Fleet transition intelligence
Contract endings, confirmed follow-ons, customer changes and regional moves from accepted assignments. Short administrative gaps, maintenance windows and unknown placeholder geographies/customers are de-emphasized.
Transition rows use the production-backed asset universe. Unknown regions and undisclosed customers are excluded from regional/customer movement counts and handled as coverage quality elsewhere.
Transition mix
Decision filters below keep production assignment rows source-backed.136 production transition results
Useful production results from current and next assignments; every row shows commercial significance and confidence.| Asset | Current customer / region | Current contract end | Next customer / region | Next start | Transition type | Gap | Commercial significance | Confidence | Last verified | Evidence |
|---|---|---|---|---|---|---|---|---|---|---|
| Blackford Dolphin Dolphin Drilling | Oil India Limited India | Aug 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Dolphin Drilling Our Fleet and official contract disclosures Current evidence: 8 Jul 2026 Dolphin Drilling release: Blackford Dolphin will continue its drilling contract for Oil India Limited; extended until at least 28th August 2026 at locations East of India under the same terms and scope as the existing contract. Next evidence: Excerpt not available Open source |
| Mist Borr Drilling | Valeura Energy Thailand | Aug 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Mist KFELS Super B Bigfoot Class 350 ft 2013 Valeura Energy December - 2023 August - 2026 Thailand Operating Next evidence: Excerpt not available Open source |
| Noble Viking Noble | TotalEnergies Papua New Guinea | Aug 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Viking Papua New Guinea TotalEnergies Jun-26 Aug-26 Undisclosed Next evidence: Excerpt not available Open source |
| VALARIS 120 Valaris | Eni United Kingdom | Aug 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS 120 KFELS Super A 2013 Eni UK Jan 26 Aug 26 VALARIS 120 will substitute for VALARIS 248 from Jan 2026 to Aug 2026, while VALARIS 248 Next evidence: Excerpt not available Open source |
| VALARIS 123 Valaris | TAQA Netherlands | Aug 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: TAQA Netherlands Jan 26 Aug 26 $80,000 Accommodation support Next evidence: Excerpt not available Open source |
| Harvey H. Ward Shelf Drilling | Suspended Saudi Arabia | Sept 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Shelf Drilling Fleet Status Report Current evidence: Harvey H. Ward F&G L-780 Mod II 300 Suspended Saudi Arabia Sep 2024 Sep 2026 Next evidence: Excerpt not available Open source |
| Grid Borr Drilling | Halliburton Angola | Sept 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Grid PPL Pacific Class 400 400 ft 2018 Halliburton March - 2026 September - 2026 Angola Operating with option to extend Next evidence: Excerpt not available Open source |
| Noble Intrepid Noble | BP United Kingdom | Sept 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Intrepid United Kingdom bp Apr-26 Sep-26 $150,000 Plus two option wells. Next evidence: Excerpt not available Open source |
| Ran Borr Drilling | Eni Mexico | Sept 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Ran 1 KFELS Super A Class 400 ft 2013 Eni May - 2025 September - 2026 Mexico Operating Next evidence: Excerpt not available Open source |
| Key Singapore Shelf Drilling | ONGC India | Oct 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Shelf Drilling Fleet Status Report Current evidence: Key Singapore MLT 116-C 350 ONGC India Oct 2023 Oct 2026 Next evidence: Excerpt not available Open source |
| Transocean Endurance Transocean | Woodside Australia | Oct 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Aug 2026 | EvidenceSource title: May 2026 Fleet Status Report Current evidence: Australia Woodside Firm Aug-26 Oct-26 419,000 Next evidence: Excerpt not available Open source |
| West Neptune Seadrill | LLOG U.S. Gulf of Mexico | Oct 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Seadrill Fleet Status Report Current evidence: West Neptune 2014 Drillship U.S. Gulf LLOG May-26 Oct-26 May-26 total contract value at signing was ~$48m for ~120-day duration Next evidence: Excerpt not available Open source |
| Thor Borr Drilling | PVEP-Cuulong Vietnam | Oct 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Thor KFELS Super B Bigfoot Class 400 ft 2019 PVEP-Cuulong July - 2026 October - 2026 Vietnam Committed Next evidence: Excerpt not available Open source |
