Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving KSAT (Kongsberg Satellite Services).
1–14 of 14 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| ERMIS satellite data processing and laser linksAssociated organization: National and Kapodistrian University of Athens (Εθνικόν και Καποδιστριακόν Πανεπιστήμιον Αθηνών) | KSAT (Kongsberg Satellite Services) | Supplier | PlannedReported The approved plan calls for 200 Mbps radio reception at Svalbard. History & full recordOriginal disclosure: The University of Athens selected KSAT’s Svalbard station for the planned ERMIS-3 X-band data link. Buyer: Not disclosed. Associated organization: National and Kapodistrian University of Athens (Εθνικόν και Καποδιστριακόν Πανεπιστήμιον Αθηνών). Project profile: ERMIS satellite data processing and laser links Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| ESA Φsat-2Associated organization: European Space Agency (ESA) | KSAT (Kongsberg Satellite Services) | Supplier | Ground stations & ground segment In operationReported KSAT provided Φsat-2 ground-station services, mainly from Svalbard, during the science-data phase reported in July 2025. History & full recordOriginal disclosure: Φsat-2: Ground-station service, mainly Svalbard Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: ESA Φsat-2 Evidence checked 5 Nov 2026. | Role confirmedSource ↗ |
| HyperionAssociated organization: KSAT (Kongsberg Satellite Services) | Unibap | Supplier | Processors / accelerators Delivered / integratedReported Unibap reported that it delivered the first iX20 computer to KSAT for integration. The agreement covers the first two Hyperion satellites. Progress source ↗History & full recordOriginal disclosure: iX20 edge-computing flight units for the first two Hyperion satellites; first unit delivered for integration. Agreement signed in May 2026 and disclosed in August; price and legal buyer are unspecified. In-orbit services and further joint business remain prospective. Buyer: Not disclosed. Associated organization: KSAT (Kongsberg Satellite Services). Project profile: Hyperion Evidence checked 28 Sept 2026. | Development agreementSource ↗ |
| HyperionAssociated organization: KSAT (Kongsberg Satellite Services) | National Oceanic and Atmospheric Administration (NOAA) | Research participant | Communications · Research & feasibility studiesProgress unconfirmed · Disclosure Planned operational demonstration of bidirectional communications and payload-data relay over Ka-band using HYPER. History & full recordNOAA is a demonstration partner. This is not an announced procurement value or evidence that commercial service has begun. Buyer: Not disclosed. Associated organization: KSAT (Kongsberg Satellite Services). Project profile: Hyperion Evidence checked 20 Oct 2026. | PartnershipSource ↗ |
| HyperionAssociated organization: KSAT (Kongsberg Satellite Services) | Rocket Lab | Supplier | Optical linksProgress unconfirmed · Disclosure Rocket Lab, including acquired Mynaric optical terminals selected for the Hyperion pathfinder's optical relay and inter-satellite communications demonstrations. History & full recordKSAT describes planned terminal carriage and demonstrations. Contract value, terminal quantity and in-orbit service are not established. Buyer: Not disclosed. Associated organization: KSAT (Kongsberg Satellite Services). Project profile: Hyperion Evidence checked 20 Oct 2026. | Role confirmedSource ↗ |
| HyperionAssociated organization: KSAT (Kongsberg Satellite Services) | Sony Space Communications Corp. (SSCC) | Supplier | Optical linksProgress unconfirmed · Disclosure Sony Space Communications Corp. optical terminals selected for the Hyperion pathfinder's optical relay and inter-satellite communications demonstrations. History & full recordKSAT describes planned terminal carriage and demonstrations. Contract value, terminal quantity and in-orbit service are not established. Buyer: Not disclosed. Associated organization: KSAT (Kongsberg Satellite Services). Project profile: Hyperion Evidence checked 20 Oct 2026. | Role confirmedSource ↗ |
| HyperionBuyer: KSAT (Kongsberg Satellite Services) | SpaceX | Supplier | Progress unconfirmed · Disclosure Launch for the first Hyper satellites, identified by KSAT as the Hyperion demonstration mission. History & full recordKSAT confirms the signed launch contract and a late-2027 target; contract value and exact launch date are not disclosed. Hyperion association is explicitly corroborated in KSAT’s June 2026 account. Buyer: KSAT (Kongsberg Satellite Services). Project profile: Hyperion Evidence checked 28 Sept 2026. | Contract / order disclosedSource ↗ |
