Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 95 projects. 13 proposal / study · 33 development · 13 launched · 20 demonstrated · 4 operating · 9 historical · 3 uncertain. These are project classifications, not spacecraft counts or verified commercial capacity.
37 projects classified as launched, demonstrated or operating: 29 reviewed, 8 with review limits or awaiting review. Each project appears in one classification.
More filters
Linked view: · D-Orbit · Suppliers and hosts only.
1–25 of 26 relationship records. Each row is one underlying record, including records linked to several projects. Roles and agreement evidence are separate.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| EDGX STERNA orbital-computing demonstrationsEDGX | D-Orbit | Host | Payload integration Booked ION SCV hosting for Wingman, combining hyperspectral imaging, STERNA, MORUS and a relay link. Details & project milestonesBooked ION SCV hosting for Wingman, combining hyperspectral imaging, STERNA, MORUS and a relay link. The undated EDGX mission roadmap books Wingman on D-Orbit ION SCV for October 2027. This is not a launch or benchmark result. Disclosed buyer: Not disclosed. Associated organization: EDGX. EDGX STERNA orbital-computing demonstrations: First payload operational data reported Next project milestone: Verify published orbital test results and progress of the booked 2027 missions. This is a project target, not a supplier delivery commitment. Evidence checked 27 Oct 2026. | Capacity reservedDisclosure date not suppliedSource ↗ |
| KP Labs Antelope orbital demonstrationKP Labs | D-Orbit | Host | Payload integration · Mission operations ION accommodation of KP Labs' Antelope onboard computer/data-processing unit for planned AI/ML telemetry and radiation-anomaly analysis in orbit. Details & project milestonesION accommodation of KP Labs' Antelope onboard computer/data-processing unit for planned AI/ML telemetry and radiation-anomaly analysis in orbit. Carrier launch is reported, while payload deployment, validation and operational computing results remain prospective in this announcement. No procurement price, demonstrated processing throughput or allocation to D-Orbit Nebula is disclosed. Disclosed buyer: Not disclosed. Associated organization: KP Labs. KP Labs Antelope orbital demonstration: Operator-reported in-orbit demonstration Next project milestone: Check material official mission results or changed availability. No additional dated milestone is established. This is a project target, not a supplier delivery commitment. Evidence checked 14 Oct 2026. | Role confirmedSource ↗ |
| KP Labs Intuition-1AAC Clyde Space | D-Orbit | Host | Payload integration · Launch integration ION Cosmic Wander mission accommodation, launch integration and orbital carriage of AAC Clyde Space's Intuition-1 onboard-AI hyperspectral satellite. Details & project milestonesION Cosmic Wander mission accommodation, launch integration and orbital carriage of AAC Clyde Space's Intuition-1 onboard-AI hyperspectral satellite. Carrier launch is reported, while payload deployment, validation and operational computing results remain prospective in this announcement. No procurement price, demonstrated processing throughput or allocation to D-Orbit Nebula is disclosed. The named Intuition-1 payload is linked to its tracked project profile. The profile’s later mission results do not change the evidentiary limits of this November 2023 carrier release. Disclosed buyer: Not disclosed. Associated organization: AAC Clyde Space. KP Labs Intuition-1: Operator-reported orbital demonstration Next project milestone: Check material official mission results or changed availability. No additional dated milestone is established. This is a project target, not a supplier delivery commitment. Evidence checked 27 Oct 2026. | Role confirmedSource ↗ |
| NaviCode CaravelNaviGate S.r.l. | D-Orbit | Host | Payload integration Hosted execution of NaviCode Caravel through D-Orbit's Software In-Orbit Demonstration service on an existing ION onboard computer. Details & project milestonesHosted execution of NaviCode Caravel through D-Orbit's Software In-Orbit Demonstration service on an existing ION onboard computer. Demonstrated hosting role. Specific ION flight, legal purchasing entity and price are undisclosed. No additional spacecraft is counted. Disclosed buyer: Not disclosed. Associated organization: NaviGate S.r.l.. NaviCode Caravel: Reported in-orbit demonstration Next project milestone: Pilot deployments with operators and integrators are being discussed. No dated next deployment is disclosed. This is a project target, not a supplier delivery commitment. Evidence checked 29 Oct 2026. | Role confirmedSource ↗ |