| VALARIS 121 Valaris | Adura United Kingdom | Oct 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: Adura UK Feb 26 Oct 26 Contracted revenue backlog of over $25 million based on estimated duration of 194 days. Option with Next evidence: Excerpt not available Open source |
| Vali Borr Drilling | Mellitah Oil And Gas Libya | Oct 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Vali KFELS Super B Bigfoot Class 400 ft 2024 Mellitah Oil and Gas March - 2025 October - 2026 Libya Operating with option to extend Next evidence: Excerpt not available Open source |
| West Gemini Seadrill | Sonangol Angola | Nov 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Seadrill Fleet Status Report Current evidence: West Gemini 2010 Drillship Angola Sonangol Feb-26 Nov-26 Managed by Seadrill through Sonadrill joint venture; Seadrill earns daily management fee, not dayrate Next evidence: Excerpt not available Open source |
| Noble BlackHawk Noble | Occidental U.S. Gulf of Mexico | Nov 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble BlackHawk US Gulf Occidental Nov-24 Nov-26 Undisclosed Plus three one-year unpriced options. Next evidence: Excerpt not available Open source |
| Skald Borr Drilling | Vestigo Petroleum Malaysia | Nov 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Skald KFELS Super B Bigfoot Class 400 ft 2018 Vestigo Petroleum June - 2026 November - 2026 Malaysia Committed with option to extend Next evidence: Excerpt not available Open source |
| Shelf Drilling Barsk Shelf Drilling | Equinor Norway | Dec 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Shelf Drilling Fleet Status Report Current evidence: Shelf Drilling Barsk GustoMSC CJ70-X150-ST 492 Equinor Norway Nov 2024 Dec 2026 Customer has options for additional wells. Next evidence: Excerpt not available Open source |
| Deepsea Yantai Odfjell Drilling | Various Norway | Dec 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Odfjell Drilling Our Fleet Current evidence: Official availability timeline: contract segment during 2026, followed by empty undisclosed/open timeline. Next evidence: Excerpt not available Open source |
| Bestla Borr Drilling | Eni Netherlands | Dec 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Bestla 1,4 Gusto MSC CJ50 350 ft 2008 Eni December - 2025 December - 2026 Netherlands Operating with option to extend Next evidence: Excerpt not available Open source |
| Forseti Borr Drilling | Noble Corp Qatar | Dec 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: 2013 Noble Corp December - 2025 December - 2026 Qatar Committed under BBC Next evidence: Excerpt not available Open source |
| Hank Boswell ARO Drilling | Saudi Aramco Saudi Arabia | Dec 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: Hank Boswell LT Tarzan 225-C Saudi Aramco Saudi Arabia Oct 18 Dec 26 Next evidence: Excerpt not available Open source |
| Norve Borr Drilling | Cantium United States | Dec 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Cantium June - 2026 December - 2026 United States of America Committed with option to extend Next evidence: Excerpt not available Open source |
| Scooter Yeargain ARO Drilling | Saudi Aramco Saudi Arabia | Dec 2026 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: Scooter Yeargain LT Tarzan 225-C Saudi Aramco Saudi Arabia Oct 18 Dec 26 Expect approx. 85 days out of service for planned maintenance in 2Q26 Next evidence: Excerpt not available Open source |
| Arabia II Borr Drilling | Bunduq United Arab Emirates | Jan 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Arabia II KFELS B Class 400 ft 2019 Bunduq September - 2025 January - 2027 United Arab Emirates Operating with option to extend Next evidence: Excerpt not available Open source |
| Gerd Borr Drilling | Foxtrot International Côte d’Ivoire | Jan 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Gerd PPL Pacific Class 400 400 ft 2018 Foxtrot International February - 2026 January - 2027 Ivory Coast Operating with option to extend Next evidence: Excerpt not available Open source |
| Noble Faye Kozack Noble | Petrobras Brazil | Jan 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Faye Kozack Brazil Petrobras Jul-24 Jan-27 Undisclosed Next evidence: Excerpt not available Open source |
| Rig 141 Shelf Drilling | Gempetco Egypt | Feb 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Shelf Drilling Fleet Status Report Current evidence: Rig 141 MLT 82-SD-C 250 Gempetco Egypt Feb 2024 Feb 2027 Secured 1-year contract extension. Next evidence: Excerpt not available Open source |
