SD-1 SAT launched on Nuri on 7 October 2026 and established initial communications. The 3U satellite carries Space & Bean experiments to compare radiation shielding materials and test commercial electronics in orbit, including an edge AI module. Yonsei built and operates the spacecraft.

Space & Bean and Yonsei UniversityLaunchedLaunched, initial communications established

Scope: Enabling research · Flight qualification of enabling electronics and materials, without a shared computing platform.

Technical overview

Compare technical specifications →

Configuration: SD-1 SAT flight mission

Configuration / deployment
One 3U CubeSat configurationReported launched configuration or planned flight experiment
Notes & source

Configuration: SD-1 SAT flight mission

Complete spacecraft form factor.

Evidence basis: Reported launched configuration or planned flight experiment

Source / observation date: .

Supporting source ↗
Compute hardware
Commercial edge AI module, camera and IoT communications equipment hardwareReported launched configuration or planned flight experiment
Notes & source

Configuration: SD-1 SAT flight mission

Named electronics scheduled for flight validation, without chip models or compute ratings.

Evidence basis: Reported launched configuration or planned flight experiment

Source / observation date: .

Supporting source ↗
Mass
4.1 kg

Complete spacecraft mass.

Reported launched configuration or planned flight experiment
Notes & source

Configuration: SD-1 SAT flight mission

Complete spacecraft mass.

Evidence basis: Reported launched configuration or planned flight experiment

Source / observation date: .

Supporting source ↗
Orbit / altitude
Approximately 570 km sun-synchronous orbit orbitReported launched configuration or planned flight experiment
Notes & source

Configuration: SD-1 SAT flight mission

Yonsei's shared mission account for the three spacecraft.

Evidence basis: Reported launched configuration or planned flight experiment

Source / observation date: .

Supporting source ↗
Ground communications
Two-way links with Yonsei's Sinchon campus ground station architectureReported launched configuration or planned flight experiment
Notes & source

Configuration: SD-1 SAT flight mission

Initial contact reported about two hours after launch, without numerical communications capacity.

Evidence basis: Reported launched configuration or planned flight experiment

Source / observation date: .

Supporting source ↗
Ground team received GPS log data from SD-1 SATSouth Korean space agency postlaunch report, October 14, 2026
Notes & source

Configuration: SD-1 SAT flight mission

South Korea’s space agency reported receipt of GPS log data during initial contact on October 7.

Evidence basis: South Korean space agency postlaunch report, October 14, 2026

Source / observation date: .

Supporting source ↗
Design life / mission duration
Six months mission durationReported launched configuration or planned flight experiment
Notes & source

Configuration: SD-1 SAT flight mission

Planned radiation and materials experiment duration.

Evidence basis: Reported launched configuration or planned flight experiment

Source / observation date: .

Supporting source ↗
Other specifications
Low-power radiation sensors and comparison of two shielding materials experiment architectureReported launched configuration or planned flight experiment
Notes & source

Configuration: SD-1 SAT flight mission

Measurements target the South Atlantic Anomaly. No numerical dose threshold or material composition supplied.

Evidence basis: Reported launched configuration or planned flight experiment

Source / observation date: .

Supporting source ↗

Explore project relationships →

Figures retain their disclosed units and scope. Launched hardware does not establish demonstrated performance; targets may change. Not disclosed means no figure in the reviewed sources.

Organizations & responsibilities

Progress describes the recorded contribution as of its cited report.

Project organizations

Role confirmed
LaunchedReported

SD-1 SAT launched on October 7. Yonsei reported initial two-way communications and began early operations.

Full record & sources for Yonsei University (연세대학교)

Original disclosure · 8 Oct 2026: Spacecraft bus development, payload integration, environmental testing and flight operations for SD-1 SAT.

Buyer: Space & Bean (㈜스페이스앤빈)

Project profile: SD-1 SAT

View this relationship on the organization profile →

Source checked 19 Nov 2026.

Progress reviewed 19 Nov 2026.

우리 대학교 개발 큐브위성 3기, 누리호 타고 우주로… 모두 양방향 교신 성공 ↗
Company information

Yonsei University provides higher education and conducts research across disciplines, including engineering, medicine and space systems.

Location
Seoul, South Korea
Company information checked
Sources for Yonsei University (연세대학교)
NEXT MILESTONE

Carry out the planned orbital experiments and report their results.

Manual review 26 Nov 2026. Yonsei and South Korea’s space agency confirm two-way contact and receipt of GPS data. The published mission accounts do not give results from the onboard AI module. Primary body last observed not available. Source monitoring: unavailable. Source collection and substantive profile review are separate checks. Plans and dates may change.

Yonsei and Hanseo October 2026 mission reports (opens in a new tab)
WHAT REMAINS UNKNOWN
  • Edge AI processor model, RAM, storage and deployed software.
  • Numerical electrical, thermal and radiation limits.
  • Completed radiation shielding or edge AI validation results.

Project updates

Verified announcements and milestones linked to this project, newest first.