| Planetek AI-eXpressPlanetek Italia | D-Orbit | Host | Payload integration · Mission operations · Data services D-Orbit provides ION hosted-payload accommodation and orbital cloud infrastructure for Planetek-led AI-eXpress. Details & project milestonesD-Orbit provides ION hosted-payload accommodation and orbital cloud infrastructure for Planetek-led AI-eXpress. This is an explicitly identified program, hardware or research role. No legal procurement buyer, contract signature date, paid order, value or guaranteed service level is disclosed. Hosted AIX nodes share ION carriers; they are not an additional independent spacecraft fleet. Disclosed buyer: Not disclosed. Associated organization: Planetek Italia. Planetek AI-eXpress: In-orbit operation demonstrated Next project milestone: No dated next mission milestone disclosed; continued application trials and platform development. This is a project target, not a supplier delivery commitment. Evidence checked 27 Sept 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| Planetek Hellas OPTISATPlanetek Hellas | D-Orbit | Supplier | Unconfirmed scope · Launch integration Launch, deployment and mission integration services for OPTISAT, inferred from D-Orbit’s product offering. Details & project milestonesLaunch, deployment and mission integration services for OPTISAT, inferred from D-Orbit’s product offering. Scope inferred from the supplier’s official portfolio (https://www.dorbit.space/media/1/11.pdf). The OPTISAT release names D-Orbit but does not confirm its individual work package. Exact procurement terms are undisclosed. Disclosed buyer: Not disclosed. Associated organization: Planetek Hellas. Planetek Hellas OPTISAT: Launched experimental mission Next project milestone: Await OPTISAT commissioning and measured SCOT20/onboard-processing results from Planetek Hellas, ESA or TESAT. No dated next milestone disclosed. This is a project target, not a supplier delivery commitment. Evidence checked 8 Oct 2026. | Role confirmedDisclosure date not suppliedSource ↗ |
| Privateer PonoPrivateer | D-Orbit | Host | Payload integration ION hosted the Pono compute-and-communications prototype. Details & project milestonesION hosted the Pono compute-and-communications prototype. Historical flown role. Direct procurement buyer, price and service terms undisclosed. Disclosed buyer: Not disclosed. Associated organization: Privateer. Privateer Pono: Historical launched prototype Next project milestone: Further dated mission and technical results. No confirmed next event date disclosed. This is a project target, not a supplier delivery commitment. Evidence checked 8 Oct 2026. | Role confirmedSource ↗ |
| ROQuET quantum photonic processorUniversity of Vienna | D-Orbit | Host | Payload integration · Mission operations D-Orbit hosted ROQuET on ION SCV Passionate Paula for Skytrail, providing payload power, command execution, timing and data/file exchange through the host flight payload computer. Details & project milestonesD-Orbit hosted ROQuET on ION SCV Passionate Paula for Skytrail, providing payload power, command execution, timing and data/file exchange through the host flight payload computer. This records an explicitly identified, implemented role in the flown research payload; it is not evidence of a separately announced paid contract. The direct legal buyer, contract execution/selection date, price and procurement terms are not disclosed. September 21, 2026 is the paper submission date, not the procurement date. Additional evidence for this same role: https://cdn.sanity.io/files/r5mwia0y/production/c1f3581bb047d1b7e876b0f6bf29889fc747dc29.pdf. The June 24, 2025 carrier release and September 21, 2026 research paper describe the same ROQuET payload on Skytrail. June 24 is the earliest retained hosting disclosure, not a contract date. Disclosed buyer: Not disclosed. Associated organization: University of Vienna. ROQuET quantum photonic processor: In-orbit operation demonstrated Next project milestone: No next mission milestone disclosed in the September 2026 paper. This is a project target, not a supplier delivery commitment. Evidence checked 27 Oct 2026. | Role confirmedSource ↗ |