| Natt Borr Drilling | SNEPCO Nigeria | Feb 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Natt PPL Pacific Class 400 400 ft 2018 SNEPCO April - 2026 February - 2027 Nigeria Operating with option to extend Next evidence: Excerpt not available Open source |
| VALARIS Norway Valaris | Ithaca Energy United Kingdom | Feb 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: Ithaca Energy UK May 26 Feb 27 Contracted revenue backlog of approx. $36 million based on duration of 300 days Next evidence: Excerpt not available Open source |
| Trident II Shelf Drilling | ONGC India | Mar 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Shelf Drilling Fleet Status Report Current evidence: Trident II MLT 84-SC Mod 300 ONGC India Mar 2024 Mar 2027 Next evidence: Excerpt not available Open source |
| VALARIS 108 Valaris | ARO Drilling Saudi Arabia | Mar 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS 108 KFELS MOD V-B 2007 ARO Drilling Saudi Arabia Mar 24 Mar 27 Expect approx. 15 days out of service for planned maintenance in 2Q26. 1-year priced Next evidence: Excerpt not available Open source |
| Saga Borr Drilling | Brunei Shell Petroleum Brunei | Apr 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Saga KFELS Super B Bigfoot Class 400 ft 2018 Brunei Shell Petroleum November - 2022 April - 2027 Brunei Operating with option to extend Next evidence: Excerpt not available Open source |
| VALARIS DS-12 Valaris | BP Egypt | Apr 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS DS-12 DSME 12000 2013 BP Egypt Apr 26 Apr 27 TCV, based on estimated duration of 350 days, is approx. $140 million, inclusive of MPD and Next evidence: Excerpt not available Open source |
| Prospector 5 Borr Drilling | BW Energy Gabon | May 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: BW Energy July - 2026 May - 2027 Gabon LOA Next evidence: Excerpt not available Open source |
| West Capella Seadrill | PTTEP Malaysia | Jun 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Seadrill Fleet Status Report Current evidence: West Capella 2008 Drillship Malaysia PTTEP Mar-26 Jun-27 Next evidence: Excerpt not available Open source |
| Noble Stanley Lafosse Noble | Murphy U.S. Gulf of Mexico | Aug 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Stanley Lafosse US Gulf Murphy Feb-25 Aug-27 Undisclosed Plus one 5-well option. Next evidence: Excerpt not available Open source |
| VALARIS 92 Valaris | Shell United Kingdom | Aug 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS 92 LT 116-C 1982 Shell UK Aug 25 Aug 27 Options with total duration of up to one year Next evidence: Excerpt not available Open source |
| VALARIS Stavanger Valaris | NEO NEXT+ United Kingdom | Aug 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS Stavanger KFELS N Class 2011 NEO NEXT+ UK Jan 26 Aug 27 TCV of over $75 million based on 600-day priced extension. Two 200-day priced options Next evidence: Excerpt not available Open source |
| Shelf Drilling Krathong Shelf Drilling | Chevron Thailand | Sept 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Shelf Drilling Fleet Status Report Current evidence: Shelf Drilling Krathong LT Super 116 E 350 Chevron Thailand Aug 2022 Sep 2027 Customer has 1-year option. Next evidence: Excerpt not available Open source |
| Noble Innovator Noble | BP United Kingdom | Sept 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Innovator United Kingdom bp Aug-26 Sep-27 $150,000 Plus two option wells. Next evidence: Excerpt not available Open source |
| VALARIS 72 Valaris | Eni United Kingdom | Sept 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS 72 Hitachi 300C 1981 Eni UK Oct 25 Sep 27 Next evidence: Excerpt not available Open source |
| Deepwater Pontus Transocean | Shell U.S. Gulf of Mexico | Oct 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: May 2026 Fleet Status Report Current evidence: Deepwater Pontus 1 1,400 2017 USGOM Shell Firm Oct-17 Oct-27 496,000 Next evidence: Excerpt not available Open source |
| West Saturn Seadrill | Equinor Brazil | Oct 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Seadrill Fleet Status Report Current evidence: West Saturn 2014 Drillship Brazil Equinor Oct-22 Oct-27 Next evidence: Excerpt not available Open source |
| VALARIS 144 Valaris | Azule Energy Angola | Oct 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS 144 LT Super 116-E 2010 Azule Energy Angola Sep 25 Oct 27 TCV estimated to be between $149 million and $156 million based on contract duration of Next evidence: Excerpt not available Open source |
