Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: Vyoma Flamingo Hosted Payloads (FlaHOPs).
1–2 of 2 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| Kepler Tranche 2Vyoma Flamingo Hosted Payloads (FlaHOPs)Buyer: Vyoma | Kepler Communications | Host | Payload integration · Optical links PlannedReported Kepler plans to host Vyoma's surveillance payloads on ten Tranche 2 satellites, with a dedicated launch no earlier than October 2028. History & full recordOriginal disclosure: Hosting of Vyoma FlaHOP surveillance payloads across ten Tranche 2 spacecraft, with Kepler optical data relay and a dedicated launch targeted no earlier than October 2028. Buyer: Vyoma. Project profile: Kepler Tranche 2 Project profile: Vyoma Flamingo Hosted Payloads (FlaHOPs) Evidence checked 19 Nov 2026. | Contract / order disclosedSource ↗ |
| Vyoma Flamingo Hosted Payloads (FlaHOPs)Buyer: Vyoma | Scanway S.A. | Supplier | In developmentReported Scanway and Vyoma are developing at least 14 FlaHOP telescope flight models for delivery by the end of December 2027 under a contract worth no less than EUR 3.7 million. History & full recordOriginal disclosure: Joint development and delivery of at least 14 FlaHOP optical telescope flight models by the end of December 2027 for deployment across ten Kepler Tranche 2 satellites no earlier than October 2028 Buyer: Vyoma. USD 4,065,930 (EUR 3,700,000). Minimum disclosed contract value attributable to Scanway Project profile: Vyoma Flamingo Hosted Payloads (FlaHOPs) Evidence checked 20 Nov 2026. | Contract / order disclosedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.