Europe · Germany · 6U avionics and computing technology demonstrator

DLR PLUTO avionics demonstrators

DLR is developing PLUTO as a 6U technology demonstrator for high-power avionics, distributed computing and reconfigurable communications. Its design combines a 100 W deployable solar array, integrated core avionics and high-performance and reliable computing nodes. A PLUTO+ follow-on is planned.

German Aerospace Center (DLR)DevelopmentPlanned technology demonstrator

Scope: Enabling research · Named enabling hardware and infrastructure research for high-power CubeSat avionics and computing, without a defined shared service platform.

Technical overview

Compare technical specifications →

Configuration / deployment
6U CubeSat technology demonstratorPLUTO 6U development configurationOfficial current project specification
Notes & source

Configuration: PLUTO development configuration

PLUTO is a planned avionics and component demonstration mission, not an operating computing service.

Evidence basis: Official current project specification

Source / observation date: .

Supporting source ↗
Compute hardware
Integrated Core Avionics with reliable and high-performance computing nodes, reconfigurable SDR, GaN power distribution and planned ultrawideband internal networkingPLUTO 6U development configurationOfficial current project architecture
Notes & source

Configuration: PLUTO development configuration

DLR does not identify the processor models or arithmetic rating. A commercial OBC and UHF radio provide backup bus functions.

Evidence basis: Official current project architecture

Source / observation date: .

Supporting source ↗
Total spacecraft electrical demand
15 WPLUTO 6U development configuration

DLR lists nominal average spacecraft power. It is not a dedicated IT or payload power figure.

Official study estimate · Official design specification
Notes & source

Configuration: PLUTO spacecraft nominal average power

DLR lists nominal average spacecraft power. It is not a dedicated IT or payload power figure.

Evidence basis: Official study estimate · Official design specification

Source / observation date: .

Supporting source ↗
Solar generation
Up to 100 WPLUTO 6U development configuration

Planned peak generation from the flexible solar array, not computing load or measured output.

Official study estimate · Official design specification
Notes & source

Configuration: PLUTO deployable flexible solar array

Planned peak generation from the flexible solar array, not computing load or measured output.

Evidence basis: Official study estimate · Official design specification

Source / observation date: .

Supporting source ↗
Heat rejection
In-orbit thermal stability test during 100 W generationPLUTO 6U development configurationOfficial study estimate · Official mission objective
Notes & source

Configuration: PLUTO thermal demonstration

Qualitative test objective. DLR does not disclose heat rejection, radiator area or numerical operating limits.

Evidence basis: Official study estimate · Official mission objective

Source / observation date: .

Supporting source ↗
Mass
7 kgPLUTO 6U development configuration

Planned satellite mass from the current DLR parameter table.

Official study estimate · Official design specification
Notes & source

Configuration: PLUTO spacecraft

Planned satellite mass from the current DLR parameter table.

Evidence basis: Official study estimate · Official design specification

Source / observation date: .

Supporting source ↗
Orbit / altitude
Sun-synchronous low Earth orbitPLUTO 6U development configurationOfficial study estimate · Official planned mission description
Notes & source

Configuration: PLUTO planned mission

The 2025 DLR mission video specifies sun-synchronous orbit. The current project page says only low Earth orbit and does not disclose altitude or inclination.

Evidence basis: Official study estimate · Official planned mission description

Source / observation date: .

Supporting source ↗
Ground communications
Up to 19.2 kbpsPLUTO 6U development configuration

DLR plans GFSK on the UHF uplink and downlink. The rate is for the downlink only.

Official study estimate · Official design specification
Notes & source

Configuration: PLUTO UHF link

DLR plans GFSK on the UHF uplink and downlink. The rate is for the downlink only.

Evidence basis: Official study estimate · Official design specification

Source / observation date: .

Supporting source ↗
Up to 2 MbpsPLUTO 6U development configuration

DLR plans BPSK on the S-band uplink and QPSK on the S-band downlink. The rate is for the downlink only.

