Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving Rogue Space Systems.
1–7 of 7 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| OrbitsEdge SatFrameBuyer: OrbitsEdge | Rogue Space Systems | Supplier | Progress unconfirmed · Disclosure Preliminary ten-year SatFrame constellation inspection, maintenance, transport and refueling collaboration. History & full recordHistorical LOI, not a firm servicing order or evidence of delivered work. The late-2023 operations forecast has elapsed. Ten years describes the proposed service term, not spacecraft design life. Buyer: OrbitsEdge. Associated organization: OrbitsEdge. Project profile: OrbitsEdge SatFrame Evidence checked 2 Nov 2026. | Preliminary agreementSource ↗ |
| Rogue Scalable Compute PlatformBuyer: Mission Space | Rogue Space Systems | Host | Data services PlannedReported Mission Space plans to process space-weather measurements aboard the upcoming OTP-2B platform. History & full recordOriginal disclosure: Rogue OTP-2B computing and payload hosting for Mission Space’s onboard space-weather data processing. The source establishes the stated role and stage. No purchase value is disclosed. Buyer: Mission Space. Project profile: Rogue Scalable Compute Platform Evidence checked 18 Nov 2026. | PartnershipSource ↗ |
| Rogue Scalable Compute PlatformBuyer: Rogue Space Systems | NVIDIA | Supplier | Processors / accelerators PlannedReported Rogue identifies NVIDIA GPU/CPU architecture for the upcoming Gen 3 platform, with no chip model or delivery result stated. History & full recordOriginal disclosure: NVIDIA GPU/CPU architecture named for Rogue’s planned Gen 3 Space Computing Platform aboard OTP-2B. Named architecture contribution. No procurement order, exact processor configuration or payment is disclosed. Buyer: Rogue Space Systems. Project profile: Rogue Scalable Compute Platform Evidence checked 18 Nov 2026. | Role confirmedSource ↗ |
| Rogue Scalable Compute PlatformSatlyt federated satellite computingAssociated organization: Satlyt Inc. | Rogue Space Systems | Host | Payload integration · Data servicesProgress unconfirmed · Disclosure Rogue OTP-2 and OTP-2B compute-platform access and hosting for Satlyt AI orchestration, autonomous operations and data-optimization testing. History & full recordOTP-2 is the existing second-generation platform; OTP-2B and its third-generation GPU/storage/networking platform remain planned. This is one two-platform collaboration. No disclosed purchase value, verified clustered compute network or completed OTP-2B flight is established. Buyer: Not disclosed. Associated organization: Satlyt Inc.. Project profile: Rogue Scalable Compute Platform Project profile: Satlyt federated satellite computing Evidence checked 14 Oct 2026. | PartnershipSource ↗ |
| Rogue Scalable Compute PlatformBuyer: Rogue Space Systems | SpaceX | Supplier | Launch capacity LaunchedReport date unconfirmed SpaceX’s Transporter-13 flight carried OTP-2 into sun-synchronous orbit on March 14, 2025. History & full recordOriginal disclosure: SpaceX launched Rogue’s OTP-2 computing spacecraft on the Transporter-13 rideshare on March 14, 2025. Rogue identifies the launch provider and mission. Buyer: Rogue Space Systems. Project profile: Rogue Scalable Compute Platform Evidence checked 25 Nov 2026. | Role confirmedDisclosure date not suppliedSource ↗ |
| Rogue Scalable Compute PlatformBuyer: Rogue Space Systems | SpaceX | Supplier | Launch capacity PlannedReport date unconfirmed Rogue’s current mission page targets a Falcon 9 launch in the first quarter of 2027. History & full recordOriginal disclosure: Planned SpaceX Falcon 9 launch of Rogue’s OTP-2B computing spacecraft into sun-synchronous orbit. The source establishes the stated role and stage. No purchase value is disclosed. Buyer: Rogue Space Systems. Project profile: Rogue Scalable Compute Platform Evidence checked 18 Nov 2026. | Role confirmedDisclosure date not suppliedSource ↗ |
| Rogue Space SystemsBuyerCompany-level relationship | SPACEWERX | Programme funding contributor | Research & feasibility studies In developmentReported Rogue reported the full USD2 million obligated at award with a 24-month performance period. History & full recordOriginal disclosure: SpaceWERX USD2 million RDT&E SBIR TACFI contract modification supporting Rogue over a 24-month performance period. The USD4 million potential programme total includes private funding and is not another awarded USD4 million. No allocation to a named computing mission is established. Buyer: Rogue Space Systems. Evidence checked 18 Nov 2026. | Contract awardedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.