| NASA Starling distributed computing demonstrationAssociated organization: NASA | KSAT (Kongsberg Satellite Services) | Supplier | Ground stations & ground segment In operationReport date unconfirmed NASA identifies the KSAT-Lite stations at Svalbard and Awarua as Starling’s S-band ground connections. History & full recordOriginal disclosure: Provided KSAT-Lite ground stations for Starling’s S-band spacecraft links. Buyer: Not disclosed. Associated organization: NASA. Project profile: NASA Starling distributed computing demonstration Evidence checked 27 Nov 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| KSAT (Kongsberg Satellite Services)Associated organizationCompany-level relationship | European Space Agency (ESA) | Strategic partner | Progress unconfirmed · Disclosure ESA will contribute infrastructure and operations support for KSAT’s planned lunar communications site near ESA’s Cebreros station. History & full recordThe station is planned. Buyer: Not disclosed. Associated organization: KSAT (Kongsberg Satellite Services). Evidence checked 28 Nov 2026. | PartnershipSource ↗ |
| KSAT (Kongsberg Satellite Services)Associated organizationCompany-level relationship | Instituto Nacional de Técnica Aeroespacial Esteban Terradas (INTA) | Strategic partner | Progress unconfirmed · Disclosure Spain’s INTA will help define and provide the Cebreros site and contribute operational support for KSAT’s lunar communications station. History & full recordThe station is planned. Buyer: Not disclosed. Associated organization: KSAT (Kongsberg Satellite Services). Evidence checked 28 Nov 2026. | PartnershipSource ↗ |
| XoopleBuyerCompany-level relationship | KSAT (Kongsberg Satellite Services) | Supplier | Ground stations & ground segmentProgress unconfirmed · Disclosure KSATlite ground-network service for the deployment and operation of Xoople’s satellite constellation, including new ground-station sites, faster ground-to-cloud delivery and automation endpoints. History & full recordThe partnership is signed and the ground service is selected. Xoople constellation deployment, new sites and enhanced ground-to-cloud/automation services remain planned or in development. Contract value, satellite count, deployment schedule and measured customer latency are undisclosed. The existing network contact-success figure is not a new Xoople mission performance result. Additional evidence for this same role: https://www.xoople.com/resources/ksat-and-xoople-partner-on-ground-network-for-xoople-constellation/. KSAT and Xoople published the same October 5, 2026 partnership and ground-service selection. A second procurement is not established. Buyer: Xoople. Associated organization: Xoople. Evidence checked 27 Oct 2026. | PartnershipSource ↗ |
| Intuitive MachinesBuyerAssociated organization: NASACompany-level relationship | KSAT (Kongsberg Satellite Services) | Supplier | Mission operations · Ground stations & ground segmentProgress unconfirmed · Disclosure Global ground-station services and spacecraft operations for Intuitive Machines’ IM 300 spacecraft carrying NASA JPL’s EAGLE VSWIR instrument. History & full recordKSAT reports selection and a partnership for a mission currently scheduled to launch in 2028. No contract value, exact launch date, procurement instrument or completed mission operations are disclosed. Intuitive Machines is the selecting counterparty; no separate direct NASA-to-KSAT award is inferred. Buyer: Intuitive Machines. Associated organization: NASA. Evidence checked 11 Oct 2026. | Role confirmedSource ↗ |
| KSAT (Kongsberg Satellite Services)BuyerCompany-level relationship | CPI Vertex Antennentechnik GmbH | Supplier | Ground stations & ground segmentProgress unconfirmed · Disclosure Supply of antennas for KSAT Lunar, a planned network of three 20-meter X-/Ka-band stations in the United States, Spain and Western Australia. History & full recordSource confirms supplier selection, not a newly dated signature or completed delivery of all three antennas. Contract value and individual delivery dates are undisclosed. September 2 is the announcement date. Near-continuous coverage and full mission-phase service are design aims; installation of a reflector does not establish network-wide operation. Buyer: KSAT (Kongsberg Satellite Services). Associated organization: KSAT (Kongsberg Satellite Services). Evidence checked 12 Oct 2026. | Role confirmedSource ↗ |
| KSAT (Kongsberg Satellite Services)BuyerCompany-level relationship | Starsite Pty Ltd | Strategic partner | Ground stations & ground segmentProgress unconfirmed · Disclosure Partnership to establish the Western Australian ground-station site in the KSAT Lunar communications network. History & full recordSource confirms a site-establishment partnership, without stating a priced procurement, land ownership transfer, completed commissioning or exact partnership-signing date. September 2 is the announcement date. Near-continuous coverage and full mission-phase service are design aims; installation of a reflector does not establish network-wide operation. Buyer: KSAT (Kongsberg Satellite Services). Associated organization: KSAT (Kongsberg Satellite Services). Evidence checked 12 Oct 2026. | PartnershipSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.