SignalSpore

SPACE DATA CENTERS
SUPPLIER INTELLIGENCE

SPACE COMPUTINGOrbital and lunar data centers
PROJECT COMPARISON

Space Data Centers Database

Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.

Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.

67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.

Which space data center projects have launched?

PROJECTS & RELATIONSHIPS

Compare the work behind each project.

Market & supply chainFinancingSuppliers
68 projects matching53 with supplier records15 no supplier record
Relationship filters

1–25 of 68 projects shown

Technical specifications and an inline supplier and relationship preview for each project. Expand relationship details without leaving the table.
Project / developerIntended useDevelopment statusConfiguration / scopeCompute / hardwareIT electrical power
AstroForge Solo flight testsAstroForge · United StatesLatest development 24 Nov 2026 ↗
Manual review with evidence gaps 27 Nov 2026

Stage detail: Two flight tests planned

AstroForge plans to test Solo in two modes. Stoke targets early 2027 for Autonomy-1. AstroForge’s pages give different dates for DeepSpace-2.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Separate the two planned Solo software tests and their spacecraft configurations.DevelopmentTwo flight tests planned
Next project milestone

Stoke targets early 2027 for Autonomy-1. AstroForge’s homepage lists March 2027 for DeepSpace-2, while the detailed mission page gives an earlier 2026 target.

Solo will support NASA Goddard’s COMPASS heliophysics instrumentAutonomy-1 control testAnnounced mission design
Notes & source

Configuration: Autonomy-1 control test

The instrument is a planned part of the mission.

Evidence basis: Announced mission design

Source / observation date: .

Supporting source ↗
NVIDIA Jetson AGX Xavier Industrial avionicsDeepSpace-2 shadow testAstroForge published spacecraft design
Notes & source

Configuration: DeepSpace-2 shadow test

AstroForge names the computer for DeepSpace-2. The company does not assign it to Autonomy-1 or specify how much of it Solo would use.

Evidence basis: AstroForge published spacecraft design

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The reviewed Solo announcement and Stoke manifest do not give this specification for the two flight tests.

Suppliers & relationships

1 supplier / host · 2 relationships

  • Stoke SpaceSupplierCategory not recorded

    Role confirmed

    In developmentReported

    The first stage reached Cape Canaveral. Stoke plans site tests and further integration before launch.

  • NASAResearch participant

    Partnership

    PlannedReported

    The flight manifest names COMPASS on AstroForge’s spacecraft. Its flight is planned.

Show relationship details & sourcesHide relationship details for AstroForge Solo flight tests
  • NASAResearch participant

    Partnership

    PlannedReported

    The flight manifest names COMPASS on AstroForge’s spacecraft. Its flight is planned.

    Original disclosure: Autonomy-1 plans to carry and support NASA Goddard’s COMPASS heliophysics instrument during the Solo test.

    Original announcement ↗

    Associated organization: AstroForge

    Source ↗
  • Stoke SpaceSupplierCategory not recorded

    Role confirmed

    In developmentReported

    The first stage reached Cape Canaveral. Stoke plans site tests and further integration before launch.

    Original disclosure: Stoke Space plans to carry AstroForge’s Autonomy-1 spacecraft on the first flight of Nova Pathfinder.

    Original announcement ↗

    Associated organization: AstroForge

    Source ↗
Open relationship research →
BepiColombo BELA onboard processingESA, University of Bern, and DLR · EuropeLatest development 23 Nov 2026 ↗
Manual review 26 Nov 2026

Stage detail: In Mercury orbit, science operations planned

DLR confirmed the September laser checkout. ESA confirmed Mercury orbit on November 21 and plans to start science operations in April 2027.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Times and processes laser pulses and prepares ranging data for the Mercury Planetary Orbiter.LaunchedIn Mercury orbit, science operations planned
Next project milestone

ESA plans to separate its Mercury Planetary Orbiter from JAXA’s Mio on December 9 (December 10 in Japan).

First laser firing and instrument checkout completed in flightBELA laser altimeterDLR reported completed flight checkout
Notes & source

Configuration: BELA laser altimeter

DLR reported the first laser firings on September 14 after the transfer module separated.

Evidence basis: DLR reported completed flight checkout

Source / observation date: .

Supporting source ↗
LEON-2 radiation-tolerant processorBELA digital processing moduleInstrument team’s undated hardware description
Notes & source

Configuration: BELA digital processing module

Controls instrument operation, prepares telemetry packets, and collects receiver data. Main and spare digital processing boards are cold redundant.

Evidence basis: Instrument team’s undated hardware description

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
Actel RTAX2000S FPGABELA range finder modulePublished BELA instrument specification
Notes & source

Configuration: BELA range finder module

The range finder uses this FPGA to detect laser pulse returns in digitized data. The published design has one non-redundant range finder.

Evidence basis: Published BELA instrument specification

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The reviewed sources do not break out the digital computer’s electrical demand.

Suppliers & relationships

6 suppliers / hosts · 12 relationships

  • Role confirmed · Processors / accelerators

    LaunchedReported

    Frontgrade says its processor supported BELA during BepiColombo’s cruise. The instrument team identifies the flight processor as a LEON-2.

  • German Aerospace Center (DLR)Consortium participant

    Partnership

    DemonstratedReported

    DLR reported that the instrument processed commands and sent telemetry during the first laser checkout on September 14, 2026.

Show all 12 relationships & detailsHide relationship details for BepiColombo BELA onboard processingOpen relationship research →
Nancy Grace Roman onboard computing and storageNASA · United StatesLatest development 20 Nov 2026 ↗
Manual review 28 Nov 2026

Stage detail: Launched, commissioning underway

NASA confirmed a 500 Mbps downlink test at Misasa. Roman has aligned its instruments and remains in commissioning ahead of science operations.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Mission control, instrument data handling and science-data storageLaunchedLaunched, commissioning underway
Next project milestone

First images expected in early 2027

Mission onboard computing and science-data storageDetailed configuration not available in reviewed material.
Up to 250 MHzRoman observatory flight configurationLaunched hardware specification
Notes & source

Configuration: GR740 processor clock rate in the Roman flight configuration

Processor clock rate stated by Frontgrade for the installed GR740. It is not arithmetic throughput.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
2 more configurations / specifications
Frontgrade Gaisler GR740 quad-core LEON4FT processors on Wildcat Processor CardsRoman observatory flight configurationSupplier flight configuration
Notes & source

Configuration: Roman observatory flight configuration

The GR740 supports primary and backup spacecraft command and data handling and the command and data systems for the Wide Field and Coronagraph instruments. The source does not state the installed processor count.

Evidence basis: Supplier flight configuration

Source / observation date: .

Supporting source ↗
Frontgrade Gaisler GR712RC dual-core LEON3FT processor for the Science Data RecorderRoman observatory flight configurationSupplier flight configuration
Notes & source

Configuration: Roman observatory flight configuration

The processor supports storage and management of instrument data in the recorder. NASA identifies the recorder as solid-state, while processor quantity and installed memory components are undisclosed.

Evidence basis: Supplier flight configuration

Source / observation date: .

Calculation inputs: https://science.nasa.gov/blogs/roman/2026/09/25/nasas-roman-team-confirms-ground-stations-receiving-data/. The formula and operating basis are retained above.

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The inspected Frontgrade and NASA mission pages do not give a configuration-specific numerical value for this field. This is a review finding, not universal nondisclosure.

Suppliers & relationships

2 suppliers / hosts · 4 relationships

  • Frontgrade GaislerSupplierCategory not recorded

    Role confirmed

    Progress unconfirmed · Disclosure

    GR740 processors support primary and backup spacecraft command and data handling plus instrument command and data handling. A GR712RC…

  • Partnership

    DemonstratedReported

    NASA confirmed that ESA’s station passed its September 17 checks, including the highest rate tested.

Show all 4 relationships & detailsHide relationship details for Nancy Grace Roman onboard computing and storage
  • Frontgrade GaislerSupplierCategory not recorded

    Role confirmed

    Progress unconfirmed · Disclosure

    GR740 processors support primary and backup spacecraft command and data handling plus instrument command and data handling. A GR712RC supports the Science Data Recorder.

    Supplier announcement published after launch. Installed processor quantities are not disclosed.

