Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving SpaceX.
1–25 of 56 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| Aethero DeimosAssociated organization: Aethero | SpaceX | Supplier | Launch capacityProgress unconfirmed · Disclosure Transporter-11 launch service used for Deimos on August 16, 2024. History & full recordDelivered launch-provider role; direct purchasing entity, intermediary, award date and price are not established. The date is the launch announcement. Buyer: Not disclosed. Associated organization: Aethero. Project profile: Aethero Deimos Evidence checked 26 Sept 2026. | Role confirmedSource ↗ |
| Aethero PhobosAssociated organization: Aethero | SpaceX | Supplier | Launch capacityProgress unconfirmed · Disclosure Falcon 9 Transporter-16 launch service used for Phobos on March 30, 2026. History & full recordDelivered launch-provider role; the direct purchasing entity, booking intermediary, award date and price are not established. Announcement date follows the launch release. Buyer: Not disclosed. Associated organization: Aethero. Project profile: Aethero Phobos Evidence checked 26 Sept 2026. | Role confirmedSource ↗ |
| Aethero TitanAssociated organization: Aethero | SpaceX | Supplier | Launch capacity PlannedReport date unconfirmed Aethero targets SpaceX’s Bandwagon-6 flight no earlier than the second quarter of 2027. Progress source ↗History & full recordOriginal disclosure: SpaceX’s Bandwagon-6 rideshare is listed as Titan’s planned launch into a mid-inclination orbit. Aethero lists the mission on the rideshare. Buyer: Not disclosed. Associated organization: Aethero. Project profile: Aethero Titan Evidence checked 27 Nov 2026. | Role confirmedDisclosure date not suppliedSource ↗ |
| Altair-Next GenAssociated organization: Orbitworks | SpaceX | Supplier | Launch integration LaunchedReported Altair-1 launched on October 1, 2026, deployed and made contact with the ground. History & full recordOriginal disclosure: SpaceX carried Altair-1 on its Falcon 9 Transporter-18 rideshare from Vandenberg, California. Buyer: Not disclosed. Associated organization: Orbitworks. Project profile: Altair-Next Gen Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| ArkEdge Space AE2a onboard computer testAssociated organization: ArkEdge Space Inc. (株式会社アークエッジ・スペース) | SpaceX | Supplier | Progress unconfirmed · Disclosure SpaceX launched ArkEdge’s AE2a satellite on its Transporter-14 rideshare. AE2a carried ArkEdge’s onboard computer experiment. History & full recordBuyer: Not disclosed. Associated organization: ArkEdge Space Inc. (株式会社アークエッジ・スペース). Project profile: ArkEdge Space AE2a onboard computer test Evidence checked 23 Nov 2026. | Role confirmedSource ↗ |
| Astrolab LUMISAssociated organization: Astrolab | SpaceX | Host | Lunar payload deliveryProgress unconfirmed · Disclosure Planned Starship transport for Astrolab’s commercial FLEX mission, targeting first LUMIS utility-node deployment in 2028 History & full recordAstrolab’s November 4 release targets the first deployment in 2028 through its planned commercial FLEX mission. Buyer: Not disclosed. Associated organization: Astrolab. Project profile: Astrolab LUMIS Evidence checked 6 Nov 2026. | Role confirmedSource ↗ |
| ATHENE-1 / SeRANIS orbital research platformAssociated organization: Universität der Bundeswehr München | SpaceX | Supplier | Launch capacityProgress unconfirmed · Disclosure SpaceX provided Falcon 9 Transporter-18 launch service for ATHENE-1. History & full recordThe shared research satellite provides flight experience for new computing, sensing and communications technologies. Buyer: Not disclosed. Associated organization: Universität der Bundeswehr München. Project profile: ATHENE-1 / SeRANIS orbital research platform Evidence checked 1 Nov 2026. | Role confirmedSource ↗ |
| BEACON CubeRover lunar AI demonstrationHPE Spaceborne Computer-4Associated organization: Astrobotic Technology | SpaceX | Supplier | PlannedReported NASA lists Falcon Heavy for the planned Griffin-1 launch. History & full recordOriginal disclosure: NASA names SpaceX’s Falcon Heavy for Griffin-1, which is planned to carry both the FLIP and BEACON lunar rovers. Buyer: Not disclosed. Associated organization: Astrobotic Technology. Project profile: BEACON CubeRover lunar AI demonstration Project profile: HPE Spaceborne Computer-4 Evidence checked 28 Nov 2026. | PartnershipSource ↗ |
