Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving Sophia Space.
1–14 of 14 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| AthenaBuyer: Sophia Space | Spherical | Supplier | Electrical power system · BatteriesProgress unconfirmed · Disclosure Electrical power system and battery architecture for Athena, including integration and qualification support. History & full recordValue undisclosed. The award covers Athena; it does not establish orders for Sophia’s later constellation. Buyer: Sophia Space. Project profile: Athena Evidence checked 24 Sept 2026. | Contract / order disclosedSource ↗ |
| Sophia Orbital Operating System (SOOS)Associated organization: Sophia Space | PiLogic, Inc. | Supplier | PlannedReported PiLogic will demonstrate its software on Sophia Space’s ground test platform and use the results to inform later flight work. History & full recordOriginal disclosure: PiLogic will analyze mission needs and demonstrate software on Sophia Space’s ground test platform. Buyer: Not disclosed. Associated organization: Sophia Space. Project profile: Sophia Orbital Operating System (SOOS) Evidence checked 26 Nov 2026. | Contract / order disclosedSource ↗ |
| Sophia Orbital Operating System (SOOS)Associated organization: Sophia Space | SPACEWERX | Programme funding contributor | Progress unconfirmed · Disclosure A separate SpaceWERX award supports work on Sophia Space’s ground test platform and preparation for flight testing. History & full recordBuyer: Not disclosed. Associated organization: Sophia Space. Project profile: Sophia Orbital Operating System (SOOS) Evidence checked 26 Nov 2026. | Contract awardedSource ↗ |
| Sophia Orbital Operating System (SOOS)Associated organization: Sophia Space | Kepler Communications | Host | Communications · Flight / payload software · Data services DemonstratedReported Sophia reports distributed operating-system functions across multiple Kepler Tranche 1 satellites and multiple GPUs on each spacecraft. Progress source ↗History & full recordOriginal disclosure: Commercial collaboration combining Sophia's distributed orbital-compute software with Kepler's hosted compute and optical/RF relay network. The April agreement planned demonstrations from Q4 2026. Sophia's November 18 release reports distributed operating-system functions across Kepler Tranche 1 spacecraft and GPUs. Exact spacecraft identities, hardware allocation and deployment dates are undisclosed. Buyer: Not disclosed. Associated organization: Sophia Space. Project profile: Sophia Orbital Operating System (SOOS) Evidence checked 20 Oct 2026. | Development agreementSource ↗ |
| Sophia Orbital Operating System (SOOS)Associated organization: Sophia Space | NVIDIA | Supplier | Processors / acceleratorsProgress unconfirmed · Disclosure NVIDIA Jetson Orin compute platform used in Sophia Space hosted orbital-computing infrastructure. History & full recordTechnology-use relationship disclosed by NVIDIA and quoted by Sophia; purchase terms, order volume and mission assignment are not disclosed. Excluded from contract-award counts. Buyer: Not disclosed. Associated organization: Sophia Space. Project profile: Sophia Orbital Operating System (SOOS) Evidence checked 25 Sept 2026. | PartnershipSource ↗ |
| Sophia ten-satellite constellationAssociated organization: Sophia Space | SLI | Investor | Investment & financingProgress unconfirmed · Disclosure Proposed SLI purchase and operating lease of ten Sophia TILE spacecraft under a non-binding letter of support, with deployment as early as2028. History & full recordLeasing could spread customers’ infrastructure costs over the satellites’ useful lives. The framework remains nonbinding. Buyer: Not disclosed. Associated organization: Sophia Space. USD 300,000,000. non-binding asset-financing framework Project profile: Sophia ten-satellite constellation Evidence checked 7 Nov 2026. | Preliminary agreementSource ↗ |
| Sophia TILE study for NASA missionsAssociated organization: Sophia Space | NASA | Programme funding contributor | Progress unconfirmed · Disclosure NASA awarded Sophia Space a Phase I contract for this spacecraft technology study. History & full recordBuyer: Not disclosed. Associated organization: Sophia Space. Project profile: Sophia TILE study for NASA missions Evidence checked 23 Nov 2026. | Contract awardedSource ↗ |