| Transocean Norge Transocean | Harbour Energy / OMV Norway | Nov 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: May 2026 Fleet Status Report Current evidence: Transocean Norge 2, 3 Norway Harbour Energy / OMV Firm Jan-26 Nov-27 456,000 Next evidence: Excerpt not available Open source |
| West Auriga Seadrill | Petrobras Brazil | Nov 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Seadrill Fleet Status Report Current evidence: West Auriga 2013 Drillship Brazil Petrobras Dec-24 Nov-27 Total contract value at signing was ~$577m, including mobilization and additional services Next evidence: Excerpt not available Open source |
| Noble Integrator Noble | Aker BP Norway | Nov 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Integrator Norway Aker BP Apr-24 Nov-27 Undisclosed Frame agreement. Next evidence: Excerpt not available Open source |
| Noble Invincible Noble | Aker BP Norway | Nov 2027 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Invincible Norway Aker BP Dec-24 Nov-27 Undisclosed Frame agreement. Next evidence: Excerpt not available Open source |
| Shelf Drilling Chaophraya Shelf Drilling | Chevron Thailand | Jan 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Shelf Drilling Fleet Status Report Current evidence: Shelf Drilling Chaophraya LT Super 116 E 350 Chevron Thailand Aug 2022 Jan 2028 Customer has 1-year option. Next evidence: Excerpt not available Open source |
| VALARIS 248 Valaris | Eni United Kingdom | Jan 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: Eni UK Aug 26 Jan 28 TCV of approx. $84 million for 730-day contract to perform P&A and CCS work. Two 3-month options. Next evidence: Excerpt not available Open source |
| VALARIS DS-17 Valaris | Equinor Brazil | Jan 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS DS-17 GustoMSC P10000 2014 Equinor Brazil Mar 26 Jan 28 Estimated total contract value ("TCV") of $498 million, inclusive of MPD, additional services and Next evidence: Excerpt not available Open source |
| Deepwater Poseidon Transocean | Shell U.S. Gulf of Mexico | Feb 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: May 2026 Fleet Status Report Current evidence: Deepwater Poseidon 1 1,400 2018 USGOM Shell Firm Sep-18 Feb-28 499,000 Next evidence: Excerpt not available Open source |
| Deepsea Bergen Odfjell Drilling | OMV Norway | Feb 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Odfjell Drilling Our Fleet Current evidence: Official fleet card title is Deepsea Bergen; URL slug remains deepsea-bollsta. Availability timeline shows contract through about February 2028. Next evidence: Excerpt not available Open source |
| Deepwater Invictus Transocean | BP U.S. Gulf of Mexico | Apr 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: May 2026 Fleet Status Report Current evidence: Deepwater Invictus 1,400 2014 USGOM bp Firm Apr-25 Apr-28 485,000 Next evidence: Excerpt not available Open source |
| Deepwater Titan Transocean | Chevron U.S. Gulf of Mexico | Apr 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: May 2026 Fleet Status Report Current evidence: Deepwater Titan 1 1,700 2023 USGOM Chevron Firm Apr-23 Apr-28 462,000 Next evidence: Excerpt not available Open source |
| Njord Borr Drilling | PEMEX Mexico | Apr 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Njord PPL Pacific Class 400 400 ft 2019 PEMEX 2 May - 2026 April - 2028 Mexico Operating with option to extend Next evidence: Excerpt not available Open source |
| Gersemi Borr Drilling | PEMEX Mexico | May 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Gersemi PPL Pacific Class 400 400 ft 2018 PEMEX 2 January - 2024 May - 2028 Mexico Operating with option to extend Next evidence: Excerpt not available Open source |
| Noble Patriot Noble | TAQA United Kingdom | Jun 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Patriot United Kingdom TAQA Jan-25 Jun-28 Undisclosed 52 well P&A scope. Next evidence: Excerpt not available Open source |
| VALARIS 106 Valaris | BP Indonesia | Jun 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: BP Indonesia Jul 26 Jun 28 TCV of approx. $74 million based on estimated duration of two years. Four 1-well options Next evidence: Excerpt not available Open source |
| Sonangol Quenguela Sonadrill | TotalEnergies Angola | Jul 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Seadrill Fleet Status Report Current evidence: Sonangol Quenguela 2019 Drillship Angola TotalEnergies May-24 Jul-28 Managed by Seadrill through Sonadrill joint venture; Seadrill earns daily management fee, not dayrate Next evidence: Excerpt not available Open source |
