Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 98 projects. 13 proposal / study · 35 development · 13 launched · 20 demonstrated · 4 operating · 10 historical · 3 uncertain. These are project classifications, not spacecraft counts or verified commercial capacity.
37 projects classified as launched, demonstrated or operating: 29 reviewed, 8 with review limits or awaiting review. Each project appears in one classification.
More filters
Linked view: · GSI Technology · Suppliers and hosts only.
1–1 of 1 relationship records. Each row is one underlying record, including records linked to several projects. Roles and agreement evidence are separate.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| No tracked project linkSpace Development Agency | GSI Technology | Supplier | Processors / accelerators SDA prototype award to develop an APU2 compute-in-memory integrated circuit and evaluation board for space-based edge processing. A September 2025 amendment added assessment of radiation-hardened capability and increased… Details & project milestonesSDA prototype award to develop an APU2 compute-in-memory integrated circuit and evaluation board for space-based edge processing. A September 2025 amendment added assessment of radiation-hardened capability and increased the total award to $2.0 million. Research and prototype award, not a production order or a demonstrated orbital deployment. The June 2023 announcement reported approximately $1.25 million potential milestone payments. The fiscal-2026 Form 10-K reports the amended $2.0 million total and completion of original milestones as of March 31, 2026, with certain amended milestones still outstanding. The recorded amount is the amended total, not an additional award or payments received. Disclosed buyer: Space Development Agency. Associated organization: Space Development Agency. USD 2,000,000. Total prototype award after September 2025 amendment. Subject to milestone performance. Value source ↗Evidence checked 29 Oct 2026. | Contract / order disclosedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.