Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving European Space Agency (ESA).
1–25 of 101 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| AIKO orbital_OLIVER autonomy demonstrationBuyer: European Space Agency (ESA) | AIKO | Supplier | Flight / payload softwareProgress unconfirmed · Disclosure Renewed InCubed contract supporting orbital_OLIVER onboard-autonomy development, validation and commercialisation for another two years. History & full recordOctober 17 is the issuer announcement date, not a disclosed signature date. Contract value and exact renewal start/end dates are not specified. The software-development support is company-level and is not a new mission-specific hardware procurement. Buyer: European Space Agency (ESA). Associated organization: European Space Agency (ESA). Project profile: AIKO orbital_OLIVER autonomy demonstration Evidence checked 9 Oct 2026. | Contract / order disclosedSource ↗ |
| ALTIUS flight data storageAssociated organization: European Space Agency (ESA) | DELTATEC | Supplier | Delivered / integratedReported DELTATEC delivered the flight storage unit for ALTIUS. History & full recordOriginal disclosure: DELTATEC delivered the flight storage unit for ALTIUS. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: ALTIUS flight data storage Evidence checked 29 Nov 2026. | Role confirmedSource ↗ |
| ALTIUS flight data storageBuyer: European Space Agency (ESA) | OIP Sensor Systems | Supplier | In developmentReport date unconfirmed OIP Sensor Systems leads development of the ALTIUS spectral imager. History & full recordOriginal disclosure: OIP Sensor Systems leads development of the ALTIUS spectral imager. Buyer: European Space Agency (ESA). Project profile: ALTIUS flight data storage Evidence checked 29 Nov 2026. | Contract / order disclosedDisclosure date not suppliedSource ↗ |
| ALTIUS flight data storageBuyer: European Space Agency (ESA) | Redwire Space NV | Supplier | In developmentReport date unconfirmed Redwire Space in Belgium is the prime contractor for the ALTIUS satellite platform. History & full recordOriginal disclosure: Redwire Space in Belgium is the prime contractor for the ALTIUS satellite platform. Buyer: European Space Agency (ESA). Project profile: ALTIUS flight data storage Evidence checked 29 Nov 2026. | Contract / order disclosedDisclosure date not suppliedSource ↗ |
| ALTIUS flight data storageBuyer: European Space Agency (ESA) | Spacebel | Supplier | In developmentReport date unconfirmed Spacebel leads the team developing the ground systems that process ALTIUS science data. History & full recordOriginal disclosure: Spacebel leads the team developing the ground systems that process ALTIUS science data. Buyer: European Space Agency (ESA). Project profile: ALTIUS flight data storage Evidence checked 29 Nov 2026. | Contract / order disclosedDisclosure date not suppliedSource ↗ |
| APEX ARM space-processor researchAssociated organization: ARM Limited | European Space Agency (ESA) | Research participant | Progress unconfirmed ARM University Programme and ESA developing a prototypic CubeSat solution using APEX technology History & full recordThe 2017 account describes a CubeSat prototype under development. Buyer: Not disclosed. Associated organization: ARM Limited. Project profile: APEX ARM space-processor research Evidence checked 4 Nov 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| BASE neuromorphic space-autonomy researchAssociated organization: University of Vienna | European Space Agency (ESA) | Research participant | Progress unconfirmed · Disclosure ESA researchers coauthored the BASE-supported simulation study of memristor neural networks for spacecraft guidance and asteroid geodesy. History & full recordSimulation research using modeled devices. Buyer: Not disclosed. Associated organization: University of Vienna. Project profile: BASE neuromorphic space-autonomy research Evidence checked 6 Nov 2026. | PartnershipSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | Frontgrade Gaisler | Supplier | Processors / accelerators LaunchedReported Frontgrade says its processor supported BELA during BepiColombo’s cruise. The instrument team identifies the flight processor as a LEON-2. Progress source ↗History & full recordOriginal disclosure: Frontgrade Gaisler’s fault-tolerant processor supports BELA’s instrument control and handling of ranging data. The BELA team identifies the flight processor as a LEON-2. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | HENSOLDT Optronics GmbH | Supplier | DemonstratedReported HENSOLDT Optronics helped the team evaluate data after BELA fired its laser in flight. History & full recordOriginal disclosure: HENSOLDT Optronics manufactured BELA’s laser and helped evaluate its first flight firings. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | Actel Corporation | Supplier | Processors / accelerators LaunchedReported The instrument team documents the Actel chip in the flight range finder design. History & full recordOriginal disclosure: An Actel RTAX2000S programmable chip performs laser pulse detection in BELA’s range finder. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | University of Bern | Consortium participant | DemonstratedReported DLR reported that the instrument processed commands and sent telemetry during the first laser checkout on September 14, 2026. Progress source ↗History & full recordOriginal disclosure: The University of Bern led BELA’s hardware phase, developed the receiver, and integrated the instrument. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | German Aerospace Center (DLR) | Consortium participant | DemonstratedReported DLR reported that the instrument processed commands and sent telemetry during the first laser checkout on September 14, 2026. Progress source ↗History & full recordOriginal disclosure: DLR co-led BELA, developed its transmitter and control electronics, and led the operations phase. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | Excelitas Technologies | Supplier | LaunchedReported The BELA instrument paper identifies the Excelitas CD 3286 detector module in the receiver design. History & full recordOriginal disclosure: Excelitas made the custom detector module that senses reflected laser pulses for BELA. