Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: CAPSTONE 02 lunar autonomy demonstration.
Columns & coverage · 2 empty columns hidden
1 of 1 projects have values for the selected fields. 1–2 of 2 configuration rows shown. Projects without values are hidden.
— No verified value recorded · N/A Not applicable · TBD Not yet defined · Conflict Unresolved. Configurations remain separate. Hardware ratings and plans do not establish measured performance. Open Details & sources for evidence and coverage notes.
| Configuration / project | Mass | Orbit / altitude |
|---|---|---|
| CAPSTONE 02 planned spacecraft pairConstellationCAPSTONE 02 lunar autonomy demonstrationAdvanced Space / NASA | — | Lunar near rectilinear halo orbitPlanned architecture |
The reviewed sources leave this configuration’s status open. Orbit / altitude: Lunar near rectilinear halo orbit CAPSTONE 02 planned two-spacecraft mission. Planned destination. No achieved orbit or epoch is established. Planned architecture. Included with these qualifications. Source observation: 2026-11-10. Supporting source ↗Mass: No supported value is assigned to this configuration. The recorded coverage note applies to another configuration. | ||
| CAPSTONE 02 per-spacecraft designSpacecraftCAPSTONE 02 lunar autonomy demonstrationAdvanced Space / NASA | About 400 kg Approximate mass of each complete spacecraft. Dry/wet basis is unspecified, not a computing-payload mass. Planned architecture | — |
The reviewed sources leave this configuration’s status open. Mass: About 400 kg CAPSTONE 02 individual planned spacecraft. Approximate mass of each complete spacecraft. Dry/wet basis is unspecified, not a computing-payload mass. Planned architecture. Included with these qualifications. Source observation: 2026-11-10. Supporting source ↗Orbit / altitude: No supported value is assigned to this configuration. The recorded coverage note applies to another configuration. | ||
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.