Official study estimate · Official design specification with typographical unit duplication
Notes & source

Configuration: PLUTO S-band link

DLR plans BPSK on the S-band uplink and QPSK on the S-band downlink. The rate is for the downlink only.

Evidence basis: Official study estimate · Official design specification with typographical unit duplication

Source / observation date: .

Supporting source ↗
Communications (boundary unspecified)
SpaceWire, CAN, RS422, TTL UART and planned ultrawideband intra-spacecraft networkingPLUTO 6U development configurationOfficial current project architecture
Notes & source

Configuration: PLUTO spacecraft internal communications

These are internal spacecraft interfaces, not ground or inter-satellite data rates.

Evidence basis: Official current project architecture

Source / observation date: .

Supporting source ↗
Design life / mission duration
2 yearsPLUTO 6U development configuration

DLR lists a two-year design life and states that components should operate for at least one year.

Official study estimate · Official design specification
Notes & source

Configuration: PLUTO spacecraft design life

DLR lists a two-year design life and states that components should operate for at least one year.

Evidence basis: Official study estimate · Official design specification

Source / observation date: .

Supporting source ↗
At least 1 yearPLUTO 6U flight design

DLR aims to run the test components for at least one year. It separately gives the spacecraft a two-year design life.

DLR in-orbit test objective
Notes & source

Configuration: PLUTO 6U flight design

DLR aims to run the test components for at least one year. It separately gives the spacecraft a two-year design life.

Evidence basis: DLR in-orbit test objective

Source / observation date: .

Supporting source ↗
Memory / storage
Up to 100 GBPLUTO 6U development configuration

Planned data-storage capacity. RAM is not disclosed.

Official study estimate · Official design specification
Notes & source

Configuration: PLUTO spacecraft data storage

Planned data-storage capacity. RAM is not disclosed.

Evidence basis: Official study estimate · Official design specification

Source / observation date: .

Supporting source ↗
Physical envelope
6U CubeSatPLUTO 6U development configurationOfficial mission description
Notes & source

Configuration: PLUTO spacecraft

The deployable 100 W array is stored in 1U according to DLR's 2025 mission video.

Evidence basis: Official mission description

Source / observation date: .

Supporting source ↗
Other specifications
90 WhPLUTO 6U development configuration

Planned stored electrical energy. This is battery capacity, not power generation or consumption.

Official study estimate · Official design specification
Notes & source

Configuration: PLUTO spacecraft battery

Planned stored electrical energy. This is battery capacity, not power generation or consumption.

Evidence basis: Official study estimate · Official design specification

Source / observation date: .

Supporting source ↗
3.3 V and 5 V power bus, up to 2 APLUTO 6U flight designDLR flight design specification
Notes & source

Configuration: PLUTO 6U flight design

DLR lists the bus voltage and current. These are not spacecraft or computing power measurements.

Evidence basis: DLR flight design specification

Source / observation date: .

Supporting source ↗

Explore project relationships →

Figures retain their disclosed units and scope. Launched hardware does not establish demonstrated performance; targets may change. Not disclosed means no figure in the reviewed sources.

Organizations & responsibilities

Progress is unconfirmed for all recorded contributions.

Project organizations

Suppliers & hosts

Astronika

SupplierCategory not recorded
Role confirmed
Progress unconfirmed · Disclosure

Astronika supplies the deployable masts for DLR's 100 W DEAR solar array, which DLR plans to flight-test on PLUTO-1.

Full record & sources for Astronika

The source establishes the component role and planned PLUTO-1 flight test. It does not disclose a procurement value or completed flight.

Associated organization: German Aerospace Center (DLR)

Project profile: DLR PLUTO avionics demonstrators

View this relationship on the organization profile →

Source checked 20 Nov 2026.

DLR at the Space Symposium 2025 ↗
Company information

Astronika develops specialized mechanisms and instruments for space missions.

