Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving Frontgrade Gaisler.
1–21 of 21 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| ALTIUS flight data storageeSAIL onboard data handlingAssociated organization: DELTATEC | Frontgrade Gaisler | Supplier | Delivered / integratedReported The suppliers report that three units were operating aboard eSAIL and the ALTIUS flight memory unit had been delivered. History & full recordOriginal disclosure: Frontgrade Gaisler’s GR712RC processors were used in DELTATEC equipment for eSAIL and ALTIUS. Buyer: Not disclosed. Associated organization: DELTATEC. Project profile: ALTIUS flight data storage Project profile: eSAIL onboard data handling Evidence checked 29 Nov 2026. | Role confirmedSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | Frontgrade Gaisler | Supplier | Processors / accelerators LaunchedReported Frontgrade says its processor supported BELA during BepiColombo’s cruise. The instrument team identifies the flight processor as a LEON-2. Progress source ↗History & full recordOriginal disclosure: Frontgrade Gaisler’s fault-tolerant processor supports BELA’s instrument control and handling of ranging data. The BELA team identifies the flight processor as a LEON-2. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| COSMIC7 RISC-V space-microprocessor researchAssociated organization: Frontgrade Gaisler | Frontgrade Gaisler | Consortium participant | PlannedReport date unconfirmed Frontgrade Gaisler will integrate the test chip and contribute the RISC-V and GRLIB design blocks. Progress source ↗History & full recordOriginal disclosure: Frontgrade Gaisler coordinates COSMIC7, integrates the test chip and provides the RISC-V and GRLIB processor design blocks. This role is part of COSMIC7’s research program. Partner roles: https://cosmic7.eu/partners Buyer: Not disclosed. Associated organization: Frontgrade Gaisler. Project profile: COSMIC7 RISC-V space-microprocessor research Evidence checked 4 Nov 2026. | PartnershipSource ↗ |
| COSMIC7 RISC-V space-microprocessor researchAssociated organization: Frontgrade Gaisler | NanoXplore | Consortium participant | PlannedReport date unconfirmed NanoXplore and NanoXplore Design Services will contribute chip design and lay out the test chip. Progress source ↗History & full recordOriginal disclosure: NanoXplore provides semiconductor designs and chiplet expertise. NanoXplore Design Services lays out the test chip and routes its connections. This role is part of COSMIC7’s research program. Partner roles: https://cosmic7.eu/partners Buyer: Not disclosed. Associated organization: Frontgrade Gaisler. Project profile: COSMIC7 RISC-V space-microprocessor research Evidence checked 4 Nov 2026. | PartnershipSource ↗ |
| COSMIC7 RISC-V space-microprocessor researchAssociated organization: Frontgrade Gaisler | Thales Alenia Space | Consortium participant | PlannedReport date unconfirmed The French, Spanish and Italian Thales Alenia Space companies are the intended users of the test chip. Progress source ↗History & full recordOriginal disclosure: The French, Spanish and Italian Thales Alenia Space companies represent the intended users of the COSMIC7 test chip. This role is part of COSMIC7’s research program. Partner roles: https://cosmic7.eu/partners Buyer: Not disclosed. Associated organization: Frontgrade Gaisler. Project profile: COSMIC7 RISC-V space-microprocessor research Evidence checked 4 Nov 2026. | PartnershipSource ↗ |
| COSMIC7 RISC-V space-microprocessor researchAssociated organization: Frontgrade Gaisler | TTTech Computertechnik AG | Consortium participant | PlannedReport date unconfirmed TTTech will provide the test chip’s Gigabit Ethernet switch. Progress source ↗History & full recordOriginal disclosure: TTTech provides the Gigabit Ethernet switch for the COSMIC7 test chip. This role is part of COSMIC7’s research program. Partner roles: https://cosmic7.eu/partners Buyer: Not disclosed. Associated organization: Frontgrade Gaisler. Project profile: COSMIC7 RISC-V space-microprocessor research Evidence checked 4 Nov 2026. | PartnershipSource ↗ |
