed terms are not disclosed. Selection alone does not establish a completed flight experiment. March 2 is the selection-result publication date corroborated by JAXA’s dated program index.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • SEC (株式会社セック)Research participant

    Development agreement · Flight / payload software · Research & feasibility studies

    Progress unconfirmed · Disclosure

    Development of an onboard change-detection application that records observations, analyzes changes and generates notifications.

    JAXA’s selection result reports demonstration agreements with proposers. The call assigns app-development costs to applicants and environment/data/orbital-operation costs to JAXA; it does not establish a paid procurement award. Contract signing dates, value and executed terms are not disclosed. Selection alone does not establish a completed flight experiment. March 2 is the selection-result publication date corroborated by JAXA’s dated program index.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • Development agreement · Flight / payload software · Research & feasibility studies

    Progress unconfirmed · Disclosure

    Development and orbital demonstration of deep-learning water and ship-detection models; four successful observations were later reported in June-July 2026.

    JAXA’s selection result reports demonstration agreements with proposers. The call assigns app-development costs to applicants and environment/data/orbital-operation costs to JAXA; it does not establish a paid procurement award. Contract signing dates, value and executed terms are not disclosed. Selection alone does not establish a completed flight experiment. March 2 is the selection-result publication date corroborated by JAXA’s dated program index.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • SynspectiveResearch participant

    Development agreement · Flight / payload software · Research & feasibility studies

    Progress unconfirmed · Disclosure

    Development of onboard SAR AI for ocean-surface classification and hazard awareness.

    JAXA’s selection result reports demonstration agreements with proposers. The call assigns app-development costs to applicants and environment/data/orbital-operation costs to JAXA; it does not establish a paid procurement award. Contract signing dates, value and executed terms are not disclosed. Selection alone does not establish a completed flight experiment. March 2 is the selection-result publication date corroborated by JAXA’s dated program index.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • Development agreement · Flight / payload software · Research & feasibility studies

    Progress unconfirmed · Disclosure

    Development of an emergency flood-area estimation service using a satellite onboard AI app.

    JAXA’s selection result reports demonstration agreements with proposers. The call assigns app-development costs to applicants and environment/data/orbital-operation costs to JAXA; it does not establish a paid procurement award. Contract signing dates, value and executed terms are not disclosed. Selection alone does not establish a completed flight experiment. March 2 is the selection-result publication date corroborated by JAXA’s dated program index.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • Contract / order disclosed · Launch capacity

    Progress unconfirmed · Disclosure

    Dedicated Electron launch of QPS-SAR12 hosting D-OBEC, identified as the fourth launch under iQPS’s eight-satellite launch agreement announced February 28, 2025. The launch was delivered August 5, 2025.

    This row covers the named D-OBEC host launch only. No price is disclosed, and the remaining contracted spacecraft do not become D-OBEC compute nodes. August 1 is the mission-allocation publication date, not contract signing date.

    Buyer: Institute for Q-shu Pioneers of Space, Inc. (iQPS) (株式会社QPS研究所)

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • Role confirmed · Processors / accelerators

    Progress unconfirmed · Disclosure

    AMD Ryzen Embedded V1605B with Radeon Vega 8 graphics named in the D-OBEC host computer specification.

    Published component technology use in JAXA’s host environment. Trial apps can use CPU or VPU resources, not the GPU. No direct procurement order, buyer, individual component price or purchase date is disclosed. July 15 is document publication date, not contract signature.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • Role confirmed · Processors / accelerators

    Progress unconfirmed · Disclosure

    One Intel Movidius Myriad NCS2-equivalent VPU named in the D-OBEC host computer specification.

    Published component technology use in JAXA’s host environment. Trial apps can use CPU or VPU resources, not the GPU. No direct procurement order, buyer, individual component price or purchase date is disclosed. July 15 is document publication date, not contract signature.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

    Source ↗
  • Partnership · Payload integration · Mission operations · Research & feasibility studies

    Progress unconfirmed

    iQPS is the named joint-research partner hosting JAXA’s onboard AI computing equipment on its QPS-SAR12 satellite.

    JAXA describes joint research and hosted equipment. No paid hosting contract value or agreement date is disclosed. The source is undated; do not substitute retrieval date for announcement date.

    Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構)

Open relationship research →
Mitsubishi Electric–NTT megaconstellation studyMitsubishi Electric and four partners · JapanLatest development 9 Nov 2026 ↗
Manual review 24 Nov 2026

Stage detail: Joint feasibility study

Mitsubishi Electric, NTT, and three partners are studying whether a satellite network could support services including space data centers. The partners have set out their roles in the study.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Joint feasibility research for multi-service satellite infrastructure including space data centersProposal / studyJoint feasibility study
Next project milestone

Joint technical and commercial feasibility findings

Satellite-network and space-data-center feasibility studyDetailed configuration not available in reviewed material.
Digital Space Interface considered for adding and updating onboard softwareFive-company megaconstellation studyIssuer feasibility study description
Notes & source

Configuration: Five-company megaconstellation concept

Open interface under development by the Digital Space Consortium. Adoption in the proposed constellation is under study.