    Buyer: NASA

    Source ↗
  • Frontgrade TechnologiesSupplierCategory not recorded

    Role confirmed

    Progress unconfirmed · Disclosure

    Radiation-hardened logic gates, transceivers and voltage supervisors support Roman communications, power management and control functions.

    The announcement names component types but does not disclose quantities or every product identifier.

    Buyer: NASA

    Source ↗
  • Partnership

    DemonstratedReported

    NASA confirmed that ESA’s station passed its September 17 checks, including the highest rate tested.

    Original disclosure: ESA provides Roman with its New Norcia station in Western Australia to receive science data.

    Associated organization: NASA

    Source ↗
  • Partnership

    DemonstratedReported

    NASA confirmed the September 7 test reached 500 Mbps at JAXA’s Misasa station.

    Original disclosure: JAXA provides Roman with its Misasa ground station in Japan, where NASA confirmed a 500 Mbps downlink test.

    Associated organization: NASA

    Source ↗
Open relationship research →
Planetek Hellas OPTISATPlanetek Hellas · GreeceLatest development 20 Nov 2026 ↗
Manual review 23 Nov 2026

Stage detail: Launched experimental mission

The European Commission records OPTISAT’s July 28 final acceptance review and identifies the satellite’s onboard processing unit. Published in-orbit performance results are still unavailable.

Last full profile review: 15 Oct 2026.

Sources collected: 23 Oct 2026.

Source collection and substantive profile review are separate checks.

Earth observation and onboard image processingLaunchedLaunched experimental mission
Next project milestone

Await OPTISAT commissioning and measured SCOT20/onboard-processing results from Planetek Hellas, ESA or TESAT. No dated next milestone disclosed.

6 UOPTISAT / SCOT20 designLaunched hardware specification
Notes & source

Configuration: OPTISAT spacecraft form factor

Operator-reported launched spacecraft configuration. No commissioning result inferred.

Evidence basis: Launched hardware specification

Source / observation date: .

Supporting source ↗
Onboard data processing unitOPTISAT / SCOT20 designOfficial agency configuration report
Notes & source

Configuration: OPTISAT satellite

The European Commission lists an onboard data processing unit and two main payload software packages for data processing and secure communications. The assessment gives no processor model or measured processing performance.

Evidence basis: Official agency configuration report

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

Inspected operator launch and ESA mission accounts do not establish an IT-only electrical load. An optical-terminal model does not establish a compute processor specification.

Suppliers & relationships

7 suppliers / hosts · 10 relationships

  • Role confirmed · Optical links

    Progress unconfirmed · Disclosure

    First SCOT20 optical-terminal flight model delivered and accepted for OPTISAT.

  • BitRezusStrategic partner

    Partnership

    Progress unconfirmed

    Named Greek collaboration on OPTISAT. The group works to integrate cybersecurity, blockchain and AI-based technologies.

Show all 10 relationships & detailsHide relationship details for Planetek Hellas OPTISAT
  • Role confirmed · Optical links

    Progress unconfirmed · Disclosure

    First SCOT20 optical-terminal flight model delivered and accepted for OPTISAT.

    October 6, 2025 is the TESAT announcement date. ESA’s February 13, 2026 account dates delivery, acceptance and integration to August 2025. Procurement price, direct buyer and measured in-orbit throughput remain undisclosed. ESA source: https://resilience.esa.int/archives/news/greeces-advanced-laser-satellite-communications-test-campaign-to-launch-with-esa-support

    Associated organization: Planetek Hellas

    Source ↗
  • BitRezusStrategic partner

    Partnership

    Progress unconfirmed

    Named Greek collaboration on OPTISAT. The group works to integrate cybersecurity, blockchain and AI-based technologies.

    The release identifies participation and a collective integration aim. It does not allocate a specific technology to this partner or establish a procurement order, contract value or flight-demonstrated result. March 30 is the launch event date, not a verified collaboration announcement date.

    Associated organization: Planetek Hellas

  • Role confirmed · Launch integration

    Progress unconfirmed

    D-Orbit is a named European supplier supporting OPTISAT.

    The official mission accounts name this supplier but do not assign its individual work package or disclose procurement terms. TESAT corroboration: https://www.tesat.de/news/press/1030-tesat-delivers-first-scot20-oct-to-planetek-hellas-for-greece-national-satellite-program

    Associated organization: Planetek Hellas

  • Role confirmed · Satellite bus

    Progress unconfirmed

    EnduroSat is a named European supplier supporting OPTISAT.

    The official mission accounts name this supplier but do not assign its individual work package or disclose procurement terms. TESAT corroboration: https://www.tesat.de/news/press/1030-tesat-delivers-first-scot20-oct-to-planetek-hellas-for-greece-national-satellite-program

    Associated organization: Planetek Hellas

  • JNP Consultancy ServicesStrategic partner

    Partnership

    Progress unconfirmed

    Named Greek collaboration on OPTISAT. The group works to integrate cybersecurity, blockchain and AI-based technologies.

    The release identifies participation and a collective integration aim. It does not allocate a specific technology to this partner or establish a procurement order, contract value or flight-demonstrated result. March 30 is the launch event date, not a verified collaboration announcement date.

    Associated organization: Planetek Hellas

  • Contract / order disclosed · Satellite bus · Payload integration · Mission operations

    Progress unconfirmed

    ESA-contracted OPTISAT experimental satellite mission implemented by Planetek Hellas.

    March 30 is launch event date, not verified publication date. Contract signing date, number and value undisclosed. EU recovery funding is not the procurement buyer.

    Buyer: European Space Agency (ESA)

  • Role confirmed · Flight / payload software

    Progress unconfirmed

    Planetek Italia is a named European supplier supporting OPTISAT.

    The official mission accounts name this supplier but do not assign its individual work package or disclose procurement terms. TESAT corroboration: https://www.tesat.de/news/press/1030-tesat-delivers-first-scot20-oct-to-planetek-hellas-for-greece-national-satellite-program

    Associated organization: Planetek Hellas

  • Role confirmed · Avionics / integrated electronics

    Progress unconfirmed

    SkyLabs is a named European supplier supporting OPTISAT.

    The official mission accounts name this supplier but do not assign its individual work package or disclose procurement terms. TESAT corroboration: https://www.tesat.de/news/press/1030-tesat-delivers-first-scot20-oct-to-planetek-hellas-for-greece-national-satellite-program

    Associated organization: Planetek Hellas

  • SpaceXSupplierLaunch

    Role confirmed · Launch capacity

    Progress unconfirmed

    Falcon 9 Transporter-16 launch of OPTISAT on March 30, 2026.

    Launch event is dated. Publication day, direct procurement buyer and price are not established.

    Associated organization: Planetek Hellas

  • Partnership

    Progress unconfirmed

    Named Greek collaboration on OPTISAT. The group works to integrate cybersecurity, blockchain and AI-based technologies.

    The release identifies participation and a collective integration aim. It does not allocate a specific technology to this partner or establish a procurement order, contract value or flight-demonstrated result. March 30 is the launch event date, not a verified collaboration announcement date.

    Associated organization: Planetek Hellas

Open relationship research →
Lodestar Mithril flight avionicsLodestar Space · United StatesLatest development 19 Nov 2026 ↗
Manual review 22 Nov 2026

Stage detail: System-level radiation testing completed

Compared Lodestar's system-level radiation-test account. The complete avionics payload finished total-ionising-dose testing, while processor details, numerical results and a flight mission remain undisclosed.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Run Mithril autonomy software on spacecraft using a GPU-accelerated flight computerDevelopmentSystem-level radiation testing completed
Next project milestone

Complete single-event-effects testing and publish a flight mission or radiation-characterization result.

Compute module with power, memory and interface electronics tested as a complete avionics payloadMithril GPU flight avionicsOfficial developer test boundary
Notes & source

Configuration: Mithril GPU flight avionics

System-level boundary stated by Lodestar. No component count or capacity is disclosed.

Evidence basis: Official developer test boundary

Source / observation date: .

Supporting source ↗
NVIDIA edge AI in a ruggedized hybrid hardware and software architectureMithril GPU flight avionicsOfficial developer system description
Notes & source

Configuration: Mithril GPU flight avionics

The release does not identify the NVIDIA processor model or installed configuration.