| TakeMe2Space MOI programTakeMe2Space | D-Orbit | Host | Launch integration ION carrier manifest includes MOI-1A via Impulso Space on Transporter-18. Details & project milestonesION carrier manifest includes MOI-1A via Impulso Space on Transporter-18. Deployment is confirmed by the carrier operator. Contact, commissioning, computing results and direct procurement terms remain undisclosed. Disclosed buyer: Not disclosed. Associated organization: TakeMe2Space. TakeMe2Space MOI program: MOI-1A reported lost. MOI-1B planned. Next project milestone: Operator targets MOI-1B for November 2026. Launch and results remain unconfirmed. The exact date and cause of the MOI-1A loss remain undisclosed. This is a project target, not a supplier delivery commitment. Evidence checked 27 Oct 2026. | Role confirmedSource ↗ |
| No tracked project linkConstellation Technologies & Operations | D-Orbit | Host | Payload integration ION accommodation of the Early Test Payload regenerative 5G mmWave communications demonstration. Details & project milestonesION accommodation of the Early Test Payload regenerative 5G mmWave communications demonstration. Issuer-reported manifested payload and carrier launch, not a separately disclosed procurement contract. Legal buyer, price and signature date are unknown. June 24 is the announcement date and June 23 the launch date. The article does not establish successful payload commissioning or experimental results. Disclosed buyer: Not disclosed. Associated organization: Constellation Technologies & Operations. Evidence checked 13 Oct 2026. | Role confirmedSource ↗ |
| No tracked project linkMagdrive | D-Orbit | Host | Payload integration ION accommodation of Magdrive’s first in-orbit demonstration of the Rogue thruster. Details & project milestonesION accommodation of Magdrive’s first in-orbit demonstration of the Rogue thruster. Issuer-reported manifested payload and carrier launch, not a separately disclosed procurement contract. Legal buyer, price and signature date are unknown. June 24 is the announcement date and June 23 the launch date. The article does not establish successful payload commissioning or experimental results. Disclosed buyer: Not disclosed. Associated organization: Magdrive. Evidence checked 13 Oct 2026. | Role confirmedSource ↗ |
| No tracked project linkPale Blue Inc. | D-Orbit | Host | Payload integration ION accommodation of Pale Blue’s PBI water-ion-thruster demonstration. Details & project milestonesION accommodation of Pale Blue’s PBI water-ion-thruster demonstration. Issuer-reported manifested payload and carrier launch, not a separately disclosed procurement contract. Legal buyer, price and signature date are unknown. June 24 is the announcement date and June 23 the launch date. The article does not establish successful payload commissioning or experimental results. Disclosed buyer: Not disclosed. Associated organization: Pale Blue Inc.. Evidence checked 13 Oct 2026. | Role confirmedSource ↗ |
| No tracked project linkPlan-S Satellite and Space Technologies | D-Orbit | Supplier | Launch integration D-Orbit launch integration for four Plan-S Connecta IoT satellites on two additional Transporter-14 ports, using NPC Spacemind deployers. These four are separate from the two ION vehicles. Details & project milestonesD-Orbit launch integration for four Plan-S Connecta IoT satellites on two additional Transporter-14 ports, using NPC Spacemind deployers. These four are separate from the two ION vehicles. Issuer-reported manifested payload and carrier launch, not a separately disclosed procurement contract. Legal buyer, price and signature date are unknown. June 24 is the announcement date and June 23 the launch date. The article does not establish successful payload commissioning or experimental results. Disclosed buyer: Not disclosed. Associated organization: Plan-S Satellite and Space Technologies. Evidence checked 13 Oct 2026. | Role confirmedSource ↗ |
| No tracked project linkSpire Global | D-Orbit | Supplier | Launch integration Orbital carriage and planned deployment of two Spire-built LEMUR 4U satellites with Lacuna IoT gateways. Details & project milestonesOrbital carriage and planned deployment of two Spire-built LEMUR 4U satellites with Lacuna IoT gateways. Issuer-reported manifested payload and carrier launch, not a separately disclosed procurement contract. Legal buyer, price and signature date are unknown. June 24 is the announcement date and June 23 the launch date. The article does not establish successful payload commissioning or experimental results. Disclosed buyer: Not disclosed. Associated organization: Spire Global. Evidence checked 13 Oct 2026. | Role confirmedSource ↗ |