Evidence basis: Issuer feasibility study description

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The joint-study announcement does not select a mission configuration or disclose a quantitative it specification.

Suppliers & relationships

4 relationships

Show all 4 relationships & detailsHide relationship details for Mitsubishi Electric–NTT megaconstellation studyOpen relationship research →
Tiansuan / BUPT Orbital Computing Research PlatformBeijing University of Posts and Telecommunications / Spacety · ChinaLatest development 5 Nov 2026 ↗
Manual review 23 Nov 2026

Stage detail: Research satellites launched

BUPT-4 launched on July 22, 2026. Beijing’s separate cloud platform pools resources from several operators, including BUPT.

Last full profile review: 18 Oct 2026.

Sources collected: 18 Oct 2026.

Source collection and substantive profile review are separate checks.

Open satellite computing and network-security experimentsLaunchedResearch satellites launched
Next project milestone

Publish current per-node experiment and federated-cloud service availability, verified benchmarks and further phase-two launches

24 satellitesPhase-two roadmap, not deployed totalPlanned specification
Notes & source

Configuration: Tiansuan second-phase deployment plan

Planned phase-two total. Do not infer that 24 satellites have launched or add earlier repository phase figures as deployed capacity.

Evidence basis: Planned specification

Source / observation date: .

Supporting source ↗
3 more configurations / specifications
16 satellitesResearch network reported September 7, 2026

Beijing Haidian Commerce Bureau reports a network of sixteen LEO satellites. This is an attributed program snapshot, not sixteen dedicated compute satellites, an audited live…

Reported specification
Notes & source

Configuration: Research network reported September 7, 2026

Beijing Haidian Commerce Bureau reports a network of sixteen LEO satellites. This is an attributed program snapshot, not sixteen dedicated compute satellites, an audited live count, or an amount additional to historical launch batches.

Evidence basis: Reported specification

Source / observation date: .

Supporting source ↗
More than 40 satellite resourcesFederated cloud resource pool, October 2026

Reported coverage is more than 40 satellite resources, including BUPT-2/3 and third-party spacecraft. It is not an independently audited active count, a new launch batch or…

Attributed government platform account
Notes & source

Configuration: Beijing center federated cloud released October 30, 2026

Reported coverage is more than 40 satellite resources, including BUPT-2/3 and third-party spacecraft. It is not an independently audited active count, a new launch batch or capacity additional to the 16-satellite Tiansuan snapshot.

Evidence basis: Attributed government platform account

Source / observation date: .

Supporting source ↗
Planned twelve-satellite network and native space-computing chip verification in 2028Tiansuan 2027–2029 roadmapAttributed chief scientist interview
Notes & source

Configuration: Tiansuan 2027–2029 roadmap

The same roadmap plans an open-source computing satellite in2027 and commercial operations in2029. This is a dated plan, distinct from the earlier24-satellite phase-two target.

Evidence basis: Attributed chief scientist interview

Source / observation date: .

Supporting source ↗
Satellite-computing module and satellite-network security moduleBUPT-4 / TY49 spacecraftOfficial launch hardware description
Notes & source

Configuration: BUPT-4 / TY49 spacecraft

University launch account identifies these modules and a small remote-sensing camera. Processor models, memory and computing throughput are not specified. Launch telemetry is not a sustained compute benchmark. The university-authored July 23 launch account on Beijing Daily's author platform confirms the same modules and camera at https://peking.bjd.com.cn/content/s6a622584e4b0e45f3fd517fc.html.

Evidence basis: Official launch hardware description

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
Ground CPU, GPU and NPU resources pooled with satellite resourcesFederated cloud resource pool, October 2026Attributed government platform account
Notes & source

Configuration: Beijing center federated cloud released October 30, 2026

These processor classes describe the ground resource pool. No installed orbital processor model, accelerator count, throughput or arithmetic precision is specified.

Evidence basis: Attributed government platform account

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

University-authored BUPT-4 launch account and supplier solar-wing mission account do not give installed processor ratings, RAM, storage capacity or IT-only electrical power. The separately reported token-per-joule claim lacks an identified configuration and benchmark.

Suppliers & relationships

6 suppliers / hosts · 18 relationships

Show all 18 relationships & detailsHide relationship details for Tiansuan / BUPT Orbital Computing Research PlatformOpen relationship research →

Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.