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | Instituto de Astrofísica de Andalucía | Consortium participant | LaunchedReported The power converter is part of BELA’s flight electronics. The team’s paper identifies the flight model board. History & full recordOriginal disclosure: The Instituto de Astrofísica de Andalucía led work on BELA’s power converter. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | Max Planck Institute for Solar System Research | Consortium participant | DemonstratedReported BELA transmitted its first laser pulses during flight checkout on September 14, 2026. Progress source ↗History & full recordOriginal disclosure: The Max Planck Institute for Solar System Research led the laser contribution to BELA. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| BepiColombo BELA onboard processingBuyer: European Space Agency (ESA) | Airbus Defence and Space | Supplier | Payload integration LaunchedReported The Airbus-built Mercury Planetary Orbiter launched on Ariane 5 with BELA aboard. Progress source ↗History & full recordOriginal disclosure: Airbus Defence and Space designed and built the Mercury Planetary Orbiter and developed central software for its onboard computers. Buyer: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Contract / order disclosedSource ↗ |
| BepiColombo BELA onboard processingBuyer: European Space Agency (ESA) | Arianespace | Supplier | Launch capacity Work completedReported Ariane 5 launched BepiColombo on October 20, 2018 UTC, October 19 in Kourou. Progress source ↗History & full recordOriginal disclosure: Arianespace launched BepiColombo on Ariane 5 from Europe’s Spaceport in Kourou. Buyer: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Contract / order disclosedDisclosure date not suppliedSource ↗ |
| Blackswan Space RPO Kit navigation computerAssociated organization: Blackswan Space | European Space Agency (ESA) | Programme funding contributor | In developmentReported ESA awarded funding for more navigation computer tests and integration work. History & full recordOriginal disclosure: ESA awarded funding for more navigation computer tests and integration work. Buyer: Not disclosed. Associated organization: Blackswan Space. Project profile: Blackswan Space RPO Kit navigation computer Evidence checked 26 Nov 2026. | Contract awardedSource ↗ |
| Blackswan Space RPO Kit navigation computerAssociated organization: Blackswan Space | European Space Agency (ESA) | Programme funding contributor | Work completedReported ESA funded the navigation computer work that led to the laboratory test. History & full recordOriginal disclosure: ESA funded the navigation computer work that led to the laboratory test. Buyer: Not disclosed. Associated organization: Blackswan Space. Project profile: Blackswan Space RPO Kit navigation computer Evidence checked 26 Nov 2026. | Contract awardedSource ↗ |
| CogniSAT-6 / HAMMERAssociated organization: Ubotica Technologies | European Space Agency (ESA) | Research participant | Progress unconfirmed ESA co-funded Ubotica's Bád maritime-monitoring pilots on the existing CogniSAT-6 spacecraft History & full recordThe page is undated and states a November 2024 to April 2026 contract duration without an amount. Bád is an application program on CogniSAT-6, not another spacecraft. Buyer: Not disclosed. Associated organization: Ubotica Technologies. Project profile: CogniSAT-6 / HAMMER Evidence checked 4 Nov 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| Cognitive Cloud Computing in Space for Earth Observation (3CS4EO)Buyer: European Space Agency (ESA) | Telespazio | Supplier | Progress unconfirmed Telespazio performed the ESA Phi-lab 3CS4EO feasibility study for cognitive cloud computing in space from July 2025 through September 2026. History & full recordThe official page gives the contract duration but not the award date or value. Buyer: European Space Agency (ESA). Project profile: Cognitive Cloud Computing in Space for Earth Observation (3CS4EO) Evidence checked 29 Oct 2026. | Contract / order disclosedDisclosure date not suppliedSource ↗ |
| D-Orbit Nebula / ION Space CloudAssociated organization: D-Orbit | European Space Agency (ESA) | Research participant | Progress unconfirmed ESA SpaceCloud support and application participation, including compression and scientific applications in the historical Wild Ride Nebula demonstration. History & full recordResearch and application collaboration, not a paid procurement or current service-capacity commitment. Buyer: Not disclosed. Associated organization: D-Orbit. Project profile: D-Orbit Nebula / ION Space Cloud Evidence checked 31 Oct 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| DLR Stellar Apps / ScOSA application platformAssociated organization: German Aerospace Center (DLR) | European Space Agency (ESA) | Host | Payload integrationProgress unconfirmed · Disclosure ESA OPS-SAT hosted DLR’s ScOSA software experiment for onboard AI image-quality selection History & full recordBuyer: Not disclosed. Associated organization: German Aerospace Center (DLR). Project profile: DLR Stellar Apps / ScOSA application platform Evidence checked 5 Nov 2026. | PartnershipSource ↗ |
| DSI MMU-NXT mass-memory researchAssociated organization: European Space Agency (ESA) | DSI Aerospace GmbH | Research participant | Research & feasibility studiesProgress unconfirmed ESA-funded 30-month MMU-NXT study develops an enhanced engineering-model mass-memory architecture. History & full recordMore onboard storage and faster internal transfers could help future satellites buffer instrument measurements and prepare useful data for transmission to Earth. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: DSI MMU-NXT mass-memory research Evidence checked 7 Nov 2026. | Development agreementDisclosure date not suppliedSource ↗ |
| EDGX STERNA orbital-computing demonstrationsAssociated organization: European Space Agency (ESA) | EDGX | Research participant | Progress unconfirmed · Disclosure ARTES-supported STERNA definition, technology development and in-orbit demonstration. History & full recordDisclosed phase budgets do not establish ESA contribution amounts. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: EDGX STERNA orbital-computing demonstrations Evidence checked 27 Oct 2026. | Development agreementSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.