Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: Blackswan Space RPO Kit navigation computer.
Columns & coverage
1 of 1 projects have values for the selected fields. 1–2 of 2 configuration rows shown. Projects without values are hidden.
— No verified value recorded · N/A Not applicable · TBD Not yet defined · Conflict Unresolved. Configurations remain separate. Hardware ratings and plans do not establish measured performance. Open Details & sources for evidence and coverage notes.
| Configuration / project | Configuration / deployment |
|---|---|
| RPO Kit ground prototypeGround testBlackswan Space RPO Kit navigation computerBlackswan Space Ground test reported | Prototype tested at ESA’s GRALS facilityCompany ground demonstration report |
Configuration status · Ground test reported · 2026-11-26 · Status source ↗ Configuration / deployment: Prototype tested at ESA’s GRALS facility RPO Kit ground prototype. The company reported technology readiness level 5 in June 2025. Company ground demonstration report. Included with these qualifications. Source observation: 2026-11-26. Supporting source ↗ | |
| ASTRAL flight kitOrbital payloadBlackswan Space RPO Kit navigation computerBlackswan Space Planned | Planned ASTRAL flight, targeted for 2028Company announcement about planned mission |
Configuration status · Planned · 2026-11-26 · Status source ↗ Configuration / deployment: Planned ASTRAL flight, targeted for 2028 ASTRAL flight kit. This observation describes the separate flight plan, not the laboratory configuration. Company announcement about planned mission. Included with these qualifications. Source observation: 2026-11-26. Supporting source ↗ | |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.