Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving Maverick Space Systems.
1–4 of 4 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| Cal Poly CARP space chip experimentAssociated organization: California Polytechnic State University, San Luis Obispo | Maverick Space Systems | Supplier | Work completedReported Maverick completed launch integration for SAL-E before the March 30 rideshare. History & full recordOriginal disclosure: Maverick Space Systems handled launch integration for the SAL-E CubeSat carrying the CARP chip. Buyer: Not disclosed. Associated organization: California Polytechnic State University, San Luis Obispo. Project profile: Cal Poly CARP space chip experiment Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| Dcubed ARAQYS-D3 solar power demonstrationAssociated organization: Dcubed | Maverick Space Systems | Supplier | Progress unconfirmed · Disclosure Maverick Space Systems will arrange the ARAQYS-D3 launch and provide launch integration and management. History & full recordBuyer: Not disclosed. Associated organization: Dcubed. Project profile: Dcubed ARAQYS-D3 solar power demonstration Evidence checked 23 Nov 2026. | Role confirmedSource ↗ |
| EMISAR and OrbFIXAssociated organization: Institute of Space Science | Maverick Space Systems | Supplier | Launch integration Delivered / integratedReport date unconfirmed Romanian InSpace Engineering reports that EMISAR was integrated into its deployer at Maverick Space Systems’ California facility. History & full recordOriginal disclosure: Maverick Space Systems provided its facility and helped integrate EMISAR into the CubeSat deployer. Buyer: Not disclosed. Associated organization: Institute of Space Science. Project profile: EMISAR and OrbFIX Evidence checked 24 Nov 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| Kepler Tranche 2Buyer: Kepler Communications | Maverick Space Systems | Supplier | Launch capacity · Launch integrationProgress unconfirmed · Disclosure Capacity and launch integration for ten Kepler Tranche-2 satellites on Portal’s Motus Via Sol mission. History & full recordTarget: mid-2028. Commercial terms are undisclosed; SpaceX is the planned launch vehicle provider, not an inferred direct Kepler contract. Buyer: Kepler Communications. Project profile: Kepler Tranche 2 Evidence checked 24 Sept 2026. | Capacity reservedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.