Luxembourg · Satellite network with onboard computing and storage

SES meoSphere

SES plans a network in medium Earth orbit for broadband, onboard data processing and storage, and data relay for customers including space data centers. K2 Space is supplying the first 28 satellite platforms. A pathfinder hosted on K2’s Gravitas satellite exchanged video with a ground station over a two-way laser link.

SESDevelopmentNetwork in development, pathfinder laser link tested

Scope: Shared computing & storage · SES plans the network to serve multiple customers with communications, data processing, and storage.

Technical overview

Compare technical specifications →

Configuration / deployment
28 satellitesmeoSphere first production phase

Four inclined orbital planes with seven satellites each.

Planned design
Notes & source

Configuration: meoSphere first production phase

Four inclined orbital planes with seven satellites each.

Evidence basis: Planned design

Source / observation date: .

Supporting source ↗
SES test payload hosted on K2 Space’s Gravitas satellitePathfinder 1 optical payload on GravitasReported in-orbit test
Notes & source

Configuration: Pathfinder 1 optical payload on Gravitas

Gravitas uses K2 Space’s Mega-class platform. The production network’s design figures are separate.

Evidence basis: Reported in-orbit test

Source / observation date: .

Supporting source ↗
Compute hardware
SES software-defined payload on a K2 Space satellite platformmeoSphere first production phasePlanned design
Notes & source

Configuration: meoSphere first production phase

The specification identifies the payload and platform providers but does not name the computing processor or accelerator.

Evidence basis: Planned design

Source / observation date: .

Supporting source ↗
Electrical power (boundary unresolved)
20 kWmeoSphere first production phase

SES gives a per-satellite figure without saying how much goes to computing, or whether it is peak or sustained.

Planned per-satellite rating
Notes & source

Configuration: meoSphere first production phase

SES gives a per-satellite figure without saying how much goes to computing, or whether it is peak or sustained.

Evidence basis: Planned per-satellite rating

Source / observation date: .

Supporting source ↗
Orbit / altitude
About 8,000 kmmeoSphere first production phase

Approximate altitude for the planned production constellation.

Planned design
Notes & source

Configuration: meoSphere first production phase

Approximate altitude for the planned production constellation.

Evidence basis: Planned design

Source / observation date: .

Supporting source ↗
Ground communications
Mynaric CONDOR Mk3 onboard laser terminalPathfinder 1 optical payload on GravitasFlight hardware identified by supplier
Notes & source

Configuration: Pathfinder 1 optical payload on Gravitas

Mynaric identified the terminal used by the SES test payload. The test link was to Earth.

Evidence basis: Flight hardware identified by supplier

Source / observation date: .

Supporting source ↗
Two-way optical video and file transfer with the Cailabs station in RennesPathfinder 1 optical payload on GravitasReported in-orbit test
Notes & source

Configuration: Pathfinder 1 optical payload on Gravitas

SES reports repeated transfers from the ground and the orbiting payload. It did not publish the link rate or duration.

Evidence basis: Reported in-orbit test

Source / observation date: .

Supporting source ↗
Inter-satellite communications
Up to 100 GbpsmeoSphere first production phase

Design figure for the network’s multiple optical relay uses, including links between its satellites. SES did not give a measured pathfinder rate.

Planned optical relay capacity
Notes & source

Configuration: meoSphere first production phase

Design figure for the network’s multiple optical relay uses, including links between its satellites. SES did not give a measured pathfinder rate.

Evidence basis: Planned optical relay capacity

Source / observation date: .

Supporting source ↗
Other specifications
Onboard data processing for analytics and AI, with storage for customer datameoSphere first production phasePlanned services
Notes & source

Configuration: meoSphere first production phase

SES describes these capabilities for the future network.

Evidence basis: Planned services

Source / observation date: .

Supporting source ↗

Explore project relationships →

Figures retain their disclosed units and scope. Launched hardware does not establish demonstrated performance; targets may change. Not disclosed means no figure in the reviewed sources.

Organizations & responsibilities

Progress describes the recorded contribution as of its cited report.