Evidence basis: Official developer system description

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The reviewed release does not report an IT electrical load.

Suppliers & relationships

1 relationship

  • Coros SpaceResearch participant

    Partnership

    Work completedReported

    Coros Space supported a completed system-level total-ionising-dose test campaign for Lodestar's Mithril GPU flight avionics. Lodestar says…

Show relationship details & sourcesHide relationship details for Lodestar Mithril flight avionics
  • Coros SpaceResearch participant

    Partnership

    Work completedReported

    Coros Space supported a completed system-level total-ionising-dose test campaign for Lodestar's Mithril GPU flight avionics. Lodestar says single-event-effects testing is the next phase.

    Original disclosure: Coros Space supported system-level total-ionising-dose radiation testing of Lodestar's GPU-accelerated Mithril flight avionics at the Centro Nacional de Aceleradores

    The release reports completion of total-ionising-dose testing. It does not state a contract value, tested dose, GPU model or flight mission. Single-event-effects testing remains planned.

    Buyer: Lodestar Space

    Source ↗
Open relationship research →
Zhongbei Daxue-1 / Taihang demonstratorNorth University of China · ChinaLatest development 19 Nov 2026 ↗
Manual review 23 Nov 2026

Stage detail: Launched, initial data returned

The satellite completed its first week of imaging tests, collecting 1.85 GB of usable data across 20 imaging batches.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Onboard processing for the satellite’s own observationsLaunchedLaunched, initial data returned
Next project milestone

Complete in-orbit calibration, imaging tests and algorithm updates.

Experimental onboard AI-processing satelliteDetailed configuration not available in reviewed material.
University-developed space AI-processing platformzhongbei1Mission / carrier account
Notes & source

Configuration: zhongbei1

The mission account identifies its function without naming a processor or accelerator model.

Evidence basis: Mission / carrier account

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
Dual optical imaging systems for still imagery and videozhongbei1Mission / carrier account
Notes & source

Configuration: zhongbei1

Mission-specific imaging configuration. No aperture, resolution or frame rate is stated.

Evidence basis: Mission / carrier account

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

No mission-specific specification for this field in the inspected university and launch-provider accounts.

Suppliers & relationships

2 suppliers / hosts · 4 relationships

Show all 4 relationships & detailsHide relationship details for Zhongbei Daxue-1 / Taihang demonstrator
  • Partnership · Mission operations

    In operationReported

    Geovis Insighter Technology reported providing tracking and control services for Zhongbei Daxue-1 and Xingyan-01, as well as launch data support for Ceres-2 Y3.

    Original disclosure: Geovis Insighter Technology reports tracking and control services for Zhongbei Daxue-1 and Xingyan-01, alongside launch data support for the Ceres-2 Y3 mission.

    Named mission support role. Contract value and purchasing party are not disclosed.

    Associated organization: Galactic Energy (星河动力)

    Source ↗
  • Role confirmed · Launch capacity

    Work completedReported

    Galactic Energy launched Zhongbei Daxue-1 from Jiuquan on November 7, 2026.

    Original disclosure: Ceres-2 Y3 launch of Zhongbei Daxue-1 from Jiuquan on November 7, 2026.

    The launch provider confirms the flight. Direct purchasing chain and launch price are undisclosed.

    Associated organization: North University of China (中北大学)

    Source ↗
  • Partnership

    Progress unconfirmed · Disclosure

    Participant in the December 2024 joint planning of the university constellation and its Zhongbei Daxue-1 demonstrator.

    The meeting occurred December 7 and was published December 11. This is a historical program-planning role, with no specific work package assigned for the satellite launched in November 2026.

    Associated organization: North University of China (中北大学)

    Source ↗
  • Orienspace (东方空间)Strategic partner

    Partnership

    Progress unconfirmed · Disclosure

    Participant in the December 2024 joint planning of the university constellation and its Zhongbei Daxue-1 demonstrator.

    The meeting occurred December 7 and was published December 11. This is a historical program-planning role, with no specific work package assigned for the satellite launched in November 2026.

    Associated organization: North University of China (中北大学)

    Source ↗
Open relationship research →
EMISAR and OrbFIXInstitute of Space Science / Romanian InSpace Engineering · RomaniaLatest development 18 Nov 2026 ↗
Manual review 24 Nov 2026

Stage detail: Demonstrated in orbit

The mission team reports that EMISAR forwarded a message between two ground stations and that OrbFIX calculated the satellite’s position onboard.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Store and forward messages and validate onboard navigation on the EMISAR CubeSat.DemonstratedDemonstrated in orbit
Next project milestone

Romanian InSpace Engineering plans to fly versions of OrbFIX on other missions.

Satellite message storage and onboard navigation demonstrationDetailed configuration not available in reviewed material.
Frontgrade Gaisler radiation-hardened microcontrollerOrbFIX receiver flown on EMISARSupplier report on flown hardware
Notes & source

Configuration: OrbFIX receiver flown on EMISAR

Frontgrade identifies the component and its role in spacecraft interfaces, power management and onboard processing. It does not identify the model.

Evidence basis: Supplier report on flown hardware

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

No IT load was disclosed.

Suppliers & relationships

5 suppliers / hosts · 10 relationships

  • Partnership · Processors / accelerators

    DemonstratedReported

    The microcontroller supported onboard processing in the OrbFIX receiver that determined EMISAR’s position in orbit.

  • Constanta Maritime UniversityConsortium participant

    Partnership

    DemonstratedReported

    The Constanța ground station received a message that EMISAR stored and forwarded from Măgurele.

Show all 10 relationships & detailsHide relationship details for EMISAR and OrbFIXOpen relationship research →
NaviCode CaravelNaviGate · ItalyLatest development 18 Nov 2026 ↗
Manual review 24 Nov 2026

Stage detail: Reported in-orbit demonstration

NaviGate and KP Labs ran Caravel on a Leopard computer during a ground test. The earlier ION flight used a separate computer.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Autonomous onboard orbit determination from GNSS measurementsDemonstratedReported in-orbit demonstration
Next project milestone

Pilot deployments with operators and integrators are being discussed. No dated next deployment is disclosed.

Software-only C/C++ module with no external library dependenciesNaviCode Caravel software on IONOperator-reported demonstration
Notes & source

Configuration: NaviCode Caravel software on ION

Product implementation description. Future multi-sensor and autonomous-maneuver roadmap features are separate from this demonstration.

Evidence basis: Operator-reported demonstration

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
C/C++ software portable to POSIX-based flight architecturescaravel-productConfiguration description
Notes & source

Configuration: caravel-product

Product portability claim. Does not identify the ION host operating system.

Evidence basis: Configuration description

Source / observation date: .

Supporting source ↗
Existing ION onboard computer and GNSS receiver, with no added hardwareNaviCode Caravel software on IONOperator-reported demonstration
Notes & source

Configuration: NaviCode Caravel software on ION

No processor model, installed memory or dedicated IT load is disclosed.

Evidence basis: Operator-reported demonstration

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
NaviCode Caravel ran on KP Labs Leopard DPUNaviCode Caravel on the Leopard test unitReported public ground demonstration
Notes & source

Configuration: NaviCode Caravel on the Leopard test unit

KP Labs and NaviGate ran the navigation software remotely on the Smart Mission Lab ground test unit. D-Orbit’s prior flight used the ION onboard computer.

Evidence basis: Reported public ground demonstration

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

No installed mission-specific numerical specification was found in the demonstration or product material reviewed.

Suppliers & relationships

1 supplier / host · 3 relationships

  • Role confirmed · Payload integration

    Progress unconfirmed · Disclosure

    Hosted execution of NaviCode Caravel through D-Orbit's Software In-Orbit Demonstration service on an existing ION onboard computer.

  • KP LabsResearch participant

    Partnership

    DemonstratedReported

    During the November 18 ground demonstration, the Caravel software ran on a remotely connected KP Labs Leopard computer.

Show all 3 relationships & detailsHide relationship details for NaviCode Caravel
  • KP LabsResearch participant

    Partnership

    DemonstratedReported

    During the November 18 ground demonstration, the Caravel software ran on a remotely connected KP Labs Leopard computer.

