SignalSpore

SPACE DATA CENTERS
SUPPLIER INTELLIGENCE

SPACE COMPUTINGOrbital and lunar data centers
← All projects

United States · Distributed computing flight research

NASA Starling distributed computing demonstration

NASA launched four Starling CubeSats in July 2023 to test how satellites can work together without waiting for instructions from Earth. The satellites processed observations on board and shared them to make joint decisions. A later test showed that the same satellites could transfer files even when their network went offline.

NASADemonstratedDistributed computing demonstrated in orbit

Scope: Enabling research · The four satellites tested software and communications for future missions that use several spacecraft together.

Technical overview

Compare technical specifications →

Configuration / deployment
4 CubeSatsFour Starling spacecraft

Four flight spacecraft. The extension used the same fleet.

Launched fleet
Notes & source

Configuration: Four Starling spacecraft

Four flight spacecraft. The extension used the same fleet.

Evidence basis: Launched fleet

Source / observation date: .

Supporting source ↗
Compute hardware
Dedicated experiment processor separate from the spacecraft busFour Starling spacecraftNASA flight configuration
Notes & source

Configuration: Four Starling spacecraft

NASA identifies the separate processor for payload experiments. Processor model and memory were not stated.

Evidence basis: NASA flight configuration

Source / observation date: .

Supporting source ↗
Orbit / altitude
572–575 kmFour Starling spacecraft

NASA gives the initial average altitudes for the four spacecraft after separation into Sun-synchronous orbit.

NASA mission team’s report of initial average altitudes
Notes & source

Configuration: Four Starling spacecraft

NASA gives the initial average altitudes for the four spacecraft after separation into Sun-synchronous orbit.

Evidence basis: NASA mission team’s report of initial average altitudes

Source / observation date: .

Supporting source ↗
Ground communications
S-band ground links through KSAT-Lite and a separate Globalstar beaconFour Starling spacecraftNASA mission communications description
Notes & source

Configuration: Four Starling spacecraft

The S-band ground link carries spacecraft traffic. The Globalstar beacon is a separate service.

Evidence basis: NASA mission communications description

Source / observation date: .

Supporting source ↗
Inter-satellite communications
S-band links between satellites using CesiumAstro radiosFour Starling spacecraftNASA mission communications description
Notes & source

Configuration: Four Starling spacecraft

The inter-satellite network is separate from the ground communications.

Evidence basis: NASA mission communications description

Source / observation date: .

Supporting source ↗
10 MB test fileStarling 1.5 flight tests

NASA repeatedly transferred a 10 MB file while recovering from interruptions that lasted an hour. This is a file size.

Reported flight workload
Notes & source

Configuration: Starling 1.5 flight tests

NASA repeatedly transferred a 10 MB file while recovering from interruptions that lasted an hour. This is a file size.

Evidence basis: Reported flight workload

Source / observation date: .

Supporting source ↗
Physical envelope
6U CubeSat with Blue Canyon XB1 spacecraft busFour Starling spacecraftNASA description of flight hardware
Notes & source

Configuration: Four Starling spacecraft

NASA assigns 2U to the Blue Canyon XB1 bus and 2U to the payload. The supplier describes the whole delivered platform as XB6.

Evidence basis: NASA description of flight hardware

Source / observation date: .

Supporting source ↗
Other specifications
Onboard ionosphere measurements with distributed decisions across the spacecraftFour Starling spacecraftReported flight demonstration
Notes & source

Configuration: Four Starling spacecraft

The satellites exchanged results, shared state and coordinated changes to what they measured.

Evidence basis: Reported flight demonstration

Source / observation date: .

Supporting source ↗
Onboard ionosphere processing with measurement corrections and a data-quality estimateStarling 1.5 flight testsReported flight demonstration
Notes & source

Configuration: Starling 1.5 flight tests

The extended test improved the science product computed aboard the spacecraft and used its quality estimate in decision-making.

Evidence basis: Reported flight demonstration

Source / observation date: .

Supporting source ↗
NASA’s PLEXIL software controlled the link radios in flightStarling 1.5 flight testsReported flight demonstration
Notes & source

Configuration: Starling 1.5 flight tests

The flight software turned the crosslink network off and back on during the test.

