Transitions

Fleet transition intelligence

Contract endings, confirmed follow-ons, customer changes and regional moves from accepted assignments. Short administrative gaps, maintenance windows and unknown placeholder geographies/customers are de-emphasized.

Transition rows use the production-backed asset universe. Unknown regions and undisclosed customers are excluded from regional/customer movement counts and handled as coverage quality elsewhere.

Open availability workflow

Transition mix

Decision filters below keep production assignment rows source-backed.
43transition rows
0high significance
0medium significance
6verified confidence
25contract endings
Clear filters

43 production transition results

Useful production results from current and next assignments; every row shows commercial significance and confidence.
AssetCurrent customer / regionCurrent contract endNext customer / regionNext startTransition typeGapCommercial significanceConfidenceLast verifiedEvidence
VALARIS 120
Valaris
Eni
United Kingdom
Aug 2026Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 120 KFELS Super A 2013 Eni UK Jan 26 Aug 26 VALARIS 120 will substitute for VALARIS 248 from Jan 2026 to Aug 2026, while VALARIS 248

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 122
Valaris
Adura
United Kingdom
Aug 2026INEOS
United Kingdom
Sept 2026Customer change4 dayslowverifiedJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 122 KFELS Super A 2014 Adura UK Jan 26 Aug 26 Contracted revenue backlog of approx. $28 million for extensions totaling 243 days. The extensions

Next evidence: INEOS UK Sep 26 Feb 27 $115,000 Options with an estimated total duration of 825 days for work in the UK and Danish North Sea

Open source
sourceUrl
VALARIS 123
Valaris
TAQA
Netherlands
Aug 2026Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: TAQA Netherlands Jan 26 Aug 26 $80,000 Accommodation support

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 249
Valaris
BP
Trinidad And Tobago
Aug 2026Shell
Trinidad And Tobago
Oct 2026Customer change34 dayslowverifiedJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: BP Trinidad Apr 26 Aug 26 TCV of $16.8 million based on duration of 100 days. Expect approx. 60 days out of service for

Next evidence: Shell Trinidad Oct 26 Oct 27 Contracted revenue backlog of approx. $66 million based on estimated duration of 365 days. Three

Open source
sourceUrl
VALARIS DS-15
Valaris
No current assignment identified
Côte d’Ivoire
Schedule not disclosedCNR
Côte d’Ivoire
Sept 2026Confirmed follow-onGap unknowncoverageverifiedJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: Excerpt not available

Next evidence: CNR Cote d'Ivoire Sep 26 May 27 TCV, based on an estimated duration of 250 days, is approx. $135 million, including upfront

Open source
sourceUrl
VALARIS 107
Valaris
ExxonMobil
Australia
Oct 2026GB Energy
Australia
Nov 2026Customer change4 dayslowverifiedJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 107 KFELS MOD V-B 2006 ExxonMobil Australia Nov 25 Oct 26 $163,000

Next evidence: GB Energy Australia Nov 26 Mar 27 TCV of approx. $27 million based on estimated duration of 150 days

Open source
sourceUrl
VALARIS 121
Valaris
Adura
United Kingdom
Oct 2026Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: Adura UK Feb 26 Oct 26 Contracted revenue backlog of over $25 million based on estimated duration of 194 days. Option with

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS DS-18
Valaris
No current assignment identified
U.S. Gulf of Mexico
Schedule not disclosedOccidental
U.S. Gulf of Mexico
Dec 2026Confirmed follow-onGap unknowncoverageverifiedJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: Excerpt not available

Next evidence: VALARIS DS-18 GustoMSC P10000 2015 Occidental Gulf of America Dec 26 Jun 29 914-day contract for DS-18 and 940-day contract extension for DS-16. Combined addition to

Open source
sourceUrl
VALARIS DS-8
Valaris
Petrobras
Brazil
Dec 2026Shell
Brazil
Mar 2027Customer change63 dayslowverifiedJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS DS-8 Samsung GF12000 2015 Petrobras Brazil Dec 23 Dec 26 $428,000 Plus mobilization fee of approx. $30 million. Contract includes additional services. Expect approx.

