Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 95 projects. 13 proposal / study · 33 development · 13 launched · 20 demonstrated · 4 operating · 9 historical · 3 uncertain. These are project classifications, not spacecraft counts or verified commercial capacity.
37 projects classified as launched, demonstrated or operating: 29 reviewed, 8 with review limits or awaiting review. Each project appears in one classification.
More filters
Linked view: Pazhou Intelligent Computing Constellation · Suppliers and hosts only.
1–2 of 2 relationship records. Each row is one underlying record, including records linked to several projects. Roles and agreement evidence are separate.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| Pazhou Intelligent Computing ConstellationYusuan Xinghe (Guangzhou) Technology Co., Ltd. (宇算星河) | ADA Space (国星宇航) | Supplier | Satellite bus ADA Space manufactured Pazhou A-group computing satellites Xing Shidai-47 and Xing Shidai-48, reported launched on 14 October 2026. Details & project milestonesADA Space manufactured Pazhou A-group computing satellites Xing Shidai-47 and Xing Shidai-48, reported launched on 14 October 2026. Project-specific spacecraft manufacturing, not proof of all planned model or commercial-service capabilities. Disclosed buyer: Not disclosed. Associated organization: Yusuan Xinghe (Guangzhou) Technology Co., Ltd. (宇算星河). Pazhou Intelligent Computing Constellation: Launched — first two satellites, broader validation outstanding Next project milestone: Check official results of the A-group orbital model validation and announcements for subsequent groups. No verified date is available. This is a project target, not a supplier delivery commitment. Evidence checked 26 Oct 2026. | Role confirmedSource ↗ |
| Pazhou Intelligent Computing ConstellationYusuan Xinghe (Guangzhou) Technology Co., Ltd. (宇算星河) | LandSpace (蓝箭航天) | Supplier | Launch capacity LandSpace provided the upgraded Zhuque-2 launch carrying the first two Pazhou A-group computing satellites into their intended orbit on 14 October 2026. Details & project milestonesLandSpace provided the upgraded Zhuque-2 launch carrying the first two Pazhou A-group computing satellites into their intended orbit on 14 October 2026. Launch service reported delivered. Detailed orbit parameters and contract price are not disclosed here. Disclosed buyer: Not disclosed. Associated organization: Yusuan Xinghe (Guangzhou) Technology Co., Ltd. (宇算星河). Pazhou Intelligent Computing Constellation: Launched — first two satellites, broader validation outstanding Next project milestone: Check official results of the A-group orbital model validation and announcements for subsequent groups. No verified date is available. This is a project target, not a supplier delivery commitment. Evidence checked 26 Oct 2026. | Role confirmedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.