| COSMIC7 RISC-V space-microprocessor researchAssociated organization: Frontgrade Gaisler | Xiphera Oy | Consortium participant | PlannedReport date unconfirmed Xiphera will provide security designs that let the chip verify software before it starts. Progress source ↗History & full recordOriginal disclosure: Xiphera supplies security designs for the COSMIC7 test chip, including authenticated boot. This role is part of COSMIC7’s research program. Partner roles: https://cosmic7.eu/partners Buyer: Not disclosed. Associated organization: Frontgrade Gaisler. Project profile: COSMIC7 RISC-V space-microprocessor research Evidence checked 4 Nov 2026. | PartnershipSource ↗ |
| EMISAR and OrbFIXAssociated organization: Romanian InSpace Engineering | Frontgrade Gaisler | Supplier | Processors / accelerators DemonstratedReported The microcontroller supported onboard processing in the OrbFIX receiver that determined EMISAR’s position in orbit. History & full recordOriginal disclosure: Frontgrade Gaisler supplied the radiation-hardened microcontroller used in the OrbFIX navigation receiver. Buyer: Not disclosed. Associated organization: Romanian InSpace Engineering. Project profile: EMISAR and OrbFIX Evidence checked 24 Nov 2026. | PartnershipSource ↗ |
| Klepsydra PATTERNAssociated organization: Klepsydra Technologies | Frontgrade Gaisler | Research participant | Progress unconfirmed · Disclosure Support for the PATTERN AI inference software work within an ESA initiative. History & full recordBuyer: Not disclosed. Associated organization: Klepsydra Technologies. Project profile: Klepsydra PATTERN Evidence checked 9 Nov 2026. | PartnershipSource ↗ |
| Klepsydra QSMARTAssociated organization: Klepsydra Technologies | Frontgrade Gaisler | Supplier | Processors / acceleratorsProgress unconfirmed Gaisler NOEL-V processor platform named for Klepsydra QSMART lunar-landing ground demonstration at Space Tech Expo 2026. History & full recordNamed technology role in research and ground demonstrations. No mission procurement value is disclosed. Buyer: Not disclosed. Associated organization: Klepsydra Technologies. Project profile: Klepsydra QSMART Evidence checked 17 Nov 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| KP Labs Lion DPUAssociated organization: KP Labs | Frontgrade Gaisler | Supplier | Processors / accelerators PlannedReport date unconfirmed Gaisler GR716B supervising circuit named in the Lion DPU design. History & full recordOriginal disclosure: Gaisler GR716B supervising circuit named in the Lion DPU design. Component manufacturer credit. Generic GR716B specifications do not establish whole-DPU performance. Buyer: Not disclosed. Associated organization: KP Labs. Project profile: KP Labs Lion DPU Evidence checked 19 Nov 2026. | Role confirmedDisclosure date not suppliedSource ↗ |
| Nancy Grace Roman onboard computing and storageBuyer: NASA | Frontgrade Gaisler | Supplier | Progress unconfirmed · Disclosure GR740 processors support primary and backup spacecraft command and data handling plus instrument command and data handling. A GR712RC supports the Science Data Recorder. History & full recordSupplier announcement published after launch. Installed processor quantities are not disclosed. Buyer: NASA. Associated organization: NASA. Project profile: Nancy Grace Roman onboard computing and storage Evidence checked 21 Nov 2026. | Role confirmedSource ↗ |
| NEURO-RESPOND onboard computing studyAssociated organization: OHB Hellas | Frontgrade Gaisler | Research participant | Progress unconfirmed ESA lists Frontgrade Gaisler AB among the participants in the mission and computing feasibility study. History & full recordBuyer: Not disclosed. Associated organization: OHB Hellas. Project profile: NEURO-RESPOND onboard computing study Evidence checked 24 Nov 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| PLATO onboard data processingBuyer: European Space Agency (ESA) | Frontgrade Gaisler | Supplier | Delivered / integratedReported Frontgrade Gaisler identifies its processors and SpaceWire routers in the onboard design. History & full recordOriginal disclosure: Frontgrade Gaisler provides processors for 12 normal-camera computers and the routers that connect the processing units to the spacecraft. Buyer: European Space Agency (ESA). Associated organization: European Space Agency (ESA). Project profile: PLATO onboard data processing Evidence checked 24 Nov 2026. | PartnershipSource ↗ |