    Original disclosure: NaviGate and KP Labs ran NaviCode Caravel on a Leopard computer through the Smart Mission Lab during a ground demonstration.

    Buyer: NaviGate S.r.l.

    Source ↗
  • Role confirmed · Payload integration

    Progress unconfirmed · Disclosure

    Hosted execution of NaviCode Caravel through D-Orbit's Software In-Orbit Demonstration service on an existing ION onboard computer.

    Demonstrated hosting role. Specific ION flight, legal purchasing entity and price are undisclosed. No additional spacecraft is counted.

    Associated organization: NaviGate S.r.l.

    Source ↗
  • Partnership

    Progress unconfirmed · Disclosure

    CASSINI Challenges 2026 award for NaviCode Caravel.

    Non-equity prize support. Issuer dates award to June 2026, while this supporting incubator release is July 13. No supplier procurement is established.

    Associated organization: NaviGate S.r.l.

    Source ↗
Open relationship research →
PLATO onboard data processingEuropean Space Agency and PLATO Mission Consortium · EuropeLatest development 18 Nov 2026 ↗
Manual review 24 Nov 2026

Stage detail: In development, ground tests complete

ESA plans to launch PLATO in April 2027. The onboard computers will turn camera images into measurements of starlight before sending data to Earth.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Process the telescope’s measurements of starlight aboard the spacecraft before returning results to Earth.DevelopmentIn development, ground tests complete
Next project milestone

ESA plans to launch PLATO on Ariane 6 in April 2027.

Onboard science data processingDetailed configuration not available in reviewed material.
50 MHzPLATO normal-camera processing unitPlanned specification
Notes & source

Configuration: Normal-camera GR712RC processor clock

The workshop presentation names this clock for the dual-core design.

Evidence basis: Planned specification

Source / observation date: .

Supporting source ↗
4 more configurations / specifications
12 unitsPLATO science data processing systemPlanned specification
Notes & source

Configuration: Normal-camera processing units

Each unit processes two of the 24 normal cameras.

Evidence basis: Planned specification

Source / observation date: .

Supporting source ↗
Frontgrade Gaisler GR712RC dual-core LEON3FTPLATO normal-camera processing unitDocumented design before launch
Notes & source

Configuration: PLATO normal-camera processing unit

Each standard unit works with two cameras.

Evidence basis: Documented design before launch

Source / observation date: .

Supporting source ↗
Single-core MDPA LEON2 with an FPGAPLATO fast-camera processing unitDocumented design before launch
Notes & source

Configuration: PLATO fast-camera processing unit

Two fast-camera units handle imaging and fine guidance.

Evidence basis: Documented design before launch

Source / observation date: .

Supporting source ↗
UT700 LEON3 and a compression FPGAPLATO instrument control unitDocumented design before launch
Notes & source

Configuration: PLATO instrument control unit

The controller manages the camera units and further compresses their results. A backup unit stays off unless needed.

Evidence basis: Documented design before launch

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

Current power draw of the science computers was not stated in the sources reviewed.

Suppliers & relationships

4 suppliers / hosts · 6 relationships

  • Frontgrade GaislerSupplierCategory not recorded

    Partnership

    Delivered / integratedReported

    Frontgrade Gaisler identifies its processors and SpaceWire routers in the onboard design.

  • German Aerospace Center (DLR)Research participant

    Partnership

    Delivered / integratedReport date unconfirmed

    DLR reports completing work on the fast camera electronics and testing the data processing system.

Show all 6 relationships & detailsHide relationship details for PLATO onboard data processing
  • Frontgrade GaislerSupplierCategory not recorded

    Partnership

    Delivered / integratedReported

    Frontgrade Gaisler identifies its processors and SpaceWire routers in the onboard design.

    Original disclosure: Frontgrade Gaisler provides processors for 12 normal-camera computers and the routers that connect the processing units to the spacecraft.

    Buyer: European Space Agency (ESA)

    Source ↗
  • Beyond GravitySupplierCategory not recorded

    Partnership

    Delivered / integratedReported

    ESA lists Beyond Gravity in the team that built the spacecraft.

    Original disclosure: Beyond Gravity helped OHB build and assemble the PLATO spacecraft.

    Buyer: European Space Agency (ESA)

    Source ↗
  • Thales Alenia SpaceSupplierCategory not recorded

    Partnership

    Delivered / integratedReported

    ESA lists Thales Alenia Space in the team that built the spacecraft.

    Original disclosure: Thales Alenia Space helped OHB build and assemble the PLATO spacecraft.

    Buyer: European Space Agency (ESA)

    Source ↗
  • German Aerospace Center (DLR)Research participant

    Partnership

    Delivered / integratedReport date unconfirmed

    DLR reports completing work on the fast camera electronics and testing the data processing system.

    Original disclosure: DLR’s Institute of Space Research developed and tested the onboard data processing system and built the electronics for the two fast cameras.

    Buyer: European Space Agency (ESA)

  • OHBSupplierCategory not recorded

    Partnership

    Delivered / integratedReport date unconfirmed

    DLR reports that OHB installed the flight cameras on the spacecraft.

    Original disclosure: As spacecraft prime contractor, OHB integrated the 26 flight cameras on PLATO’s optical bench.

    Buyer: European Space Agency (ESA)

  • PLATO Mission ConsortiumResearch participant

    Partnership

    In developmentReport date unconfirmed

    ESA and the consortium completed and tested the flight-model cameras.

    Original disclosure: The PLATO Mission Consortium develops the science payload with ESA, including the camera and processing electronics.

    Buyer: European Space Agency (ESA)

Open relationship research →
Simera Sense and partners’ onboard imaging offerSimera Sense / Spacemanic / Zaitra / World from Space · Belgium / CzechiaLatest development 18 Nov 2026 ↗
Manual review 28 Nov 2026

Stage detail: Development agreement signed

Zaitra and Simera Sense tested a SKAIDOCK computer and an xScape electrical model in the lab. The four-company mission offer is still in development.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Simera Sense, Spacemanic, Zaitra and World from Space agreed to offer missions that process and compress satellite images before sending them to Earth. Simera Sense will provide the camera, Spacemanic the satellite platform, Zaitra the onboard computer and software, and World from Space the ground processing tools.DevelopmentDevelopment agreement signed
Next project milestone

Package the camera, satellite and software for future customer missions.

Spacemanic CORVUS platform and SPACECANNON deployerProposed four-company Earth observation mission packagePlanned contribution under the November 18 agreement
Notes & source

Configuration: Proposed four-company Earth observation mission package

Spacemanic would tailor its platform around the camera and provide the deployment hardware.

Evidence basis: Planned contribution under the November 18 agreement

Source / observation date: .

Supporting source ↗
Zaitra SKAIDOCK onboard computerProposed four-company Earth observation mission packagePlanned contribution under the November 18 agreement
Notes & source

Configuration: Proposed four-company Earth observation mission package

The agreement identifies the computer family. It does not identify the processor, configuration, storage or power of the proposed unit.

Evidence basis: Planned contribution under the November 18 agreement

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
Xiphos Q8J module with an AMD Zynq UltraScale+ reference FPGASKAIDOCK and xScape lab testJoint engineering report: measured or specified for the lab setup
Notes & source

Configuration: SKAIDOCK and xScape lab test

The report names the Q8J on SKAIDOCK and a ZU7EG as the FPGA used for the resource figures. It also lists Zynq 7000 as a supported alternative.

Evidence basis: Joint engineering report: measured or specified for the lab setup

Source / observation date: .

Supporting source ↗
About 4.7 W idleSKAIDOCK and xScape lab test

The report gives approximately 4.7 W for the SKAIDOCK computer at idle. The camera sensor was absent from the electrical model.

Joint engineering report: measured or specified for the lab setup
Notes & source

Configuration: SKAIDOCK and xScape lab test

The report gives approximately 4.7 W for the SKAIDOCK computer at idle. The camera sensor was absent from the electrical model.

Evidence basis: Joint engineering report: measured or specified for the lab setup

Source / observation date: .

Supporting source ↗
Up to 0.5 W increase during readoutSKAIDOCK and xScape lab test

The report gives up to 0.5 W of additional active read power when writing to eMMC.