| No tracked project linkTelePIX | D-Orbit | Host | Payload integration ION accommodation of TelePIX’s DNAV deep-space-navigation processor payload incorporating TetraPLEX. Details & project milestonesION accommodation of TelePIX’s DNAV deep-space-navigation processor payload incorporating TetraPLEX. Issuer-reported manifested payload and carrier launch, not a separately disclosed procurement contract. Legal buyer, price and signature date are unknown. June 24 is the announcement date and June 23 the launch date. The article does not establish successful payload commissioning or experimental results. Disclosed buyer: Not disclosed. Associated organization: TelePIX. Evidence checked 13 Oct 2026. | Role confirmedSource ↗ |
| No tracked project linkDPhi Space | D-Orbit | Supplier | Payload integration · Launch integration ION payload hosting and orbital transport for DPhi Space's Clustergate-1 shared compute platform on the Wish Upon a Star mission. Details & project milestonesION payload hosting and orbital transport for DPhi Space's Clustergate-1 shared compute platform on the Wish Upon a Star mission. The source documents the launched passenger role. It does not disclose a separate contract price or confirm commissioning and operational compute performance. Disclosed buyer: Not disclosed. Associated organization: DPhi Space. Evidence checked 13 Oct 2026. | Role confirmedSource ↗ |
| No tracked project linkTelePIX | D-Orbit | Host | Payload integration · Launch integration · Mission operations Technical launch guidance, transportation, integration into ION and in-orbit demonstration services for two TelePIX Tetraplex onboard-processor missions. Details & project milestonesTechnical launch guidance, transportation, integration into ION and in-orbit demonstration services for two TelePIX Tetraplex onboard-processor missions. The release announces two contracts with a June 2024 mission target; it does not establish completed testing, achieved processor performance, price or an additional contract under discussion. Disclosed buyer: TelePIX. Associated organization: TelePIX. Evidence checked 14 Oct 2026. | Contract / order disclosedSource ↗ |
| No tracked project linkTRL11 | D-Orbit | Host | Payload integration · Mission operations ION Beyond mission accommodation and carriage of TRL11's MI:1 prototype Space Aware Edge Computer for planned in-orbit testing. Details & project milestonesION Beyond mission accommodation and carriage of TRL11's MI:1 prototype Space Aware Edge Computer for planned in-orbit testing. The carrier launch is reported; MI:1 prototype testing remains prospective in this announcement. No disclosed procurement price, achieved edge-computing performance or complete operational service is established. Disclosed buyer: TRL11. Associated organization: TRL11. Evidence checked 14 Oct 2026. | Role confirmedSource ↗ |
| No tracked project linkCryptosat | D-Orbit | Host | Payload integration · Launch integration ION Cosmic Wander accommodation and orbital carriage of Cryptosat's Crypto3 3U cryptographic and edge-computing prototype. Details & project milestonesION Cosmic Wander accommodation and orbital carriage of Cryptosat's Crypto3 3U cryptographic and edge-computing prototype. Carrier launch is reported, while payload deployment, validation and operational computing results remain prospective in this announcement. No procurement price, demonstrated processing throughput or allocation to D-Orbit Nebula is disclosed. Disclosed buyer: Not disclosed. Associated organization: Cryptosat. Evidence checked 14 Oct 2026. | Role confirmedSource ↗ |
| No tracked project linkAgenzia Spaziale italiana (ASI) | D-Orbit | Host | Satellite bus · Launch integration · Data services Manufacture and launch of one ION Satellite Carrier providing the orbital infrastructure to gather and process data for In-Orbit Space Lab. Details & project milestonesManufacture and launch of one ION Satellite Carrier providing the orbital infrastructure to gather and process data for In-Orbit Space Lab. Funded planned orbital infrastructure, not completed flight or measured computing performance. The source distinguishes D-Orbit's approximately USD 5,362,560 (EUR 4.8 million) work package from the approximately USD 7,820,400 (EUR 7 million) overall programme and unrelated IRIDE/servicing awards. No exact mapping to later AI-eXpress missions is asserted. Disclosed buyer: Agenzia Spaziale italiana (ASI). Associated organization: Agenzia Spaziale italiana (ASI). Approximately USD 5,362,560 (EUR 4,800,000). Approximately USD 5,362,560 (EUR 4.8 million) D-Orbit work package; the approximately USD 7,820,400 (EUR 7 million) programme total is separate. Evidence checked 14 Oct 2026. | Contract / order disclosedSource ↗ |
