← All projects South Korea · Satellite component-validation research
KASA / KARI component-validation satellite 3 KASA and KARI selected 15 component types from nine organizations for a planned 12U validation satellite. The payloads include SK hynix radiation-tolerant storage and an AP Satellite test unit for a small exploration-rover processor. The March 2026 announcement targets flight on the sixth Nuri launch in 2027.
KASA / KARI Development Payloads selected, 2027 flight planned
Scope: Enabling research · Named enabling-component research validates storage, processors and other electronics in orbit.
Technical overview · Organizations & responsibilities · Project updates
Technical overview Compare technical specifications →
Configuration: Third domestic component validation satellite, plannedOfficial payload selection
Configuration / deployment 15 component types Selected from nine organizations, not fifteen spacecraft.
Notes & source Configuration: Third domestic component validation satellite, planned
Selected from nine organizations, not fifteen spacecraft.
Evidence basis: Official payload selection
Source / observation date: 2026-11-07 .
Supporting source ↗ Sixth Nuri launch planned in 2027 Notes & source Configuration: Third domestic component validation satellite, planned
March9 2026 plan. Launch and component validation results are not reported.
Evidence basis: Official payload selection
Source / observation date: 2026-11-07 .
Supporting source ↗ Compute hardware AP Satellite intelligent processor-module test unit for a small exploration rover Notes & source Configuration: Third domestic component validation satellite, planned
Test apparatus, not an operational lunar rover or installed exploration mission. Processor model and benchmark not disclosed.
Evidence basis: Official payload selection
Source / observation date: 2026-11-07 .
Supporting source ↗ ETRI seven domestically developed aerospace semiconductor types Notes & source Configuration: Third domestic component validation satellite, planned
Selected test suite. Exact component parts and processing rates not disclosed.
Evidence basis: Official payload selection
Source / observation date: 2026-11-07 .
Supporting source ↗ Korea University 9M-class CMOS image sensor, 3000 by 3000 pixels Notes & source Configuration: Third domestic component validation satellite, planned
Sensor resolution, not computational throughput.
Evidence basis: Official payload selection
Source / observation date: 2026-11-07 .
Supporting source ↗ Memory / storage SK hynix radiation-tolerant storage device Notes & source Configuration: Third domestic component validation satellite, planned
Selected orbital test payload. Capacity, RAM, endurance and storage technology are not specified.
Evidence basis: Official payload selection
Source / observation date: 2026-11-07 .
Supporting source ↗ Physical envelope 12 U Platform size class. Do not derive exact external dimensions from the nominal 1U definition.
Notes & source Configuration: Third domestic component validation satellite, planned
Platform size class. Do not derive exact external dimensions from the nominal 1U definition.
Evidence basis: Official payload selection
Source / observation date: 2026-11-07 .
Supporting source ↗ Other specifications Hanbat DC/DC power converter, LG LEO materials/components, Cosmobee AI Hall-thruster control and atomic-oxygen ion-current module, Daelim Plavis polyimide insulation fasteners, Ilchem non-flammable electrolyte battery Notes & source Configuration: Third domestic component validation satellite, planned
Other selected validation payloads. No numerical power conversion, thermal performance or battery capacity disclosed.
Evidence basis: Official payload selection
Source / observation date: 2026-11-07 .
Supporting source ↗ Explore project relationships →
Figures retain their disclosed units and scope. Launched hardware does not establish demonstrated performance; targets may change. Not disclosed means no figure in the reviewed sources.
Organizations & responsibilities Progress is unconfirmed for all recorded contributions.
Project organizations Programme agency
Selected components with KARI for the planned third component-validation satellite.
Company information KASA coordinates South Korea’s aerospace policy, research and space programmes.
Location Sacheon, South Korea Company information checked 11 Nov 2026 Sources for Korea AeroSpace Administration (KASA) Programme agency
Selected components with KASA for the planned third component-validation satellite.
Company information KARI conducts aerospace research and develops aircraft, satellites and launch systems.
Location Daejeon, South Korea Company information checked 11 Nov 2026 Sources for Korea Aerospace Research Institute (한국항공우주연구원) Research & collaboration Company information AP Satellite develops satellite communications terminals, onboard computers, data recorders, and spacecraft electronics.
Company address Seoul, South Korea Company information checked 16 Nov 2026 Sources for Asia Pacific Satellite Inc. (AP위성 주식회사) Company information Cosmobee develops electric propulsion systems and miniature Hall thrusters for small satellites.
Headquarters Daejeon, South Korea Company information checked 17 Nov 2026 Sources for Cosmobee (코스모비) Company information Daelim manufactures polyimide products and provides petrochemical trading, logistics, and IT services.
Company address Seoul, South Korea Company information checked 17 Nov 2026 Sources for Daelim (대림) Company information ETRI researches information and communications technology, electronics, broadcasting, and related computing systems.
Main office Daejeon, South Korea Company information checked 16 Nov 2026 Sources for Electronics and Telecommunications Research Institute (ETRI) (한국전자통신연구원) Company information Hanbat National University provides education and research in engineering, information technology, and other disciplines.
Campus Daejeon, South Korea Company information checked 16 Nov 2026 Sources for Hanbat National University Company information Ilchem develops lithium battery cells and battery packs for spacecraft and other demanding operating environments.
Company address Anyang, South Korea Company information checked 17 Nov 2026 Sources for Ilchem (일켐) Company information Korea University is a research university with campuses in Seoul and Sejong, South Korea.
Campuses Seoul and Sejong, South Korea Company information checked 16 Nov 2026 Sources for Korea University Company information LG Electronics develops consumer electronics, home appliances, mobility technologies, and business systems.
Headquarters Seoul, South Korea Company information checked 16 Nov 2026 Sources for LG Electronics Company information SK hynix develops and manufactures memory semiconductors, including DRAM, NAND flash, and related storage products.
Headquarters Icheon, South Korea Company information checked 16 Nov 2026 Sources for SK hynix Inc. (에스케이하이닉스 주식회사) NEXT MILESTONE Launch on the sixth Nuri flight planned for 2027, followed by component testing Manual review 23 Nov 2026. KASA selected a storage device and a rover processor test unit for a satellite planned to fly on Nuri in 2027. Primary body last observed not available. Source monitoring: unavailable. Source collection and substantive profile review are separate checks. Plans and dates may change.
KARI / KASA March9 2026 selection and official payload table (opens in a new tab) WHAT REMAINS UNKNOWN Final flight hardware, capacities and processor models Numerical power, thermal limits, mass, orbit and mission duration Subsequent launch completion and validation results Project updates Verified announcements and milestones linked to this project, newest first.
9 Mar 2026 KASA selected 15 component types from nine organizations for a planned 12U satellite. SK hynix will test radiation-tolerant storage, while AP Satellite will provide a processor test unit for small exploration rovers. The March announcement targets a Nuri launch in 2027.