| Black Kite-1 GPU demonstrationBuyer: Rapidtek Technologies Inc. (鐳洋科技股份有限公司) | SpaceX | Supplier | Launch capacity LaunchedReported Rapidtek reports that Black Kite-1 reached orbit on SpaceX Transporter-15 in November 2025. History & full recordOriginal disclosure: SpaceX Falcon 9 Transporter-15 launch of Rapidtek’s Black Kite-1 satellite. The source establishes the stated role and stage. No purchase value is disclosed. Buyer: Rapidtek Technologies Inc. (鐳洋科技股份有限公司). Project profile: Black Kite-1 GPU demonstration Evidence checked 18 Nov 2026. | Role confirmedSource ↗ |
| Cal Poly CARP space chip experimentAssociated organization: California Polytechnic State University, San Luis Obispo | SpaceX | Supplier | LaunchedReported SpaceX launched SAL-E aboard Falcon 9 on March 30, 2026. History & full recordOriginal disclosure: SpaceX carried SAL-E and the CARP test chip to low Earth orbit aboard Transporter-16. Buyer: Not disclosed. Associated organization: California Polytechnic State University, San Luis Obispo. Project profile: Cal Poly CARP space chip experiment Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| D-Orbit Nebula / ION Space CloudAssociated organization: D-Orbit | SpaceX | Supplier | Launch capacityProgress unconfirmed · Disclosure Falcon 9 launch of ION SCV 003, the Wild Ride host carrying Nebula computing. History & full recordConfirmed launch-provider role for the multipurpose host. The buyer and launch price are not inferred; unrelated hosted payloads are outside this compute record. Buyer: Not disclosed. Associated organization: D-Orbit. Project profile: D-Orbit Nebula / ION Space Cloud Evidence checked 26 Sept 2026. | Role confirmedSource ↗ |
| Dcubed ARAQYS-D3 solar power demonstrationAssociated organization: Dcubed | SpaceX | Supplier | Progress unconfirmed · Disclosure Dcubed plans to launch ARAQYS-D3 on a SpaceX rideshare. History & full recordBuyer: Not disclosed. Associated organization: Dcubed. Project profile: Dcubed ARAQYS-D3 solar power demonstration Evidence checked 23 Nov 2026. | Role confirmedSource ↗ |
| DPhi Space Clustergate-1Associated organization: D-Orbit | SpaceX | Supplier | Launch integration LaunchedReported D-Orbit confirmed that ION reached its deployment orbit on March 15 UTC. History & full recordOriginal disclosure: SpaceX launched ION on Transporter-13 carrying the hosted Clustergate-1 computer. Buyer: Not disclosed. Associated organization: D-Orbit. Project profile: DPhi Space Clustergate-1 Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| DPhi Space Clustergate-2Associated organization: Momentus | SpaceX | Supplier | Launch integration LaunchedReported Transporter-16 carried Vigoride 7 to low Earth orbit. History & full recordOriginal disclosure: SpaceX launched Momentus’s Vigoride 7 into low Earth orbit on Transporter-16. Clustergate-2 flew aboard Vigoride 7. Buyer: Not disclosed. Associated organization: Momentus. Project profile: DPhi Space Clustergate-2 Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| EDGX STERNA orbital-computing demonstrationsAssociated organization: EDGX | SpaceX | Supplier | Launch capacityProgress unconfirmed · Disclosure Transporter-16 launch carrying the March 2026 STERNA demonstration payloads. History & full recordLaunch role is established. Direct contracting party and price are not disclosed. The ESA source establishes launch participation but does not disclose an EDGX launch contract or order. This record is excluded from contract-record totals. Buyer: Not disclosed. Associated organization: EDGX. Project profile: EDGX STERNA orbital-computing demonstrations Evidence checked 27 Oct 2026. | Role confirmedSource ↗ |
| EMISAR and OrbFIXAssociated organization: Institute of Space Science | SpaceX | Supplier | Launch capacity LaunchedReported EMISAR reached Earth orbit on SpaceX’s Transporter-16 mission. History & full recordOriginal disclosure: SpaceX launched EMISAR on its Transporter-16 rideshare mission. Buyer: Not disclosed. Associated organization: Institute of Space Science. Project profile: EMISAR and OrbFIX Evidence checked 24 Nov 2026. | PartnershipSource ↗ |