Joint engineering report: measured or specified for the lab setup
Notes & source

Configuration: SKAIDOCK and xScape lab test

The report gives up to 0.5 W of additional active read power when writing to eMMC.

Evidence basis: Joint engineering report: measured or specified for the lab setup

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
0.06 W static for the readout blockSKAIDOCK and xScape lab test

Reported static power for the FPGA readout block, separate from the computer's idle power figure.

Joint engineering report: measured or specified for the lab setup
Notes & source

Configuration: SKAIDOCK and xScape lab test

Reported static power for the FPGA readout block, separate from the computer's idle power figure.

Evidence basis: Joint engineering report: measured or specified for the lab setup

Source / observation date: .

Supporting source ↗
Suppliers & relationships

4 suppliers / hosts · 5 relationships

  • Simera SenseSupplierCategory not recorded

    Preliminary agreement

    PlannedReported

    Simera Sense named the xScape200 camera in the November agreement.

  • Zaitra s.r.o.Research participant

    Partnership

    DemonstratedReported

    Zaitra and Simera Sense tested a SKAIDOCK computer with the electrical model of an xScape imager in the lab.

Show all 5 relationships & detailsHide relationship details for Simera Sense and partners’ onboard imaging offer
  • Simera SenseSupplierCategory not recorded

    Preliminary agreement

    PlannedReported

    Simera Sense named the xScape200 camera in the November agreement.

    Original disclosure: Simera Sense plans to provide the xScape200 camera for the four-company Earth observation offer.

    Associated organization: Spacemanic

    Source ↗
  • SpacemanicSupplierCategory not recorded

    Preliminary agreement

    PlannedReported

    Spacemanic plans to tailor its platform around the xScape200 camera.

    Original disclosure: Spacemanic plans to provide its CORVUS satellite platform and SPACECANNON deployer for the proposed imaging missions.

    Associated organization: Simera Sense

    Source ↗
  • World from Space, s.r.o.SupplierCategory not recorded

    Preliminary agreement

    PlannedReported

    The November agreement assigns calibration and image quality checks to World from Space.

    Original disclosure: World from Space plans to process the downlinked images and supply its ORBIS tools for tasking and distributing data.

    Associated organization: Simera Sense

    Source ↗
  • Zaitra s.r.o.Category not recorded
    Supplier

    Preliminary agreement

    PlannedReported

    The November agreement names Zaitra’s onboard equipment and software.

    Original disclosure: Zaitra plans to provide its SKAIDOCK computer with SKAISEN image analysis and SKAIPACK compression.

    Associated organization: Simera Sense

    Source ↗
    Research participant

    Partnership

    DemonstratedReported

    Zaitra and Simera Sense tested a SKAIDOCK computer with the electrical model of an xScape imager in the lab.

    Original disclosure: Zaitra and Simera Sense tested a SKAIDOCK computer with the electrical model of an xScape imager in the lab.

    Associated organization: Simera Sense

    Source ↗
Open relationship research →
Bifrost onboard image processingSpace Inventor · Denmark / SwedenLatest development 17 Nov 2026 ↗
Manual review 24 Nov 2026

Stage detail: Onboard processing tests extended

Space Inventor reported commissioning complete in September 2025. The Danish and Swedish defence equipment agencies extended Bifrost’s onboard processing tests in November 2026.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Bifrost tests onboard processing of images collected by its own instruments.OperatingOnboard processing tests extended
Next project milestone

Continue testing onboard image processing and sending results to Earth.

Space Inventor micro-8 spacecraft platformBifrost spacecraftOfficial mission description
Notes & source

Configuration: Bifrost spacecraft

Space Inventor identifies the platform in its commissioning report.

Evidence basis: Official mission description

Source / observation date: .

Supporting source ↗
Unibap iX5-105 onboard computerBifrost spacecraftOfficial mission description
Notes & source

Configuration: Bifrost spacecraft

Unibap identifies the computer model on the Bifrost mission page.

Evidence basis: Official mission description

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The reviewed mission sources do not give a number for this field.

Suppliers & relationships

4 suppliers / hosts · 8 relationships

Show all 8 relationships & detailsHide relationship details for Bifrost onboard image processingOpen relationship research →
Qascom COLLINS lunar navigation receiverQascom and Italian Space Agency · ItalyLatest development 17 Nov 2026 ↗
Manual review 23 Nov 2026

Stage detail: Lunar flight planned

The planned lunar test will combine Earth satellite navigation signals with signals designed for the Moon. Firefly targets launch from 2028 at the earliest.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Test how one receiver can combine navigation signals from Earth and from future lunar networks.DevelopmentLunar flight planned
Next project milestone

Launch with Blue Ghost Mission 3 from 2028 at the earliest.

Lunar navigation computingDetailed configuration not available in reviewed material.
Combined navigation receiver descriptionQascom COLLINS lunar navigation receiverItalian Space Agency development contract
Notes & source

Configuration: Qascom COLLINS lunar navigation receiver

Qascom’s receiver is designed to use GPS and Galileo together with future LunaNet navigation signals, including ESA Moonlight.

Evidence basis: Italian Space Agency development contract

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The two announcements do not give a receiver power rating.

Suppliers & relationships

1 supplier / host · 2 relationships

  • Firefly AerospaceHostCategory not recorded

    Contract / order disclosed

    Progress unconfirmed · Disclosure

    Firefly will host the COLLINS receiver on its Elytra Dark orbiter during Blue Ghost Mission 3. The planned test runs for six months, with an…

  • Agenzia Spaziale italiana (ASI)Programme funding contributor

    Contract awarded

    Progress unconfirmed · Disclosure

    The Italian Space Agency signed a contract with Qascom to develop the COLLINS lunar navigation receiver. The agency and Qascom will share…

Show relationship details & sourcesHide relationship details for Qascom COLLINS lunar navigation receiver
  • Firefly AerospaceHostCategory not recorded

    Contract / order disclosed

    Progress unconfirmed · Disclosure

    Firefly will host the COLLINS receiver on its Elytra Dark orbiter during Blue Ghost Mission 3. The planned test runs for six months, with an option to extend.

    Buyer: Qascom

    Source ↗
  • Agenzia Spaziale italiana (ASI)Programme funding contributor

    Contract awarded

    Progress unconfirmed · Disclosure

    The Italian Space Agency signed a contract with Qascom to develop the COLLINS lunar navigation receiver. The agency and Qascom will share project costs.

    Buyer: Qascom

    Source ↗
Open relationship research →
Vyoma Flamingo Hosted Payloads (FlaHOPs)Vyoma and Scanway · Germany and PolandLatest development 17 Nov 2026 ↗
Manual review 20 Nov 2026

Stage detail: Hosted deployment planned for 2028

Vyoma and Scanway now disclose a minimum of 14 FlaHOP telescope flight models for delivery by the end of December 2027 across ten planned Kepler hosts. The processor, memory, power, optical resolution and processing rate remain undisclosed.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Onboard processing of space surveillance imagesDevelopmentHosted deployment planned for 2028
Next project milestone

Deploy FlaHOPs no earlier than October 2028, with catalogue service planned for early 2029.

Hosting across ten Kepler Tranche 2 satellites allocationFlaHOPs on planned Kepler Tranche 2 hostsAnnounced design or research specification
Notes & source

Configuration: FlaHOPs on planned Kepler Tranche 2 hosts

Host spacecraft rather than a sensor count. Release links the dedicated Neutron launch. No total is added to the separate Motus Via Sol allocation.

Evidence basis: Announced design or research specification

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
Two FlaHOPs on one Kepler satellite under HydRON Element 3 allocationSeparate HydRON Element 3 FlaHOP hosting planAnnounced design or research specification
Notes & source

Configuration: Separate HydRON Element 3 FlaHOP hosting plan

Earlier cooperation described in the November release. Separate from the ten-host plan and Vyoma's dedicated Flamingo spacecraft.

Evidence basis: Announced design or research specification

Source / observation date: .

Supporting source ↗
Vyoma Payload On-Board Computer for instrument control, image processing, compression and encryption architectureFlaHOPs on planned Kepler Tranche 2 hostsAnnounced design or research specification
Notes & source

Configuration: FlaHOPs on planned Kepler Tranche 2 hosts

Processes the instrument's own images before downlink. Processor model and performance are not disclosed.