Company address
Raszyn, Poland

AZUR SPACE

SupplierCategory not recorded
Role confirmed
Progress unconfirmed · Disclosure

AZUR SPACE provides the solar cells for DLR's 100 W DEAR solar array, which DLR plans to flight-test on PLUTO-1.

Full record & sources for AZUR SPACE

The source establishes the component role and planned PLUTO-1 flight test. It does not disclose a procurement value or completed flight.

Associated organization: German Aerospace Center (DLR)

Project profile: DLR PLUTO avionics demonstrators

View this relationship on the organization profile →

Source checked 20 Nov 2026.

DLR at the Space Symposium 2025 ↗
Company information

AZUR SPACE develops and produces multi-junction solar cells for space and terrestrial photovoltaic systems.

Head office
Heilbronn, Germany
Parent organization
5N Plus Inc.

Research & collaboration

Partnership
Progress unconfirmed · Disclosure

HAW Hamburg developed PLUTO experiments with TU Hamburg to study undervolting and the reliability of low-power FPGA circuits in orbit.

Full record & sources for Hamburg University of Applied Sciences (HAW Hamburg)

The university report establishes a research contribution to PLUTO. It does not establish paid procurement or a disclosed contract value.

Associated organization: German Aerospace Center (DLR)

Project profile: DLR PLUTO avionics demonstrators

View this relationship on the organization profile →

Source checked 20 Nov 2026.

Weltraumtechnik made at HAW Hamburg ↗
Company information

Hamburg University of Applied Sciences is a public university of applied sciences in Hamburg, Germany.

Address
Hamburg, Germany
Company information checked
Sources for Hamburg University of Applied Sciences (HAW Hamburg)
Partnership
Progress unconfirmed · Disclosure

TU Hamburg developed PLUTO experiments with HAW Hamburg to study undervolting and the reliability of low-power FPGA circuits in orbit.

Full record & sources for Hamburg University of Technology (TU Hamburg)

The university report establishes a research contribution to PLUTO. It does not establish paid procurement or a disclosed contract value.

Associated organization: German Aerospace Center (DLR)

Project profile: DLR PLUTO avionics demonstrators

View this relationship on the organization profile →

Source checked 20 Nov 2026.

Weltraumtechnik made at HAW Hamburg ↗
Company information

Hamburg University of Technology is a university in Hamburg focused on engineering and technology.

Address
Hamburg, Germany
Company information checked
Sources for Hamburg University of Technology (TU Hamburg)
NEXT MILESTONE

Updated launch timing for PLUTO and PLUTO+ and first in-orbit results

Manual review with evidence gaps 27 Nov 2026. DLR lists a one-year minimum for testing the avionics in orbit and a two-year spacecraft design life. A launch date is still unconfirmed. Primary body last observed not available. Source monitoring: ongoing. Source collection and substantive profile review are separate checks. Plans and dates may change.

DLR Institute of Space Systems (opens in a new tab)
WHAT REMAINS UNKNOWN
  • Current PLUTO launch status after the listed Q2 2026 plan
  • High-performance processor model and count, RAM, arithmetic throughput and precision
  • Measured solar output, spacecraft power demand and thermal performance in orbit
  • Numerical orbit altitude and inclination
  • Detailed PLUTO+ hardware differences

Project updates

Verified announcements and milestones linked to this project, newest first.

DLR publishes PLUTO mission video

DLR described PLUTO as a 6U technology demonstrator with a 100 W solar array, integrated avionics and distributed computing.

DLR outlines a 100-watt PLUTO CubeSat for computing tests (opens in a new tab)

DLR presented PLUTO, a planned 6U CubeSat that combines a deployable 100 W solar array with integrated avionics, distributed computing and reconfigurable communications. The project is intended to test how small satellites can host computing and communications equipment usually used on larger spacecraft.

Current DLR launch plan

DLR currently lists PLUTO on Spectrum 3 in Q2 2026 and PLUTO+ on Vega in 2027. No launch result appears in the reviewed official material.