| Noble Gerry de Souza Noble | ExxonMobil Nigeria | Jul 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Gerry de Souza Nigeria ExxonMobil Aug-26 Jul-28 Undisclosed Two-year contract plus three years of options. Next evidence: Excerpt not available Open source |
| VALARIS DS-10 Valaris | Shell Nigeria | Jul 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: Shell Nigeria Jun 26 Jul 28 TCV of $352 million based on duration of two years. TCV does not include the provision of Next evidence: Excerpt not available Open source |
| VALARIS DS-9 Valaris | ExxonMobil Angola | Jul 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: ExxonMobil Angola Jul 26 Jul 28 Operating day rate is in line with recent market rates in the region. Two 6-month options Next evidence: Excerpt not available Open source |
| VALARIS 118 Valaris | BP Trinidad And Tobago | Aug 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS 118 LT 240-C 2012 BP Trinidad Nov 25 Aug 28 TCV of approx. $168 million based on duration of three years. Two 1-year options Next evidence: Excerpt not available Open source |
| Arabia III Borr Drilling | Saudi Aramco Saudi Arabia | Sept 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Arabia III 1 KFELS Super A Class 400 ft 2013 Saudi Aramco September - 2023 September - 2028 Saudi Arabia Operating with option to extend Next evidence: Excerpt not available Open source |
| VALARIS DS-16 Valaris | Occidental U.S. Gulf of Mexico | Dec 2028 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: Occidental Gulf of America Jun 26 Dec 28 940-day contract extension for DS-16 and 914-day contract for DS-18. Combined addition to Next evidence: Excerpt not available Open source |
| Deepwater Thalassa Transocean | Woodside Mexico | Feb 2029 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: May 2026 Fleet Status Report Current evidence: Deepwater Thalassa 1 1,400 2016 Mexico Woodside Firm Mar-26 Feb-29 495,000 Next evidence: Excerpt not available Open source |
| Noble Bob Douglas Noble | ExxonMobil Guyana | Feb 2029 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Bob Douglas Guyana ExxonMobil Apr-18 Feb-29 Market based Contract award under CEA. Next evidence: Excerpt not available Open source |
| Noble Don Taylor Noble | ExxonMobil Guyana | Feb 2029 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Don Taylor Guyana ExxonMobil Nov-19 Feb-29 Market based Contract award under CEA. Next evidence: Excerpt not available Open source |
| Noble Sam Croft Noble | ExxonMobil Guyana | Feb 2029 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Sam Croft Guyana ExxonMobil Apr-19 Feb-29 Market based Contract award under CEA. Next evidence: Excerpt not available Open source |
| Noble Tom Madden Noble | ExxonMobil Guyana | Feb 2029 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Tom Madden Guyana ExxonMobil Dec-19 Feb-29 Market based Contract award under CEA. Next evidence: Excerpt not available Open source |
| West Jupiter Seadrill | Petrobras Brazil | Mar 2029 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Seadrill Fleet Status Report Current evidence: West Jupiter 2014 Drillship Brazil Petrobras Mar-26 Mar-29 Total contract value at signing was ~$525m, including mobilization and additional services Next evidence: Excerpt not available Open source |
| Arabia I Borr Drilling | Petrobras Brazil | Apr 2029 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Borr Drilling Fleet Status Report Current evidence: Arabia I KFELS B Class 400 ft 2020 Petrobras 3 April - 2025 April - 2029 Brazil Operating with option to extend Next evidence: Excerpt not available Open source |
| West Tellus Seadrill | Petrobras Brazil | Jun 2029 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Seadrill Fleet Status Report Current evidence: West Tellus 2013 Drillship Brazil Petrobras Jun-26 Jun-29 Total contract value at signing was ~$539m, including mobilization and additional services Next evidence: Excerpt not available Open source |
| VALARIS 110 Valaris | NOC Qatar | Oct 2029 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS 110 KFELS MOD V-B 2015 NOC Qatar Oct 25 Oct 29 Contracted revenue backlog for the four-year extension is approx. $117 million. 1-year Next evidence: Excerpt not available Open source |