Evidence basis: Announced design or research specification

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The reviewed project-specific official announcements do not give a numerical specification for this field.

Suppliers & relationships

2 suppliers / hosts · 2 relationships

  • Contract / order disclosed · Payload integration · Optical links

    PlannedReported

    Kepler plans to host Vyoma's surveillance payloads on ten Tranche 2 satellites, with a dedicated launch no earlier than October 2028.

  • Scanway S.A.SupplierCategory not recorded

    Contract / order disclosed

    In developmentReported

    Scanway and Vyoma are developing at least 14 FlaHOP telescope flight models for delivery by the end of December 2027 under a contract worth…

Show relationship details & sourcesHide relationship details for Vyoma Flamingo Hosted Payloads (FlaHOPs)
  • Contract / order disclosed · Payload integration · Optical links

    PlannedReported

    Kepler plans to host Vyoma's surveillance payloads on ten Tranche 2 satellites, with a dedicated launch no earlier than October 2028.

    Original disclosure: Hosting of Vyoma FlaHOP surveillance payloads across ten Tranche 2 spacecraft, with Kepler optical data relay and a dedicated launch targeted no earlier than October 2028.

    Buyer: Vyoma

    Source ↗
  • Scanway S.A.SupplierCategory not recorded

    Contract / order disclosed

    In developmentReported

    Scanway and Vyoma are developing at least 14 FlaHOP telescope flight models for delivery by the end of December 2027 under a contract worth no less than EUR 3.7 million.

    Original disclosure: Joint development and delivery of at least 14 FlaHOP optical telescope flight models by the end of December 2027 for deployment across ten Kepler Tranche 2 satellites no earlier than October 2028

    Buyer: Vyoma

    USD 4,065,930 (EUR 3,700,000) · Minimum disclosed contract value attributable to Scanway

    Source ↗
Open relationship research →
ICEYE Gen5 onboard AIICEYE · Finland / globalLatest development 16 Nov 2026 ↗
Manual review 25 Nov 2026

Stage detail: Satellite generation announced

ICEYE has published the Gen5 imaging and downlink designs. It plans to add onboard AI features through software updates. The company has not named a Gen5 flight in these announcements.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Onboard screening, preprocessing and follow-up tasking for ICEYE radar imageryDevelopmentSatellite generation announced
Next project milestone

Release and validate the planned onboard AI applications through software updates.

Mission onboard radar-image processingDetailed configuration not available in reviewed material.
Onboard AI processor, model and count unspecifiedGen5 published designPublished satellite generation specification not demonstrated ai result
Notes & source

Configuration: ICEYE Gen5 published design

A Gen5 feature specification, without processor vendor, numerical throughput or a completed application benchmark.

Evidence basis: Published satellite generation specification not demonstrated ai result

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The inspected Gen5 release and product page do not establish a configuration-specific specification for this field.

Suppliers & relationships

No relationships recorded.

View project organizations →
Liangtian constellation / Huashi-Keda pathfinderEast China Normal University · ChinaLatest development 16 Nov 2026 ↗
Manual review 25 Nov 2026

Stage detail: Pathfinder in development

The university unveiled the Huashi-Keda pathfinder on November 15. It plans to process images aboard the satellite and build a 200-satellite constellation around 2030.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Hyperspectral observation and onboard image analysisDevelopmentPathfinder in development
Next project milestone

Launch the Huashi-Keda hyperspectral pathfinder.

200 satellitesLiangtian planned constellation

Roadmap target around 2030.

University development announcement
Notes & source

Configuration: liangtian-plan

Roadmap target around 2030.

Evidence basis: University development announcement

Source / observation date: .

Supporting source ↗
Domestic AI chips planned for later constellation satellitesLiangtian future satellitesUniversity development announcement
Notes & source

Configuration: liangtian-plan

Processor models and installed quantities are undisclosed.

Evidence basis: University development announcement

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
University-developed camera electronics and a general electronics architecture intended for later constellation missionsHuashi-Keda pathfinderOfficial planned project architecture
Notes & source

Configuration: Huashi-Keda pathfinder

The university reports camera design, manufacture and tests before launch. Processor models, counts, arithmetic throughput and installed memory are not specified.

Evidence basis: Official planned project architecture

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The November16 university account does not give a configuration-specific numerical specification for this field. The source distinguishes the unlaunched pathfinder from later constellation research.

Suppliers & relationships

2 relationships

Show relationship details & sourcesHide relationship details for Liangtian constellation / Huashi-Keda pathfinderOpen relationship research →
Tycho Space SOLAN-1Tycho Space · NorwayLatest development 14 Nov 2026 ↗
Manual review 28 Nov 2026

Stage detail: Satellite design

Tycho says it is designing SOLAN-1 and preparing its first pilots. Its first planned TychoBoB flight is on the separate CENSSAT-1 satellite.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

SOLAN-1 will process and act on its own Earth observation data for maritime monitoring.DevelopmentSatellite design
Next project milestone

Satellite design and preparation of the first customer pilots.

Onboard image processing and follow-up observationsSOLAN-1 planned satelliteIssuer development announcement
Notes & source

Configuration: SOLAN-1 planned satellite

Tycho is designing SOLAN-1 as its first satellite, initially for maritime monitoring in Nordic and Arctic waters.

Evidence basis: Issuer development announcement

Source / observation date: .

Supporting source ↗
TychoBoB onboard computerSOLAN-1 planned satelliteIssuer development announcement
Notes & source

Configuration: SOLAN-1 planned satellite

Tycho plans to use its own computer to analyze imagery and decide what to observe next. The exact flight configuration is not yet announced.

Evidence basis: Issuer development announcement

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The sources reviewed did not give a value for the planned flight configuration.

Suppliers & relationships

No relationships recorded.

View project organizations →
Juntian-1 06A / Xingyan-01Geovis Insighter Technology · ChinaLatest development 13 Nov 2026 ↗
Manual review 27 Nov 2026

Stage detail: First space-object observations reported

Geovis reported onboard processing, compression and successful downlink. It did not say where the first 109 objects were identified.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Onboard processing for the satellite’s own observationsDemonstratedFirst space-object observations reported
Next project milestone

Report in-orbit AI-processing, space-object monitoring and communications test results.

Experimental onboard AI-processing satelliteDetailed configuration not available in reviewed material.
Not disclosed in reviewed sources
Coverage note

No mission-specific specification for this field in the inspected university and launch-provider accounts.

Not disclosed in reviewed sources
Coverage note

No mission-specific specification for this field in the inspected university and launch-provider accounts.

Suppliers & relationships

3 suppliers / hosts · 3 relationships

Show all 3 relationships & detailsHide relationship details for Juntian-1 06A / Xingyan-01Open relationship research →
NarSha / GYEONGGISat-2 methane-monitoring programNara Space Technology · South KoreaLatest development 13 Nov 2026 ↗
Manual review with evidence gaps 26 Nov 2026

Stage detail: First mission launched, commissioning reported

Gyeonggi Province confirmed the first methane satellite reached orbit and plans a second launch in the first half of 2027. Unibap has not identified which spacecraft carried its iX5 computer.

No completed full profile review is recorded.

Sources collected: 10 Oct 2026.

Source collection and substantive profile review are separate checks.

Onboard processing for methane-monitoring optical missionsLaunchedFirst mission launched, commissioning reported
Next project milestone

Gyeonggi Province targets the first half of 2027 for GYEONGGISat-2B. Scanway plans to deliver two more instruments in the third quarter of 2027 for a mission planned for early 2028.

16U CubeSat standard platformNarSha standard-platform design, not final flight inventoryProject specification
Notes & source

Configuration: NarSha standard-platform design, not final flight inventory

Operator standard-platform description. Not a count of launched spacecraft.

Evidence basis: Project specification

Source / observation date: .

Supporting source ↗
1 more configurations / specifications
At least twelve microsatellites in the supplier's program roadmapNarSha constellation roadmapProject specification
Notes & source

Configuration: NarSha constellation roadmap

June25 supplier account states at least12, while earlier report wording and later possibilities vary. Not contracted spacecraft count, completed hardware or an additive total across aliases.

