SignalSporeOFFSHORE

Arabia I

Borr Drilling · Drilling rig · updated 18 July 2026

Now

What is it doing?
Contracted
For whom?
Petrobras
Where?
Brazil
Until when?
Apr 2029

Next

Next assignment or transition
No follow-on work identified
Options
No follow-on work identified
Downtime
No planned downtime identified

Commercial outlook

Classification
Committed
Estimated usable window
Schedule not disclosed
Confidence
Source-reported

Visual schedule

Petrobras
Brazil
Apr 2025 – Apr 2029
Firm
Evidence
Source document
Borr Drilling Fleet Status Report
Relevant excerpt
Arabia I KFELS B Class 400 ft 2020 Petrobras 3 April - 2025 April - 2029 Brazil Operating with option to extend
Publication date
20 May 2026
Retrieval date
18 July 2026
Confidence
Source-reported
Open source

Technical profile

{
  "design": "KFELS B Class",
  "builder": "Keppel FELS",
  "buildYear": "2020",
  "rigSubtype": "jackup",
  "waterDepth": "400 ft",
  "sourceSection": "Borr Drilling fleet",
  "specificationUrl": "https://api.borrdrilling.com/wp-content/uploads/2024/08/Short-Specification-Arabia-I.pdf"
}

Change history

No SignalSpore-detected market deltas yet. Baseline schedule remains below.

Evidence

Each schedule block links to the official source excerpt supporting that fact.