Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: PLATO onboard data processing.
1–6 of 6 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| PLATO onboard data processingBuyer: European Space Agency (ESA) | Frontgrade Gaisler | Supplier | Delivered / integratedReported Frontgrade Gaisler identifies its processors and SpaceWire routers in the onboard design. History & full recordOriginal disclosure: Frontgrade Gaisler provides processors for 12 normal-camera computers and the routers that connect the processing units to the spacecraft. Buyer: European Space Agency (ESA). Associated organization: European Space Agency (ESA). Project profile: PLATO onboard data processing Evidence checked 24 Nov 2026. | PartnershipSource ↗ |
| PLATO onboard data processingBuyer: European Space Agency (ESA) | Beyond Gravity | Supplier | Delivered / integratedReported ESA lists Beyond Gravity in the team that built the spacecraft. History & full recordOriginal disclosure: Beyond Gravity helped OHB build and assemble the PLATO spacecraft. Buyer: European Space Agency (ESA). Associated organization: European Space Agency (ESA). Project profile: PLATO onboard data processing Evidence checked 24 Nov 2026. | PartnershipSource ↗ |
| PLATO onboard data processingBuyer: European Space Agency (ESA) | Thales Alenia Space | Supplier | Delivered / integratedReported ESA lists Thales Alenia Space in the team that built the spacecraft. History & full recordOriginal disclosure: Thales Alenia Space helped OHB build and assemble the PLATO spacecraft. Buyer: European Space Agency (ESA). Associated organization: European Space Agency (ESA). Project profile: PLATO onboard data processing Evidence checked 24 Nov 2026. | PartnershipSource ↗ |
| PLATO onboard data processingBuyer: European Space Agency (ESA) | PLATO Mission Consortium | Research participant | In developmentReport date unconfirmed ESA and the consortium completed and tested the flight-model cameras. History & full recordOriginal disclosure: The PLATO Mission Consortium develops the science payload with ESA, including the camera and processing electronics. Buyer: European Space Agency (ESA). Associated organization: European Space Agency (ESA). Project profile: PLATO onboard data processing Evidence checked 24 Nov 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| PLATO onboard data processingBuyer: European Space Agency (ESA) | German Aerospace Center (DLR) | Research participant | Delivered / integratedReport date unconfirmed DLR reports completing work on the fast camera electronics and testing the data processing system. History & full recordOriginal disclosure: DLR’s Institute of Space Research developed and tested the onboard data processing system and built the electronics for the two fast cameras. Buyer: European Space Agency (ESA). Associated organization: European Space Agency (ESA). Project profile: PLATO onboard data processing Evidence checked 24 Nov 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| PLATO onboard data processingBuyer: European Space Agency (ESA) | OHB | Supplier | Delivered / integratedReport date unconfirmed DLR reports that OHB installed the flight cameras on the spacecraft. History & full recordOriginal disclosure: As spacecraft prime contractor, OHB integrated the 26 flight cameras on PLATO’s optical bench. Buyer: European Space Agency (ESA). Associated organization: European Space Agency (ESA). Project profile: PLATO onboard data processing Evidence checked 24 Nov 2026. | PartnershipDisclosure date not suppliedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.