SignalSpore

SPACE DATA CENTERS
SUPPLIER INTELLIGENCE

SPACE COMPUTINGOrbital and lunar data centers
PROJECT COMPARISON

Space Data Centers Database

Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.

Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.

67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.

Which space data center projects have launched?

PROJECTS & RELATIONSHIPS

Compare the work behind each project.

Market & supply chainFinancingSuppliers
0 projects matching0 with supplier records0 no supplier record
Relationship filters

Linked view: · All relationships involving MBRYONICS.

1–3 of 3 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.

Projects, organizations, roles, scope, commitment and supporting evidence.
Project / associated organizationOrganizationRoleComponent / service scopeCommitment / supporting evidence
MBRYONICSBuyerCompany-level relationshipPilot PhotonicsCommunicationsSupplierOptical links
In developmentReported

The companies report integration of Pilot Photonics’ tunable lasers into MBRYONICS’ coherent space-transceiver architecture.

History & full record

Original disclosure: Fast-switching, low-linewidth tunable lasers for MBRYONICS’ hardened coherent optical transceiver architecture, supporting optical Doppler compensation. The release describes a 25G–800G bidirectional design and terabit-class ambitions.

The release body is dated June15,2026, while the page heading is October22,2026. Its communication figures describe the transceiver design, without an achieved orbital data rate or a named spacecraft configuration.

Buyer: MBRYONICS.

Associated organization: MBRYONICS.

Evidence checked 19 Nov 2026.

Role confirmedSource ↗
NTT, Inc. (NTT株式会社)BuyerCompany-level relationshipMBRYONICSResearch participantOptical links · Research & feasibility studiesProgress unconfirmed · Disclosure

Joint studies and business development for space optical communications. MBRYONICS is to develop transceiver modules incorporating NTT digital coherent technology for future integration into multiple vendors' optical…

History & full record

Joint studies and business development for space optical communications. MBRYONICS is to develop transceiver modules incorporating NTT digital coherent technology for future integration into multiple vendors' optical terminals.

The MoU was signed June 3 and disclosed June 4, 2026. Module development, vendor integration and the projected speed improvement remain future work. No purchase value, firm flight assignment or achieved performance is disclosed.

Buyer: NTT, Inc. (NTT株式会社).

Associated organization: NTT, Inc. (NTT株式会社).

Evidence checked 13 Oct 2026.

Preliminary agreementSource ↗
Kepler CommunicationsAssociated organizationCompany-level relationshipMBRYONICSCommunicationsOperationsSupplierOptical links · Ground stations & ground segmentProgress unconfirmed · Disclosure

StarCom optical terminal and ground-station testbed selected for HydRON Element 3 interoperability demonstrations.

History & full record

Kepler leads the ESA programme team. The source does not identify MBRYONICS' legal purchaser or supplier allocation of the reported USD 21,910,800 (EUR 18.6 million) programme award. Demonstrations and terabit network capacity remain prospective.

Buyer: Not disclosed.

Associated organization: Kepler Communications.

Evidence checked 13 Oct 2026.

Role confirmedSource ↗
Supplier work coverage by category

Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.

Component / serviceContract awardedSupplier selectedDevelopment agreementLaunch capacity reservedPreliminary agreementPartnershipAny supplierNo supplier
Power
↳ Electrical power system
↳ Batteries
↳ Solar arrays
Spacecraft & integration
↳ Satellite bus
↳ Payload integration
Compute & storage
↳ Storage payload
↳ Processors / accelerators
↳ Photonic computing components
Thermal control
↳ Radiators / cooling
Communications
↳ Optical links
Launch
↳ Launch capacity
↳ Launch integration
Operations
↳ Mission operations
↳ Ground stations & ground segment
↳ Deployable structures
↳ Payload industrial design
↳ Flight / payload software
↳ Data services
↳ Electric propulsion
↳ Avionics / integrated electronics
↳ In-space manufacturing
↳ Spacecraft protection systems
↳ Attitude control components
Sensors & monitoring
↳ Radiation sensors
↳ Lunar payload delivery
Commercial services
↳ Cloud capacity & advisory
↳ Technical training & capability transfer
Research & feasibility studies

Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.