| Deepsea Stavanger Odfjell Drilling | Aker BP Norway | Jan 2030 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Odfjell Drilling Our Fleet Current evidence: Official availability timeline displays continuous contract coverage across 2026-2030; raw HTML contains negative/over-100 technical bar artefact, so the visible displayed span is preserved. Next evidence: Excerpt not available Open source |
| VALARIS 116 Valaris | ARO Drilling Saudi Arabia | Apr 2030 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS 116 LT 240-C 2008 ARO Drilling Saudi Arabia May 25 Apr 30 Expect approx. 120 days out of service for planned maintenance in 2Q/3Q26. Next evidence: Excerpt not available Open source |
| VALARIS 140 Valaris | ARO Drilling Saudi Arabia | Apr 2030 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS 140 LT Super 116-E 2016 ARO Drilling Saudi Arabia May 25 Apr 30 Expect approx. 30 days out of service for planned maintenance in 2Q26 Next evidence: Excerpt not available Open source |
| VALARIS 146 Valaris | ARO Drilling Saudi Arabia | Apr 2030 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS 146 LT Super 116-E 2011 ARO Drilling Saudi Arabia May 25 Apr 30 Expect approx. 90 days out of service for planned maintenance in 3Q/4Q26 Next evidence: Excerpt not available Open source |
| VALARIS 250 Valaris | ARO Drilling Saudi Arabia | Apr 2030 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS 250 LT Super Gorilla XL 2003 ARO Drilling Saudi Arabia May 25 Apr 30 Expect approx. 120 days out of service for planned maintenance in 2Q/3Q26. Next evidence: Excerpt not available Open source |
| High Island V Shelf Drilling | Saudi Aramco Saudi Arabia | Jul 2030 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Shelf Drilling Fleet Status Report Current evidence: High Island V MLT 82-SD-C 270 Saudi Aramco Saudi Arabia Jul 2022 Jul 2030 Secured 5-year contract extension. Planned OOS in Q4 2025/Q1 2026. Next evidence: Excerpt not available Open source |
| Noble Voyager Noble | Shell U.S. Gulf of Mexico | Jul 2030 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Voyager US Gulf Shell Jul-26 Jul-30 Undisclosed Four-year contract plus four one-year options. Next evidence: Excerpt not available Open source |
| VALARIS 141 Valaris | ARO Drilling Saudi Arabia | Aug 2030 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS 141 LT Super 116-E 2016 ARO Drilling Saudi Arabia Aug 25 Aug 30 Expect approx. 10 days out of service for planned maintenance in 2Q26 Next evidence: Excerpt not available Open source |
| Noble Courage Noble | Petrobras Brazil | Dec 2030 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Noble Fleet Status Report Current evidence: Noble Courage Brazil Petrobras Dec-23 Dec-30 Undisclosed 1,115 days extension through Dec-30. Next evidence: Excerpt not available Open source |
| VALARIS 76 Valaris | ARO Drilling Saudi Arabia | Dec 2030 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: VALARIS 76 LT Super 116-C 2000 ARO Drilling Saudi Arabia Dec 25 Dec 30 Priced options of up to two years Next evidence: Excerpt not available Open source |
| West Polaris Seadrill | Petrobras Brazil | Jan 2031 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Seadrill Fleet Status Report Current evidence: West Polaris 2008 Drillship Brazil Petrobras Feb-25 Jan-31 Next evidence: Excerpt not available Open source |
| High Island IX Shelf Drilling | Saudi Aramco4 Saudi Arabia | Jun 2031 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Shelf Drilling Fleet Status Report Current evidence: High Island IX MLT 82-SD-C 250 Saudi Aramco4 Saudi Arabia Jun 2021 Jun 2031 Next evidence: Excerpt not available Open source |
| Kingdom 1 ARO Drilling | Saudi Aramco Saudi Arabia | Nov 2031 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: Kingdom 1 LT 116-C Saudi Aramco Saudi Arabia Nov 23 Nov 31 Expect approx. 30 days out of service for planned maintenance in 3Q26 Next evidence: Excerpt not available Open source |
| Kingdom 2 ARO Drilling | Saudi Aramco Saudi Arabia | Aug 2032 | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Valaris Fleet Status Report Current evidence: Kingdom 2 LT 116-C Saudi Aramco Saudi Arabia Aug 24 Aug 32 Expect approx. 25 days out of service for planned maintenance in 4Q26 Next evidence: Excerpt not available Open source |