| Sophia SpaceAssociated organizationCompany-level relationship | MIT Lincoln Laboratory | Research participant | Research & feasibility studiesProgress unconfirmed · Disclosure CRADA research into space-based computing for high-resolution weather modeling. MIT Lincoln Laboratory contributes modeling configurations, parameters, data and evaluation, while Sophia supplies an AI-inference compute… History & full recordCRADA research into space-based computing for high-resolution weather modeling. MIT Lincoln Laboratory contributes modeling configurations, parameters, data and evaluation, while Sophia supplies an AI-inference compute environment for terrestrial and potential orbital configurations. Research cooperation, not disclosed spacecraft procurement or completed orbital validation. The source gives no contract price, dedicated project allocation, funding award value or deployment date. October 19 is the announcement date rather than a separately verified execution date. Buyer: Not disclosed. Associated organization: Sophia Space. Evidence checked 20 Oct 2026. | PartnershipSource ↗ |
| Sophia SpaceAssociated organizationCompany-level relationship | Redwire Corporation | Strategic partner | Progress unconfirmed · Disclosure Explore Sophia TILE computing combined with Redwire deployable structures, solar power, thermal management, avionics and spacecraft integration for demonstration and longer-term orbital-computing architectures. History & full recordMOU for potential collaboration, not a procurement award or committed delivery. No named mission, legal buyer, price or launch schedule is disclosed. Mentioned U.S. agencies are potential pursuits, not selected customers. Buyer: Not disclosed. Associated organization: Sophia Space. Evidence checked 30 Sept 2026. | Preliminary agreementSource ↗ |
| Sophia SpaceBuyerCompany-level relationship | California Institute of Technology | Research participant | Thermal control · Deployable structuresProgress unconfirmed · Disclosure Sponsored research on lightweight large-scale deployable structures and thermal-management techniques for future Sophia Space orbital data centers. History & full recordThe announcement identifies a sponsored research agreement but discloses no value, duration or named flight. It is not mapped to Athena or another mission. Buyer: Sophia Space. Evidence checked 25 Sept 2026. | Development agreementSource ↗ |
| Sophia SpaceBuyerCompany-level relationship | Apex | Supplier | Satellite busProgress unconfirmed · Disclosure Nova satellite bus for a Sophia TILE demonstration planned for 2027. History & full recordThe announcement does not name Athena. Retained as a company award pending mission identification; excluded from project counts. Buyer: Sophia Space. Evidence checked 24 Sept 2026. | Role confirmedSource ↗ |
| Sophia SpaceAssociated organizationCompany-level relationship | Orbital Robotics Corp. | Strategic partner | Progress unconfirmed · Disclosure Non-binding LOI to explore conceptual alignment of Sophia TILE orbital edge computing with autonomous robotic operations, in-orbit sensor processing and long-term distributed infrastructure. History & full recordExploratory non-binding LOI, not a procurement or deployment commitment. No named mission, buyer, price, schedule, booked flight or binding hardware delivery is disclosed; no Athena or constellation association is inferred. Buyer: Not disclosed. Associated organization: Sophia Space. Evidence checked 3 Oct 2026. | Preliminary agreementSource ↗ |
| Sophia SpaceAssociated organizationCompany-level relationship | Outpost Technologies | Strategic partner | Progress unconfirmed · Disclosure Joint evaluation of on-orbit manufacturing-data processing and concept-level integration of Sophia Space TILE compute modules with Outpost Carryall return-to-Earth platforms. History & full recordThe first-party announcement describes a joint effort and says Sophia Space would be aboard a Carryall mission, but limits the integration to evaluation, potential integration and concept-level work. It discloses no named Sophia mission, legal buyer, price, booked flight, committed hardware delivery or operational result. Buyer: Not disclosed. Associated organization: Sophia Space. Evidence checked 1 Oct 2026. | PartnershipSource ↗ |
| Sophia SpaceAssociated organizationCompany-level relationship | Armada | Strategic partner | Compute & storage · Ground stations & ground segment · Flight / payload softwareProgress unconfirmed · Disclosure Integration of Armada Galleon ground edge data centers and Armada Edge Platform with Sophia TILE orbital compute modules and Sophia Orbital Operating System for a proposed Earth-to-space edge AI platform. History & full recordCompany-level strategic collaboration and platform integration announcement. No named mission, legal buyer, procurement award, price, committed spacecraft delivery, booked flight, deployed customer system or operating result is established. Buyer: Not disclosed. Associated organization: Sophia Space. Evidence checked 1 Oct 2026. | PartnershipSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.