Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving Intuitive Machines.
1–3 of 3 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| Lonestar data centersBuyer: Lonestar Data Holdings | Intuitive Machines | Supplier | Lunar payload deliveryProgress unconfirmed · Disclosure Lunar payload delivery and service testing on IM-1 and delivery of Lonestar's first full data-services payload on IM-2. History & full recordThe source confirms contracts for the first two lunar missions but does not disclose values, detailed deliverables or later schedule changes. Buyer: Lonestar Data Holdings. Project profile: Lonestar data centers Evidence checked 24 Sept 2026. | Contract / order disclosedSource ↗ |
| Lunar Voyage 2 rover computingAssociated organization: Johns Hopkins University Applied Physics Laboratory | Intuitive Machines | Host | Lunar payload delivery PlannedReport date unconfirmed NASA lists an early 2027 launch for the IM-3 mission that carries Lunar Vertex. Progress source ↗History & full recordOriginal disclosure: Intuitive Machines’ Nova-C lander will carry the Lunar Vertex rover to Reiner Gamma as part of NASA’s IM-3 delivery. Buyer: Not disclosed. Associated organization: Johns Hopkins University Applied Physics Laboratory. Project profile: Lunar Voyage 2 rover computing Evidence checked 24 Nov 2026. | Contract / order disclosedDisclosure date not suppliedSource ↗ |
| Intuitive MachinesBuyerAssociated organization: NASACompany-level relationship | KSAT (Kongsberg Satellite Services) | Supplier | Mission operations · Ground stations & ground segmentProgress unconfirmed · Disclosure Global ground-station services and spacecraft operations for Intuitive Machines’ IM 300 spacecraft carrying NASA JPL’s EAGLE VSWIR instrument. History & full recordKSAT reports selection and a partnership for a mission currently scheduled to launch in 2028. No contract value, exact launch date, procurement instrument or completed mission operations are disclosed. Intuitive Machines is the selecting counterparty; no separate direct NASA-to-KSAT award is inferred. Buyer: Intuitive Machines. Associated organization: NASA. Evidence checked 11 Oct 2026. | Role confirmedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.