| Adriatic I Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Borgland Dolphin Dolphin Drilling | No Active Assignment Identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| C.E. Thornton Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Compact Driller Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Deepsea Mira Odfjell Drilling | Current Assignment Not Disclosed In Official Sources Namibia | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Deepwater Asgard Transocean | Customer undisclosed Eastern Mediterranean | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Aug 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Deepwater Conqueror Transocean | Customer undisclosed U.S. Gulf of Mexico | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Deepwater Skyros Transocean | Customer undisclosed Australia | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Aug 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Dhirubhai Deepwater KG2 Transocean | Customer undisclosed Brazil | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Aug 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| F.G. McClintock Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Galar Borr Drilling | Customer undisclosed Mexico | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Gunnlod Borr Drilling | TLJOC Vietnam | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Hercules Odfjell Drilling | No Active Assignment Identified Norway | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| High Island IV Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| J.P. Bussell ARO Drilling | Customer undisclosed Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| J.T. Angel Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Joro Borr Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Key Manhattan Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Main Pass IV Shelf Drilling | Customer undisclosed Nigeria | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Noble BlackRhino Noble | Beacon U.S. Gulf of Mexico | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Noble Endeavor Noble | No current assignment identified South America | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Odin Borr Drilling | No current assignment identified United States | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Prospector 1 Borr Drilling | ONE-Dyas Netherlands | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Ron Tappmeyer Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Sevan Louisiana Seadrill | No Active Assignment Identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Shelf Drilling Achiever Shelf Drilling | Customer undisclosed Nigeria | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Shelf Drilling Enterprise Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Shelf Drilling Fortress Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Shelf Drilling Mentor Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Shelf Drilling Odyssey Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Shelf Drilling Perseverance Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Shelf Drilling Resourceful Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Shelf Drilling Scepter Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Shelf Drilling Tenacious Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Shelf Drilling Winner Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Sif Borr Drilling | Customer undisclosed Suriname | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Sonangol Libongos Sonadrill | Customer undisclosed Angola | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Stena Carron Stena Drilling | Customer undisclosed Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Stena Don Stena Drilling | Customer undisclosed United Kingdom | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Stena Forth Stena Drilling | No Active Assignment Identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Stena IceMAX Stena Drilling | Customer undisclosed Egypt | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Transocean Encourage Transocean | Customer undisclosed Norway | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Transocean Equinox Transocean | Customer undisclosed Australia | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Aug 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| Trident 16 Shelf Drilling | No current assignment identified Region not verified | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |
| VALARIS 117 Valaris | No current assignment identified Trinidad And Tobago | Schedule not disclosed | Customer undisclosed Region not verified | Schedule not disclosed | Contract ending | Gap unknown | watch | schedule unclear | Jul 2026 | EvidenceSource title: Not identified Current evidence: Excerpt not available Next evidence: Excerpt not available Source link unavailable |