| No tracked project linkELT Group | D-Orbit | Host | Payload integration · Mission operations ION Guardian mission accommodation and carriage of ELT's SCORPIO electronic-intelligence payload, designed for AI-assisted RF categorization and data storage. Details & project milestonesION Guardian mission accommodation and carriage of ELT's SCORPIO electronic-intelligence payload, designed for AI-assisted RF categorization and data storage. Carrier launch is reported, while payload data gathering and AI performance remain intended capabilities in this release. No procurement price, measured throughput or allocation to a later computing constellation is disclosed. Disclosed buyer: Not disclosed. Associated organization: ELT Group. Evidence checked 14 Oct 2026. | Role confirmedSource ↗ |
| No tracked project linkCryptosat | D-Orbit | Host | Payload integration · Launch integration ION Second Star to the Right accommodation and orbital carriage of the enhanced Cryptosat-2 secure-cryptographic prototype. Details & project milestonesION Second Star to the Right accommodation and orbital carriage of the enhanced Cryptosat-2 secure-cryptographic prototype. The two ION carriers were deployed and entered early orbit operations. This release describes intended hosted demonstrations, not completed image-processing or cryptographic test results. The thirteen total payloads are not thirteen computing nodes; no procurement price is disclosed. Disclosed buyer: Not disclosed. Associated organization: Cryptosat. Evidence checked 14 Oct 2026. | Role confirmedSource ↗ |
| No tracked project linkInstituto de Astrofísica de Canarias | D-Orbit | Host | Payload integration · Mission operations ION hosted in-orbit demonstration accommodation for IAC's DRAGO-2 camera and onboard processing unit, supporting image compression, encryption and super-resolution algorithms. Details & project milestonesION hosted in-orbit demonstration accommodation for IAC's DRAGO-2 camera and onboard processing unit, supporting image compression, encryption and super-resolution algorithms. The two ION carriers were deployed and entered early orbit operations. This release describes intended hosted demonstrations, not completed image-processing or cryptographic test results. The thirteen total payloads are not thirteen computing nodes; no procurement price is disclosed. Disclosed buyer: Not disclosed. Associated organization: Instituto de Astrofísica de Canarias. Evidence checked 14 Oct 2026. | Role confirmedSource ↗ |
| No tracked project linkÉcole Polytechnique Fédérale de Lausanne | D-Orbit | Host | Payload integration · Mission operations Integration of EPFL's in-house HOBC onboard computer into ION and hosted in-orbit test/validation on a mid-inclination orbit for the CHESS educational program. Details & project milestonesIntegration of EPFL's in-house HOBC onboard computer into ION and hosted in-orbit test/validation on a mid-inclination orbit for the CHESS educational program. The September 2022 source targets Q1 2023 for launch. It does not establish completed testing, processor performance, price, or assignment to Nebula computing. Disclosed buyer: École Polytechnique Fédérale de Lausanne. Associated organization: École Polytechnique Fédérale de Lausanne. Evidence checked 14 Oct 2026. | Development agreementSource ↗ |
| No tracked project linkKepler Communications | D-Orbit | Supplier | Launch integration · Mission operations ION carriage, launch integration and orbital deployment of two Kepler 6U satellites for Ku/S-band AETHER technology validation. Details & project milestonesION carriage, launch integration and orbital deployment of two Kepler 6U satellites for Ku/S-band AETHER technology validation. The release targets Q1 2023; it does not establish launch completion, technology-validation results, price or assignment to the later Tranche 1 compute fleet. Disclosed buyer: Kepler Communications. Associated organization: Kepler Communications. Evidence checked 14 Oct 2026. | Contract / order disclosedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.