| ERMIS satellite data processing and laser linksAssociated organization: National and Kapodistrian University of Athens (Εθνικόν και Καποδιστριακόν Πανεπιστήμιον Αθηνών) | SpaceX | Supplier | LaunchedReported The three satellites were carried to orbit on March 30, 2026. Progress source ↗History & full recordOriginal disclosure: SpaceX flew the three ERMIS satellites on Falcon 9 as part of its Transporter-16 mission. Buyer: Not disclosed. Associated organization: National and Kapodistrian University of Athens (Εθνικόν και Καποδιστριακόν Πανεπιστήμιον Αθηνών). Project profile: ERMIS satellite data processing and laser links Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| ESA Φsat-2Associated organization: European Space Agency (ESA) | SpaceX | Supplier | Launch capacity Work completedReported SpaceX launched Φsat-2 aboard Falcon 9 on the Transporter-11 rideshare mission on 16 August 2024. Progress source ↗History & full recordOriginal disclosure: Φsat-2: Falcon 9 Transporter-11 launch on 16 August 2024 Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: ESA Φsat-2 Evidence checked 5 Nov 2026. | Role confirmedSource ↗ |
| Galaxia Virtual Satellite-as-a-ServiceAssociated organization: Galaxia Space Systems | SpaceX | Supplier | Launch capacityProgress unconfirmed · Disclosure Falcon 9 launch of Galaxia Möbius-1 on Transporter-14 on June 23, 2025. History & full recordBuyer: Not disclosed. Associated organization: Galaxia Space Systems. Project profile: Galaxia Virtual Satellite-as-a-Service Evidence checked 7 Nov 2026. | Role confirmedSource ↗ |
| GOMX-5 orbital software testbedAssociated organization: GomSpace | SpaceX | Supplier | Launch capacityProgress unconfirmed · Disclosure Transporter-18 rideshare launch listed for GOMX-5 History & full recordAnnouncement date is not a contract-signing date. Launch price is unspecified Buyer: Not disclosed. Associated organization: GomSpace. Project profile: GOMX-5 orbital software testbed Evidence checked 9 Nov 2026. | Role confirmedSource ↗ |
| HyperionBuyer: KSAT (Kongsberg Satellite Services) | SpaceX | Supplier | Progress unconfirmed · Disclosure Launch for the first Hyper satellites, identified by KSAT as the Hyperion demonstration mission. History & full recordKSAT confirms the signed launch contract and a late-2027 target; contract value and exact launch date are not disclosed. Hyperion association is explicitly corroborated in KSAT’s June 2026 account. Buyer: KSAT (Kongsberg Satellite Services). Project profile: Hyperion Evidence checked 28 Sept 2026. | Contract / order disclosedSource ↗ |
| JAXA / iQPS FLIP radar imagingBuyer: Institute for Q-shu Pioneers of Space, Inc. (iQPS) (株式会社QPS研究所) | SpaceX | Supplier | Launch capacity Work completedReported SpaceX launched QPS-SAR6 on Transporter-8. iQPS reported successful insertion about 540 km above Earth. Progress source ↗History & full recordOriginal disclosure: SpaceX provided the Transporter-8 launch for iQPS’s QPS-SAR6 spacecraft, which carried FLIP. Buyer: Institute for Q-shu Pioneers of Space, Inc. (iQPS) (株式会社QPS研究所). Project profile: JAXA / iQPS FLIP radar imaging Evidence checked 26 Nov 2026. | Contract / order disclosedSource ↗ |
| Kepler Tranche 1Associated organization: Kepler Communications | SpaceX | Supplier | Launch capacityProgress unconfirmed · Disclosure Falcon 9 launch service used for the ten Tranche 1 satellites. History & full recordLaunch completed on January 11, 2026. Buyer: Not disclosed. Associated organization: Kepler Communications. Project profile: Kepler Tranche 1 Evidence checked 26 Sept 2026. | Role confirmedSource ↗ |
| Kepler Tranche 2Associated organization: Kepler Communications | SpaceX | Supplier | Launch capacityProgress unconfirmed · Disclosure SpaceX Falcon 9 is the named launch vehicle for the planned mid-2028 Motus Via Sol mission carrying ten Kepler Tranche 2 satellites History & full recordCapacity was secured through Maverick for this shared mission. No separate direct Kepler-SpaceX contract or value is disclosed. Distinct from the January2026 Tranche 1 launch. Buyer: Not disclosed. Associated organization: Kepler Communications. Project profile: Kepler Tranche 2 Evidence checked 1 Nov 2026. | Capacity reservedSource ↗ |
| Loft YAM Orbital Computing PlatformBuyer: Loft Orbital | SpaceX | Supplier | Launch capacityProgress unconfirmed · Disclosure YAM-9 deployment on the Transporter-15 rideshare mission on November 28, 2025. History & full recordLoft reports successful contact and commissioning in its November 28 update. Buyer: Loft Orbital. Project profile: Loft YAM Orbital Computing Platform Evidence checked 10 Nov 2026. | Role confirmedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.