Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving SK hynix Inc. (에스케이하이닉스 주식회사).
1–3 of 3 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| KARI E3T satellite memory and component testsAssociated organization: Korea Aerospace Research Institute (한국항공우주연구원) | SK hynix Inc. (에스케이하이닉스 주식회사) | Supplier | PlannedReported The part was selected for a flight planned for 2027. History & full recordOriginal disclosure: KARI selected SK hynix radiation-tolerant storage for E3T-3. Buyer: Not disclosed. Associated organization: Korea Aerospace Research Institute (한국항공우주연구원). Project profile: KARI E3T satellite memory and component tests Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| KARI E3T satellite memory and component testsAssociated organization: Korea Aerospace Research Institute (한국항공우주연구원) | SK hynix Inc. (에스케이하이닉스 주식회사) | Supplier | PlannedReported KARI named the memory in its preflight plan. The post-launch agency report did not identify the flight memory. History & full recordOriginal disclosure: KARI named SK hynix DRAM and UFS flash storage for the planned E3T-2 test payload. Buyer: Not disclosed. Associated organization: Korea Aerospace Research Institute (한국항공우주연구원). Project profile: KARI E3T satellite memory and component tests Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| KASA / KARI component-validation satellite 3Associated organization: Korea Aerospace Research Institute (한국항공우주연구원) | SK hynix Inc. (에스케이하이닉스 주식회사) | Research participant | Research & feasibility studiesProgress unconfirmed · Disclosure Selected test payload: Radiation-tolerant storage device History & full recordOrbital testing could help developers establish flight experience for Korean satellite components. Buyer: Not disclosed. Associated organization: Korea Aerospace Research Institute (한국항공우주연구원). Project profile: KASA / KARI component-validation satellite 3 Evidence checked 7 Nov 2026. | PartnershipSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.