Evidence basis: Project specification

Source / observation date: .

Supporting source ↗
Unibap iX5 onboard computerNarSha compute mission on Transporter-18Project specification
Notes & source

Configuration: NarSha compute mission on Transporter-18

Supplier associates iX5 with the NarSha mission on October1. Exact iX5 variant, installed processor components, node count and flight benchmark are not identified. Not the D-Orbit iX20 or Altair iX10.

Evidence basis: Project specification

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The November 19 comparison of Nara Space's platform and mission accounts, Unibap's flight release and Scanway's instrument page does not establish a mission-specific value for this field. Standard-platform figures stay separately scoped.

Suppliers & relationships

3 suppliers / hosts · 8 relationships

  • SpaceXSupplierLaunch

    Partnership · Launch capacity

    LaunchedReported

    Nara Space reports that GYEONGGISat-2A launched aboard Falcon 9 and established two-way command and telemetry contact.

  • Contract awarded

    Progress unconfirmed · Disclosure

    Methane observation data distribution contract with Kazakhstan Gharysh Sapary covering GYEONGGISat-2A/2B and the NarSha constellation for…

Show all 8 relationships & detailsHide relationship details for NarSha / GYEONGGISat-2 methane-monitoring programOpen relationship research →
TY200Spacety (天仪空间科技股份有限公司) · Asia-Pacific · ChinaLatest development 13 Nov 2026 ↗
Manual review 23 Nov 2026

Stage detail: In development

Spacety plans to use onboard AI to operate and navigate TY200. The company targets launch by the end of 2027.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Use onboard AI for the spacecraft’s own operation and navigation during a lunar radar mission.DevelopmentIn development
Next project milestone

Spacety targets launch by the end of 2027.

Lunar onboard AI missionDetailed configuration not available in reviewed material.
Not disclosed in reviewed sources
Coverage note

Spacety’s mission announcement does not give a specification for this field.

Not disclosed in reviewed sources
Coverage note

Spacety’s mission announcement does not give a specification for this field.

Suppliers & relationships

5 relationships

Show all 5 relationships & detailsHide relationship details for TY200Open relationship research →
Merlin constellationSatellogic · United States / ArgentinaLatest development 10 Nov 2026 ↗
Manual review 23 Nov 2026

Stage detail: First satellite in early operations

Satellogic reports that Merlin.01 began payload commissioning in October and that early customers are trying its imagery. Links that would cue follow-up satellites are part of the constellation design.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Mission-serving onboard AI for Earth-observation detection, alerting and satellite cueingLaunchedFirst satellite in early operations
Next project milestone

Complete Merlin.01 payload testing and commissioning; Satellogic targets full service in the second half of 2027.

NewSat-derived platform with in-house engineering, manufacturing and testingmerlin01Official attributed configuration description
Notes & source

Configuration: merlin01

Spacecraft-platform lineage, not a disclosed CPU or accelerator. Satellogic describes making a larger magnetorquer for Merlin.

Evidence basis: Official attributed configuration description

Source / observation date: .

Supporting source ↗
2 more configurations / specifications
Additional launches planned for the first half of 2027Merlin constellation designOfficial operator plan
Notes & source

Configuration: Merlin planned constellation expansion

November10 plan, not booked launches or additional spacecraft in orbit

Evidence basis: Official operator plan

Source / observation date: .

Supporting source ↗
Payload commissioning underway since mid-October, with deployed solar arrays and initial customer engagement through First Missions ProgramMerlin.01 launched spacecraftSatellogic early-operations update
Notes & source

Configuration: Merlin.01 launched spacecraft

November10 operator update supersedes the October13 commissioning-pending wording. Completed payload commissioning and measured AI performance are not established

Evidence basis: Satellogic early-operations update

Source / observation date: .

Supporting source ↗
Onboard AI processes imagery and recognizes changeMerlin constellation designSatellogic design description
Notes & source

Configuration: Merlin constellation design

Qualitative workload description; processor, precision, throughput and commissioned results are undisclosed.

Evidence basis: Satellogic design description

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The reviewed releases give no IT electrical load.

Suppliers & relationships

1 supplier / host · 3 relationships

  • SpaceXSupplierLaunch

    Role confirmed · Launch capacity

    Progress unconfirmed · Disclosure

    Transporter-18 launch service for Merlin.01 into sun-synchronous low-Earth orbit.

  • HEOStrategic partner

    Partnership

    Progress unconfirmed · Disclosure

    Non-Earth imaging and analysis of Merlin.01 using Satellogic NewSat-47, providing an external view consistent with deployed solar arrays.

Show all 3 relationships & detailsHide relationship details for Merlin constellation
  • HEOStrategic partner

    Partnership

    Progress unconfirmed · Disclosure

    Non-Earth imaging and analysis of Merlin.01 using Satellogic NewSat-47, providing an external view consistent with deployed solar arrays.

    The release establishes operational collaboration and imagery support, not a disclosed supplier contract value or payload-commissioning result.

    Associated organization: Satellogic

    Source ↗
  • SpaceXSupplierLaunch

    Role confirmed · Launch capacity

    Progress unconfirmed · Disclosure

    Transporter-18 launch service for Merlin.01 into sun-synchronous low-Earth orbit.

    The operator identifies the launch provider and completed launch. Contract value, booking date and allocation within the rideshare are undisclosed.

    Associated organization: Satellogic

    Source ↗
  • SynMaxStrategic partner

    Partnership

    Progress unconfirmed · Disclosure

    Exclusive Theia channel for maritime intelligence derived from Merlin, including vessel tracking and dark-vessel analysis.

    Downstream analytics/distribution partnership, not an onboard hardware order or a disclosed capacity purchase. Price and guaranteed volumes are undisclosed.

    Associated organization: Satellogic

    Source ↗
Open relationship research →
Simera Sense edge and cloud AI processingSimera Sense · EuropeLatest development 10 Nov 2026 ↗
Manual review 28 Nov 2026

Stage detail: Development toward 2028 launch

Simera Sense plans to combine onboard AI on AMD Versal hardware with cloud tools. It expects its next generation of imagers to launch in 2028.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Process high resolution Earth observation imagery onboard and in cloud environments for rapid delivery of actionable informationDevelopmentDevelopment toward 2028 launch
Next project milestone

Launch new sub-one-metre imagers with integrated edge AI in 2028

Distributed operating system and AI models spanning radiation tolerant onboard hardware and ground hosted environmentsDevelopment systemOfficial company announcement
Notes & source

Configuration: Simera Sense edge and cloud AI system

The planned computer is integrated with the next generation of imagers. Customers can train, test and deploy their own algorithms in orbit or on the ground.

Evidence basis: Official company announcement

Source / observation date: .

Supporting source ↗
Radiation tolerant hardware based on AMD second generation Versal technologyDevelopment systemOfficial company announcement
Notes & source

Configuration: Simera Sense edge and cloud AI system

The exact Versal device, count, arithmetic format and throughput are not disclosed.

Evidence basis: Official company announcement

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

No IT electrical demand is disclosed.

Suppliers & relationships

1 supplier / host · 1 relationship

  • Role confirmed · Processors / accelerators

    Progress unconfirmed · Disclosure

    AMD second generation Versal technology identified as the basis of radiation tolerant hardware for the Simera Sense edge and cloud AI…

Show relationship details & sourcesHide relationship details for Simera Sense edge and cloud AI processing
  • Role confirmed · Processors / accelerators

    Progress unconfirmed · Disclosure

    AMD second generation Versal technology identified as the basis of radiation tolerant hardware for the Simera Sense edge and cloud AI system.

    The source identifies the processor technology family but does not disclose a direct purchase order, exact device, quantity or value.

