Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: DPhi Space Clustergate-2.
1–7 of 7 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| DPhi Space Clustergate-2Parsimoni SpaceOSAssociated organization: Parsimoni | DPhi Space | Host | Flight / payload softwareProgress unconfirmed · Disclosure Clustergate-2 hosted-payload module running Parsimoni's Borealis communications software. History & full recordFirst boot occurred on April 23, 2026. Software uses the module's Linux environment and file-based ground transfer. The report planned a later signing-key rotation exercise. Buyer: Not disclosed. Associated organization: Parsimoni. Project profile: DPhi Space Clustergate-2 Project profile: Parsimoni SpaceOS Evidence checked 18 Nov 2026. | PartnershipSource ↗ |
| DPhi Space Clustergate-2EDGX STERNA orbital-computing demonstrationsAssociated organization: DPhi Space | EDGX | Supplier | DemonstratedReported DPhi Space reported that Clustergate-2 generated an image caption while being commissioned. History & full recordOriginal disclosure: EDGX provided a Sterna computer with an NVIDIA GPU for Clustergate-2. EDGX calls this flight Early Bird. Buyer: Not disclosed. Associated organization: DPhi Space. Project profile: DPhi Space Clustergate-2 Project profile: EDGX STERNA orbital-computing demonstrations Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| DPhi Space Clustergate-2Associated organization: DPhi Space | Liquid AI | Supplier | Flight / payload software DemonstratedReported The model generated a caption for a previously captured image supplied by Momentus. History & full recordOriginal disclosure: DPhi Space ran Liquid AI’s LFM2-3B model during commissioning. The two companies also announced a hackathon for developers. Buyer: Not disclosed. Associated organization: DPhi Space. Project profile: DPhi Space Clustergate-2 Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| DPhi Space Clustergate-2Associated organization: Momentus | SpaceX | Supplier | Launch integration LaunchedReported Transporter-16 carried Vigoride 7 to low Earth orbit. History & full recordOriginal disclosure: SpaceX launched Momentus’s Vigoride 7 into low Earth orbit on Transporter-16. Clustergate-2 flew aboard Vigoride 7. Buyer: Not disclosed. Associated organization: Momentus. Project profile: DPhi Space Clustergate-2 Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| DPhi Space Clustergate-2Associated organization: DPhi Space | The Compression Company | Supplier | Flight / payload software PlannedReported The partners prepared the software for an orbital test after ground integration. History & full recordOriginal disclosure: The Compression Company provides image compression software for Tilebox’s planned test on Clustergate-2. Buyer: Not disclosed. Associated organization: DPhi Space. Project profile: DPhi Space Clustergate-2 Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| DPhi Space Clustergate-2Associated organization: DPhi Space | Tilebox | Supplier | Flight / payload software PlannedReported Tilebox reported ground integration and announced the orbital test plan. History & full recordOriginal disclosure: Tilebox’s software links the ground and onboard workflows for the planned compression test on Clustergate-2. Buyer: Not disclosed. Associated organization: DPhi Space. Project profile: DPhi Space Clustergate-2 Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| DPhi Space Clustergate-2Associated organization: DPhi Space | Momentus | Host | LaunchedReported Vigoride 7 launched with Clustergate-2 on March 30, 2026. Progress source ↗History & full recordOriginal disclosure: Momentus agreed to carry Clustergate-2 aboard Vigoride 7 and share revenue from the service. Buyer: Not disclosed. Associated organization: DPhi Space. Project profile: DPhi Space Clustergate-2 Evidence checked 26 Nov 2026. | Contract / order disclosedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.