Next evidence: Shell Brazil Mar 27 May 29 TCV of approx. $300 million, excluding additional services, based on estimated duration of 800

Open source
sourceUrl
VALARIS Norway
Valaris
Ithaca Energy
United Kingdom
Feb 2027Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: Ithaca Energy UK May 26 Feb 27 Contracted revenue backlog of approx. $36 million based on duration of 300 days

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 108
Valaris
ARO Drilling
Saudi Arabia
Mar 2027Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 108 KFELS MOD V-B 2007 ARO Drilling Saudi Arabia Mar 24 Mar 27 Expect approx. 15 days out of service for planned maintenance in 2Q26. 1-year priced

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS DS-12
Valaris
BP
Egypt
Apr 2027Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS DS-12 DSME 12000 2013 BP Egypt Apr 26 Apr 27 TCV, based on estimated duration of 350 days, is approx. $140 million, inclusive of MPD and

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 92
Valaris
Shell
United Kingdom
Aug 2027Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 92 LT 116-C 1982 Shell UK Aug 25 Aug 27 Options with total duration of up to one year

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS Stavanger
Valaris
NEO NEXT+
United Kingdom
Aug 2027Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS Stavanger KFELS N Class 2011 NEO NEXT+ UK Jan 26 Aug 27 TCV of over $75 million based on 600-day priced extension. Two 200-day priced options

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 72
Valaris
Eni
United Kingdom
Sept 2027Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 72 Hitachi 300C 1981 Eni UK Oct 25 Sep 27

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 144
Valaris
Azule Energy
Angola
Oct 2027Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 144 LT Super 116-E 2010 Azule Energy Angola Sep 25 Oct 27 TCV estimated to be between $149 million and $156 million based on contract duration of

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 248
Valaris
Eni
United Kingdom
Jan 2028Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: Eni UK Aug 26 Jan 28 TCV of approx. $84 million for 730-day contract to perform P&A and CCS work. Two 3-month options.

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS DS-17
Valaris
Equinor
Brazil
Jan 2028Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS DS-17 GustoMSC P10000 2014 Equinor Brazil Mar 26 Jan 28 Estimated total contract value ("TCV") of $498 million, inclusive of MPD, additional services and

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 106
Valaris
BP
Indonesia
Jun 2028Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: BP Indonesia Jul 26 Jun 28 TCV of approx. $74 million based on estimated duration of two years. Four 1-well options

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS DS-10
Valaris
Shell
Nigeria
Jul 2028Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: Shell Nigeria Jun 26 Jul 28 TCV of $352 million based on duration of two years. TCV does not include the provision of

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS DS-9
Valaris
ExxonMobil
Angola
Jul 2028Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: ExxonMobil Angola Jul 26 Jul 28 Operating day rate is in line with recent market rates in the region. Two 6-month options

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 118
Valaris
BP
Trinidad And Tobago
Aug 2028Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 118 LT 240-C 2012 BP Trinidad Nov 25 Aug 28 TCV of approx. $168 million based on duration of three years. Two 1-year options

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS DS-16
Valaris
Occidental
U.S. Gulf of Mexico
Dec 2028Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: Occidental Gulf of America Jun 26 Dec 28 940-day contract extension for DS-16 and 914-day contract for DS-18. Combined addition to

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 110
Valaris
NOC
Qatar
Oct 2029Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 110 KFELS MOD V-B 2015 NOC Qatar Oct 25 Oct 29 Contracted revenue backlog for the four-year extension is approx. $117 million. 1-year

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 116
Valaris
ARO Drilling
Saudi Arabia
Apr 2030Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 116 LT 240-C 2008 ARO Drilling Saudi Arabia May 25 Apr 30 Expect approx. 120 days out of service for planned maintenance in 2Q/3Q26.

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 140
Valaris
ARO Drilling
Saudi Arabia
Apr 2030Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 140 LT Super 116-E 2016 ARO Drilling Saudi Arabia May 25 Apr 30 Expect approx. 30 days out of service for planned maintenance in 2Q26

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 146
Valaris
ARO Drilling
Saudi Arabia
Apr 2030Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 146 LT Super 116-E 2011 ARO Drilling Saudi Arabia May 25 Apr 30 Expect approx. 90 days out of service for planned maintenance in 3Q/4Q26

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 250
Valaris
ARO Drilling
Saudi Arabia
Apr 2030Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 250 LT Super Gorilla XL 2003 ARO Drilling Saudi Arabia May 25 Apr 30 Expect approx. 120 days out of service for planned maintenance in 2Q/3Q26.