    Associated organization: Simera Sense

    Source ↗
Open relationship research →
Rakuten AST J-LEO edge computingRakuten AST · JapanLatest development 9 Nov 2026 ↗
Manual review 28 Nov 2026

Stage detail: Joint venture formation and funded network development

CIAJ selected the proposal in June 2026. AST later confirmed signed satellite supply and operations software agreements. Rakuten AST targets domestic service by the end of March 2029.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Planned AI edge computing and spectrum management for Japan's Rakuten AST direct-to-device satellite networkDevelopmentJoint venture formation and funded network development
Next project milestone

Establish Rakuten AST, deploy the supported satellite network and begin domestic operations by the end of March 2029

Direct-to-device service for ordinary smartphones with domestic operations targeted by the end of March 2029Rakuten AST J-LEO networkPlanned network scope
Notes & source

Configuration: Rakuten AST Japanese mid-band LEO direct-to-device network

Rakuten says the joint venture was selected under Japan's J-LEO support framework and will build and operate a domestic mid-band LEO direct-to-device network. The target is a service plan, not an operating result.

Evidence basis: Planned network scope

Source / observation date: .

Supporting source ↗
AST SpaceMobile large-scale satellitesRakuten AST J-LEO networkSigned supply agreement disclosed in a securities filing
Notes & source

Configuration: Rakuten AST Japanese mid-band LEO direct-to-device network

AST SpaceMobile disclosed a signed supply agreement. The filing does not identify an installed processor, satellite count or exact model.

Evidence basis: Signed supply agreement disclosed in a securities filing

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

No project-specific IT electrical-load boundary or value is disclosed.

Suppliers & relationships

1 supplier / host · 4 relationships

  • Contract / order disclosed · Satellite bus

    Progress unconfirmed · Disclosure

    AST SpaceMobile signed two agreements with Rakuten AST. One covers satellite supply. The other is a $75 million license for software to run…

  • Rakuten MobileStrategic partner

    Development agreement

    Progress unconfirmed · Disclosure

    Rakuten Mobile will work with AST SpaceMobile to advance AI edge computing and AI-driven spectrum management for the Japanese…

Show all 4 relationships & detailsHide relationship details for Rakuten AST J-LEO edge computing
  • Investor

    Partnership · Investment & financing

    Progress unconfirmed · Disclosure

    AST SpaceMobile is a joint venture investor. Its Japanese subsidiary was named as holding 49% of the voting rights, with Rakuten Group holding 51%.

    This describes voting ownership. AST SpaceMobile’s planned preferred shares are recorded separately in the financing tracker.

    Associated organization: Rakuten AST

    Source ↗
    Supplier

    Contract / order disclosed · Satellite bus

    Progress unconfirmed · Disclosure

    AST SpaceMobile signed two agreements with Rakuten AST. One covers satellite supply. The other is a $75 million license for software to run the satellite and payload operations centers in Japan. AST and Rakuten Mobile also plan to develop edge computing and use AI to manage the network’s radio spectrum.

    The $75 million fee is for the software license. The filing does not disclose the satellite order value, number of satellites or exact satellite model.

    Buyer: Rakuten AST

    Source ↗
  • Rakuten MobileStrategic partner

    Development agreement

    Progress unconfirmed · Disclosure

    Rakuten Mobile will work with AST SpaceMobile to advance AI edge computing and AI-driven spectrum management for the Japanese direct-to-device network

    The release describes planned development and does not disclose a separate procurement order or price

    Buyer: Rakuten AST

    Source ↗
  • Partnership

    Progress unconfirmed · Disclosure

    CIAJ administers Japan’s J-LEO grant program and selected the joint proposal from Rakuten’s preparatory company and Rakuten Mobile.

    Japan’s Ministry of Internal Affairs and Communications provides the program funding. CIAJ administers the grant.

    Associated organization: Rakuten AST

    Source ↗
Open relationship research →
Youxi / Tianyan-27 computing demonstrationXuntian Qianhe · ChinaLatest development 8 Nov 2026 ↗
Manual review 22 Nov 2026

Stage detail: Government-reported launch

Compared current Songjiang and Shanghai government accounts. Youxi remains a May 2026 mission computing demonstration with an XT-50 platform, experimental solar cells and a custom thermal design. No later computing result or numerical hardware rating is published.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Onboard computing, display and sensing technology validationLaunchedGovernment-reported launch
Next project milestone

Publish mission-specific processing and environmental-test results

Mission computing and interaction demonstrationDetailed configuration not available in reviewed material.
XT-50 platform with intelligent computing payload, high-resolution display terminal and Earth-observation cameraYouxi / Tianyan-27Official mission account
Notes & source

Configuration: Youxi / Tianyan-27 flight demonstration

Mission-specific platform and payload descriptions. Installed processor/accelerator, counts and RAM/storage capacities are unspecified.

Evidence basis: Official mission account

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

No corresponding numerical specification established in official accounts inspected November8 2026.

Suppliers & relationships

2 suppliers / hosts · 2 relationships

  • Partnership · Thermal control

    Progress unconfirmed · Disclosure

    Custom thermal-management solution for Youxi’s computing satellite.

  • Partnership · Power

    LaunchedReported

    Jietai Aerospace’s flexible heterojunction silicon cells launched aboard Youxi on 15 May 2026 for radiation and atomic-oxygen exposure…

Show relationship details & sourcesHide relationship details for Youxi / Tianyan-27 computing demonstrationOpen relationship research →
NASA PROMISE lunar rover computingNASA and Jet Propulsion Laboratory · Moon, South PoleLatest development 7 Nov 2026 ↗
Manual review 29 Nov 2026

Stage detail: Rover development

NASA plans to test its HPSC computing system during the rover’s primary mission at the Moon’s South Pole.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

PROMISE will demonstrate a radiation-tolerant computer for its own lunar rover operations.DevelopmentRover development
Next project milestone

NASA targets a late 2028 launch and delivery to the Moon’s South Pole.

Lunar rover computing demonstrationDetailed configuration not available in reviewed material.
NASA High Performance Spaceflight Computing systemPROMISE lunar roverNASA flight plan
Notes & source

Configuration: PROMISE lunar rover

NASA named the computing system for the lunar demonstration. It did not specify which processor configuration will fly.

Evidence basis: NASA flight plan

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

The sources reviewed do not give a value for this configuration.

Suppliers & relationships

1 supplier / host · 1 relationship

  • Blue OriginSupplierCategory not recorded

    Contract / order disclosed

    PlannedReported

    Blue Origin will deliver the PROMISE rover to the Moon’s South Pole and deploy it using its Mark 1 lander.

Show relationship details & sourcesHide relationship details for NASA PROMISE lunar rover computing
  • Blue OriginSupplierCategory not recorded

    Contract / order disclosed

    PlannedReported

    Blue Origin will deliver the PROMISE rover to the Moon’s South Pole and deploy it using its Mark 1 lander.

    Original disclosure: Blue Origin will deliver the PROMISE rover to the Moon’s South Pole and deploy it using its Mark 1 lander.

    Buyer: NASA

    USD 94,000,000 · Base delivery contract

    Source ↗
Open relationship research →
CesiumAstro Element computing demonstrationsCesiumAstro · United StatesLatest development 5 Nov 2026 ↗
Manual review 22 Nov 2026

Stage detail: First spacecraft launched

Compared CesiumAstro's November 5 release. Element-1 remains in operation after its October launch as the first of eight planned spacecraft. The release adds no mission-specific quantitative specifications.

No completed full profile review is recorded.

Sources collected: Date unavailable.

Source collection and substantive profile review are separate checks.

Mission communications and onboard-computing demonstration programLaunchedFirst spacecraft launched
Next project milestone

Further dated spacecraft, deployment and technical results.

Element-1 in orbit, first of eight planned spacecraftCesiumAstro Element computing demonstrationsOfficial flight program description
Notes & source

Configuration: CesiumAstro Element computing demonstrations

Issuer-reported October2026 launch and operation, seven additional launches secured. No carrier names or individual launch dates supplied.

Evidence basis: Official flight program description

Source / observation date: .

Supporting source ↗
Integrated proprietary communications payloads, active phased arrays and onboard compute systemsCesiumAstro Element computing demonstrationsOfficial flight program description
Notes & source

Configuration: CesiumAstro Element computing demonstrations

Flight hardware described qualitatively, without processor models, quantities or arithmetic benchmarks.

Evidence basis: Official flight program description

Source / observation date: .

Supporting source ↗
Not disclosed in reviewed sources
Coverage note

No configuration-specific numerical value in the November5 2026 issuer release inspected November7. No generic product rating assigned.

Suppliers & relationships

No relationships recorded.

View project organizations →

Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.