| VAIAS / GR801 neuromorphic accelerator validationAssociated organization: Frontgrade Gaisler | BrainChip Holdings Ltd | Supplier | Processors / acceleratorsProgress unconfirmed · Disclosure BrainChip Akida neuromorphic processing IP within the GR801 research architecture. History & full recordResearch workshare, programme leadership or named component technology provenance. No procurement price, license payment, completed qualification or flight delivery inferred. Buyer: Not disclosed. Associated organization: Frontgrade Gaisler. Project profile: VAIAS / GR801 neuromorphic accelerator validation Evidence checked 2 Nov 2026. | Role confirmedSource ↗ |
| VAIAS / GR801 neuromorphic accelerator validationAssociated organization: Frontgrade Gaisler | Rapidity Space AB | Research participant | Progress unconfirmed · Disclosure Neuromorphic event-based perception demonstrator and LLVM SIMD/SWAR / NOEL-V compiler extensions. History & full recordResearch workshare, programme leadership or named component technology provenance. No procurement price, license payment, completed qualification or flight delivery inferred. Buyer: Not disclosed. Associated organization: Frontgrade Gaisler. Project profile: VAIAS / GR801 neuromorphic accelerator validation Evidence checked 2 Nov 2026. | PartnershipSource ↗ |
| VAIAS / GR801 neuromorphic accelerator validationAssociated organization: Frontgrade Gaisler | RISE Research Institutes of Sweden | Research participant | Progress unconfirmed · Disclosure RISE leads the ESA Phi-Lab Sweden programme supporting VAIAS. History & full recordResearch workshare, programme leadership or named component technology provenance. No procurement price, license payment, completed qualification or flight delivery inferred. Buyer: Not disclosed. Associated organization: Frontgrade Gaisler. Project profile: VAIAS / GR801 neuromorphic accelerator validation Evidence checked 2 Nov 2026. | PartnershipSource ↗ |
| VAIAS / GR801 neuromorphic accelerator validationAssociated organization: Frontgrade Gaisler | STMicroelectronics | Supplier | Progress unconfirmed Named key supplier and planned GR801 28 nm FDSOI fabrication technology. History & full recordResearch workshare, programme leadership or named component technology provenance. No procurement price, license payment, completed qualification or flight delivery inferred. Buyer: Not disclosed. Associated organization: Frontgrade Gaisler. Project profile: VAIAS / GR801 neuromorphic accelerator validation Evidence checked 2 Nov 2026. | Role confirmedDisclosure date not suppliedSource ↗ |
| European Space Agency (ESA)BuyerCompany-level relationship | Frontgrade Gaisler | Supplier | In developmentReported Continue research and development of ultra-deep submicron processors for spacecraft. History & full recordOriginal disclosure: Continue research and development of ultra-deep submicron processors for spacecraft. Buyer: European Space Agency (ESA). USD 2,197,800 (EUR 2,000,000). Announced research contract value Evidence checked 26 Nov 2026. | Contract / order disclosedSource ↗ |
| European Space Agency (ESA)BuyerCompany-level relationship | Frontgrade Gaisler | Supplier | In developmentReported Develop a foundation for advanced semiconductor technology, including building blocks for space microprocessors. History & full recordOriginal disclosure: Develop a foundation for advanced semiconductor technology, including building blocks for space microprocessors. Buyer: European Space Agency (ESA). USD 8,660,000 (EUR 8,000,000). Announced research contract value Evidence checked 26 Nov 2026. | Contract / order disclosedSource ↗ |
| Frontgrade GaislerAssociated organizationCompany-level relationship | BrainChip Holdings Ltd | Supplier | Processors / acceleratorsProgress unconfirmed Integration of Akida neuromorphic IP alongside NOEL-V RISC-V processing in the forthcoming GR801 SoC. History & full recordOfficial named technical integration, not disclosure of a purchase order or legal agreement instrument. No signing date, procurement price or flight established. Buyer: Not disclosed. Associated organization: Frontgrade Gaisler. Evidence checked 26 Oct 2026. | PartnershipDisclosure date not suppliedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.