Project organizations

Suppliers & hosts

Partnership
DemonstratedReported

Cailabs’ ground station exchanged video with the Pathfinder 1 payload.

Full record & sources for Cailabs

Original disclosure · 4 Nov 2026: Cailabs provided the optical ground station in Rennes used for the two-way link.

Buyer: SES

Project profile: SES meoSphere

View this relationship on the organization profile →

Source checked 24 Nov 2026.

Progress reviewed 24 Nov 2026.

SES Achieves Optical Communications Milestone for Future meoSphere Network ↗
Company information

Cailabs makes optical ground stations and other products that use lasers to transmit or shape light.

Headquarters
Rennes, France
Host
Partnership
LaunchedReported

The SES optical payload flew aboard K2 Space’s Gravitas satellite.

Full record & sources for K2 Space

Original disclosure · 4 Nov 2026: K2 Space’s Gravitas satellite hosted the SES meoSphere Pathfinder 1 optical payload.

Buyer: SES

Project profile: SES meoSphere

View this relationship on the organization profile →

Source checked 24 Nov 2026.

Progress reviewed 24 Nov 2026.

SES Achieves Optical Communications Milestone for Future meoSphere Network ↗
Supplier
Role confirmed
PlannedReported

SES selected K2 Space’s platforms for the first phase.

Full record & sources for K2 Space

Original disclosure · 24 Mar 2026: K2 Space will supply the platforms for the first 28 meoSphere satellites.

Buyer: SES

Project profile: SES meoSphere

View this relationship on the organization profile →

Source checked 24 Nov 2026.

Progress reviewed 24 Nov 2026.

SES Taps K2 Space to Accelerate Next-Gen MEO Satellite Network, meoSphere ↗
Company information

K2 Space designs and manufactures large, high-power satellite platforms.

Headquarters
Torrance, United States
Company information checked
Sources for K2 Space
Partnership
DemonstratedReported

Mynaric reported that the terminal transferred data in both directions with the ground station.

Full record & sources for Mynaric

Original disclosure · 4 Nov 2026: Mynaric supplied the onboard CONDOR Mk3 optical terminal used in Pathfinder 1.

Buyer: SES

Project profile: SES meoSphere

View this relationship on the organization profile →

Source checked 24 Nov 2026.

Progress reviewed 24 Nov 2026. Mynaric reports two-way optical data transfer ↗

SES Achieves Optical Communications Milestone for Future meoSphere Network ↗
Company information

Mynaric builds laser terminals that carry data between spacecraft and between spacecraft and the ground.

Location
Gilching, Germany
Parent organization
Rocket Lab
Partnership
Work completedReported

Thales Alenia Space supported the system integration, testing, and operations for the reported link demonstration.

Full record & sources for Thales Alenia Space

Original disclosure · 4 Nov 2026: Thales Alenia Space helped assemble, integrate, test, and operate the Pathfinder 1 system.

Buyer: SES

Project profile: SES meoSphere

View this relationship on the organization profile →

Source checked 24 Nov 2026.

Progress reviewed 24 Nov 2026.

SES Achieves Optical Communications Milestone for Future meoSphere Network ↗
Company information

Thales Alenia Space designs and manufactures satellites, payloads and orbital infrastructure for communications, observation, navigation and exploration.

Headquarters
Cannes, France
Ownership
Thales (67%) and Leonardo (33%)
NEXT MILESTONE

SES targets operation by 2030.

Manual review 24 Nov 2026. SES reported a two-way laser link from its pathfinder. Onboard processing and storage are planned for the future network. Primary body last observed not available. Source monitoring: ongoing. Source collection and substantive profile review are separate checks. Plans and dates may change.

SES meoSphere deployment plan and specifications (opens in a new tab)
WHAT REMAINS UNKNOWN
  • Installed processing hardware, storage capacity and computing performance
  • Dedicated electrical and cooling budgets for the computing payload
  • Measured pathfinder rate and link duration
  • Flight date for onboard processing or storage demonstrations

Project updates

Verified announcements and milestones linked to this project, newest first.