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 141
Valaris
ARO Drilling
Saudi Arabia
Aug 2030Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 141 LT Super 116-E 2016 ARO Drilling Saudi Arabia Aug 25 Aug 30 Expect approx. 10 days out of service for planned maintenance in 2Q26

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 76
Valaris
ARO Drilling
Saudi Arabia
Dec 2030Customer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Valaris Fleet Status Report

Current evidence: VALARIS 76 LT Super 116-C 2000 ARO Drilling Saudi Arabia Dec 25 Dec 30 Priced options of up to two years

Next evidence: Excerpt not available

Open source
sourceUrl
VALARIS 104
Valaris
No current assignment identified
Region not verified
Schedule not disclosedCustomer undisclosed
Region not verified
Schedule not disclosedStackedGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Not identified

Current evidence: Excerpt not available

Next evidence: Excerpt not available

Source link unavailable

VALARIS 109
Valaris
No current assignment identified
Region not verified
Schedule not disclosedCustomer undisclosed
Region not verified
Schedule not disclosedStackedGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Not identified

Current evidence: Excerpt not available

Next evidence: Excerpt not available

Source link unavailable

VALARIS 111
Valaris
No current assignment identified
Region not verified
Schedule not disclosedCustomer undisclosed
Region not verified
Schedule not disclosedStackedGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Not identified

Current evidence: Excerpt not available

Next evidence: Excerpt not available

Source link unavailable

VALARIS 117
Valaris
No current assignment identified
Trinidad And Tobago
Schedule not disclosedCustomer undisclosed
Region not verified
Schedule not disclosedContract endingGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Not identified

Current evidence: Excerpt not available

Next evidence: Excerpt not available

Source link unavailable

VALARIS 143
Valaris
No current assignment identified
Region not verified
Schedule not disclosedCustomer undisclosed
Region not verified
Schedule not disclosedStackedGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Not identified

Current evidence: Excerpt not available

Next evidence: Excerpt not available

Source link unavailable

VALARIS 147
Valaris
No current assignment identified
Region not verified
Schedule not disclosedCustomer undisclosed
Region not verified
Schedule not disclosedStackedGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Not identified

Current evidence: Excerpt not available

Next evidence: Excerpt not available

Source link unavailable

VALARIS 148
Valaris
No current assignment identified
Region not verified
Schedule not disclosedCustomer undisclosed
Region not verified
Schedule not disclosedStackedGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Not identified

Current evidence: Excerpt not available

Next evidence: Excerpt not available

Source link unavailable

VALARIS DPS-1
Valaris
No current assignment identified
Region not verified
Schedule not disclosedCustomer undisclosed
Region not verified
Schedule not disclosedStackedGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Not identified

Current evidence: Excerpt not available

Next evidence: Excerpt not available

Source link unavailable

VALARIS DS-11
Valaris
No current assignment identified
Region not verified
Schedule not disclosedCustomer undisclosed
Region not verified
Schedule not disclosedStackedGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Not identified

Current evidence: Excerpt not available

Next evidence: Excerpt not available

Source link unavailable

VALARIS DS-13
Valaris
No current assignment identified
Region not verified
Schedule not disclosedCustomer undisclosed
Region not verified
Schedule not disclosedStackedGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Not identified

Current evidence: Excerpt not available

Next evidence: Excerpt not available

Source link unavailable

VALARIS DS-14
Valaris
No current assignment identified
Region not verified
Schedule not disclosedCustomer undisclosed
Region not verified
Schedule not disclosedStackedGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Not identified

Current evidence: Excerpt not available

Next evidence: Excerpt not available

Source link unavailable

VALARIS MS-1
Valaris
No current assignment identified
Region not verified
Schedule not disclosedCustomer undisclosed
Region not verified
Schedule not disclosedStackedGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Not identified

Current evidence: Excerpt not available

Next evidence: Excerpt not available

Source link unavailable

VALARIS Viking
Valaris
No current assignment identified
Region not verified
Schedule not disclosedCustomer undisclosed
Region not verified
Schedule not disclosedStackedGap unknownwatchschedule unclearJul 2026
Evidence

Source title: Not identified

Current evidence: Excerpt not available

Next evidence: Excerpt not available

Source link unavailable