Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Saved catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Saved data as of 29 Nov 2026, 05:02 UTC. Live project and relationship data is temporarily unavailable.
Relationship filters
Linked view: JAXA onboard positioning / QPS-SAR10.
1–2 of 2 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| JAXA onboard positioning / QPS-SAR10Buyer: Institute for Q-shu Pioneers of Space, Inc. (iQPS) (株式会社QPS研究所)Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構) | Rocket Lab | Supplier | Launch capacity LaunchedReported QPS-SAR10 separated about 50 minutes after lift-off and made first contact about 30 minutes later, according to iQPS. History & full recordOriginal disclosure: Rocket Lab launched iQPS’s QPS-SAR10 on an Electron from Māhia, New Zealand, carrying JAXA’s onboard positioning experiment. Buyer: Institute for Q-shu Pioneers of Space, Inc. (iQPS) (株式会社QPS研究所). Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構). Project profile: JAXA onboard positioning / QPS-SAR10 Evidence checked 26 Nov 2026. | Contract / order disclosedSource ↗ |
| JAXA onboard positioning / QPS-SAR10Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構) | Institute for Q-shu Pioneers of Space, Inc. (iQPS) (株式会社QPS研究所) | Host | DemonstratedReported QPS-SAR10 carried the experiment during the flight tests. JAXA reported about 20 centimeters of three-dimensional positioning error. Progress source ↗History & full recordOriginal disclosure: iQPS hosted JAXA’s H²-OBC and navigation receivers on QPS-SAR10 for the onboard positioning tests. Buyer: Not disclosed. Associated organization: Japan Aerospace Exploration Agency (JAXA) (国立研究開発法人宇宙航空研究開発機構). Project profile: JAXA onboard positioning / QPS-SAR10 Evidence checked 26 Nov 2026. | Development agreementSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.