Evidence basis: Reported flight demonstration

Source / observation date: .

Supporting source ↗

Explore project relationships →

Figures retain their disclosed units and scope. Launched hardware does not establish demonstrated performance; targets may change. Not disclosed means no figure in the reviewed sources.

Organizations & responsibilities

Progress describes the recorded contribution as of its cited report.

Project organizations

Suppliers & hosts

Partnership
LaunchedReported

All four Starling spacecraft launched on Electron on July 18 UTC.

Full record & sources for Rocket Lab

Original disclosure · 18 Jul 2023: Launched the four Starling CubeSats together on the Electron rideshare called Baby Come Back.

Associated organization: NASA

Project profile: NASA Starling distributed computing demonstration

View this relationship on the organization profile →

Source checked 27 Nov 2026.

Progress reviewed 27 Nov 2026.

Baby Come Back ↗
Company information

Rocket Lab develops launch vehicles, spacecraft and satellite components.

Location
Long Beach, United States
Company information checked
Sources for Rocket Lab
Partnership
LaunchedReported

The four BCT spacecraft platforms launched together on Electron and supported the primary tests.

Full record & sources for Blue Canyon Technologies

Original disclosure · 17 Jul 2023: Built the four Starling spacecraft buses and supported bus operations for NASA.

Associated organization: NASA

Project profile: NASA Starling distributed computing demonstration

View this relationship on the organization profile →

Source checked 27 Nov 2026.

Progress reviewed 27 Nov 2026. Baby Come Back ↗

It’s Launch Day for NASA’s Starling Mission! ↗
Company information

Blue Canyon Technologies builds small spacecraft and components and provides mission operations services.

Location
Lafayette, Colorado, United States
Parent company
MDA Space

CesiumAstro

SupplierCategory not recorded
Company information

CesiumAstro develops software-defined communications systems, satellite platforms and computing systems for space and defence.

Headquarters
Bee Cave, United States
Partnership
Delivered / integratedReport date unconfirmed

NASA identified the cluster management software as Emergent’s contribution.

Full record & sources for Emergent Space Technologies

Original disclosure: Provided software to manage the Starling satellite group. York Space Systems acquired Emergent before Starling launched.

Associated organization: NASA

Project profile: NASA Starling distributed computing demonstration

View this relationship on the organization profile →

Source checked 27 Nov 2026.

Progress reviewed 27 Nov 2026.

Starling Swarm Mission – Technology Objectives, Status and Future Applications ↗
Company information

Emergent Space Technologies developed flight and ground software for missions that use several spacecraft.

Historical headquarters
Laurel, Maryland, United States
Acquired by
York Space Systems
Company information checked
Sources for Emergent Space Technologies
Company information

KSAT provides satellite ground station networks and communications services.

Location
Tromsø, Norway
Company information checked
Sources for KSAT (Kongsberg Satellite Services)

L3Harris Technologies

SupplierCategory not recorded
Partnership
Delivered / integratedReport date unconfirmed

NASA identifies L3Harris as the provider of Starling’s flight dynamics ground software.

Full record & sources for L3Harris Technologies

Original disclosure: Provided ground software for flight dynamics for the Starling spacecraft group.

Associated organization: NASA

Project profile: NASA Starling distributed computing demonstration

View this relationship on the organization profile →

Source checked 27 Nov 2026.

Progress reviewed 27 Nov 2026.

Starling Swarm Mission – Technology Objectives, Status and Future Applications ↗
Company information

L3Harris develops communications, sensing and aerospace technology.

Headquarters
Melbourne, United States
Company information checked
Sources for L3Harris Technologies
NEXT MILESTONE

No further Starling computing test scheduled in the reviewed NASA releases.

Manual review 27 Nov 2026. NASA reported that four Starling spacecraft shared observations and computing work. Their follow-up tests transferred files across interruptions in the links between satellites. Primary body last observed not available. Source monitoring: blocked. Source collection and substantive profile review are separate checks. Plans and dates may change.

NASA Starling mission (opens in a new tab)
WHAT REMAINS UNKNOWN
  • Installed processor models and memory or storage capacities
  • Electrical power, thermal limits and measured throughput for the computing payload
  • The date of any further Starling computing test

Project updates

Verified announcements and milestones linked to this project, newest first.