Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving Astrobotic Technology.
1–10 of 10 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| BEACON CubeRover lunar AI demonstrationHPE Spaceborne Computer-4Associated organization: Astrobotic Technology | NASA Jet Propulsion Laboratory (JPL) | Programme support | Work completedReported NASA reported Griffin-1 had completed its environmental tests at JPL. History & full recordOriginal disclosure: NASA’s Jet Propulsion Laboratory provided facilities and support for Griffin-1’s environmental tests before launch. Buyer: Not disclosed. Associated organization: Astrobotic Technology. Project profile: BEACON CubeRover lunar AI demonstration Project profile: HPE Spaceborne Computer-4 Evidence checked 28 Nov 2026. | PartnershipSource ↗ |
| BEACON CubeRover lunar AI demonstrationHPE Spaceborne Computer-4Associated organization: Astrobotic Technology | SpaceX | Supplier | PlannedReported NASA lists Falcon Heavy for the planned Griffin-1 launch. History & full recordOriginal disclosure: NASA names SpaceX’s Falcon Heavy for Griffin-1, which is planned to carry both the FLIP and BEACON lunar rovers. Buyer: Not disclosed. Associated organization: Astrobotic Technology. Project profile: BEACON CubeRover lunar AI demonstration Project profile: HPE Spaceborne Computer-4 Evidence checked 28 Nov 2026. | PartnershipSource ↗ |
| BEACON CubeRover lunar AI demonstrationAssociated organization: Mission Control Space Services Inc. | Astrobotic Technology | Host | Payload integration · Lunar payload deliveryProgress unconfirmed · Disclosure CubeRover-1 rover and Griffin-1 mission hosting for the joint BEACON demonstration. History & full recordShared lander with FLIP/SBC-4. Integration is not a lunar deployment or additional Griffin spacecraft. Buyer: Not disclosed. Associated organization: Mission Control Space Services Inc.. Project profile: BEACON CubeRover lunar AI demonstration Evidence checked 31 Oct 2026. | PartnershipSource ↗ |
| BEACON CubeRover lunar AI demonstrationAssociated organization: NASA | Astrobotic Technology | Research participant | Progress unconfirmed · Disclosure NASA SBIR selection for CubeRover-1 lunar mobility-as-a-service demonstration. History & full recordMission-linked research support, exact award value/date/ID unspecified. Product-line historical totals not assigned here. Buyer: Not disclosed. Associated organization: NASA. Project profile: BEACON CubeRover lunar AI demonstration Evidence checked 31 Oct 2026. | PartnershipSource ↗ |
| BEACON CubeRover lunar AI demonstrationAssociated organization: Astrobotic Technology | Mission Control Space Services Inc. | Supplier | Mission operationsProgress unconfirmed · Disclosure Three-year Spacefarer license for Astrobotic’s joint lunar rover demonstration, providing web-based commanding and monitoring, alongside planned Spacefarer AI research. History & full recordThe release carries an April 8, 2024 dateline and describes the three-year licensing period. Buyer: Not disclosed. Associated organization: Astrobotic Technology. Project profile: BEACON CubeRover lunar AI demonstration Evidence checked 6 Nov 2026. | Development agreementSource ↗ |
| Bronco Space MoonFALLAssociated organization: Bronco Space Lab | Astrobotic Technology | Host | Work completedReport date unconfirmed Astrobotic flew MoonFALL over its simulated lunar test field in California. History & full recordOriginal disclosure: Astrobotic flew Bronco Space Lab’s MoonFALL prototype on Xodiac over simulated lunar terrain in Mojave. Earth-based research test. Buyer: Not disclosed. Associated organization: Bronco Space Lab. Project profile: Bronco Space MoonFALL Evidence checked 25 Nov 2026. | Role confirmedDisclosure date not suppliedSource ↗ |
| Falcon ExoDynamics LITTLE OWLAssociated organization: Falcon ExoDynamics | Astrobotic Technology | Host | DemonstratedReported Astrobotic took the LITTLE OWL detector up on Xodiac for its night test over the simulated lunar surface in Mojave. Progress source ↗History & full recordOriginal disclosure: Astrobotic carried the LITTLE OWL detector on Xodiac and provided the simulated lunar test site in Mojave. Earth-based research test. Buyer: Not disclosed. Associated organization: Falcon ExoDynamics. Project profile: Falcon ExoDynamics LITTLE OWL Evidence checked 25 Nov 2026. | Role confirmedDisclosure date not suppliedSource ↗ |
| HPE Spaceborne Computer-4Associated organization: Hewlett Packard Enterprise | Astrobotic Technology | Host | Lunar payload deliveryProgress unconfirmed · Disclosure Griffin-1 lander transport for Astrolab FLIP, which carries HPE Spaceborne Computer-4. History & full recordPlanned shared mission-host chain, corroborated by Astrobotic June15 lander and manifest accounts. No direct HPE procurement order or price disclosed. HPE calls the lander Voyager Technologies Griffin-1, Astrobotic identifies its operating mission. Buyer: Not disclosed. Associated organization: Hewlett Packard Enterprise. Project profile: HPE Spaceborne Computer-4 Evidence checked 31 Oct 2026. | PartnershipSource ↗ |
| Stottler Henke SAFIRE lunar fault diagnosis researchAssociated organization: Stottler Henke Associates | Astrobotic Technology | Research participant | PlannedReported Stottler Henke plans to test its diagnostic software on simulations of Astrobotic’s lunar power system and rover. History & full recordOriginal disclosure: The selected proposal names Astrobotic as a subcontractor for the SAFIRE study, which plans to test fault diagnosis on simulations of LunaGrid and CubeRover. Buyer: Not disclosed. Associated organization: Stottler Henke Associates. Project profile: Stottler Henke SAFIRE lunar fault diagnosis research Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| USF A-LiST lunar landing mapperAssociated organization: University of South Florida Institute of Applied Engineering | Astrobotic Technology | Host | Work completedReport date unconfirmed Astrobotic flew A-LiST over its simulated lunar test field in California. History & full recordOriginal disclosure: Astrobotic carried the University of South Florida’s A-LiST prototype on Xodiac over simulated lunar terrain in Mojave. Earth-based research test. Buyer: Not disclosed. Associated organization: University of South Florida Institute of Applied Engineering. Project profile: USF A-LiST lunar landing mapper Evidence checked 25 Nov 2026. | Role confirmedDisclosure date not suppliedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.