Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: BepiColombo BELA onboard processing.
1–12 of 12 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | Frontgrade Gaisler | Supplier | Processors / accelerators LaunchedReported Frontgrade says its processor supported BELA during BepiColombo’s cruise. The instrument team identifies the flight processor as a LEON-2. Progress source ↗History & full recordOriginal disclosure: Frontgrade Gaisler’s fault-tolerant processor supports BELA’s instrument control and handling of ranging data. The BELA team identifies the flight processor as a LEON-2. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | HENSOLDT Optronics GmbH | Supplier | DemonstratedReported HENSOLDT Optronics helped the team evaluate data after BELA fired its laser in flight. History & full recordOriginal disclosure: HENSOLDT Optronics manufactured BELA’s laser and helped evaluate its first flight firings. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | Actel Corporation | Supplier | Processors / accelerators LaunchedReported The instrument team documents the Actel chip in the flight range finder design. History & full recordOriginal disclosure: An Actel RTAX2000S programmable chip performs laser pulse detection in BELA’s range finder. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | University of Bern | Consortium participant | DemonstratedReported DLR reported that the instrument processed commands and sent telemetry during the first laser checkout on September 14, 2026. Progress source ↗History & full recordOriginal disclosure: The University of Bern led BELA’s hardware phase, developed the receiver, and integrated the instrument. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | German Aerospace Center (DLR) | Consortium participant | DemonstratedReported DLR reported that the instrument processed commands and sent telemetry during the first laser checkout on September 14, 2026. Progress source ↗History & full recordOriginal disclosure: DLR co-led BELA, developed its transmitter and control electronics, and led the operations phase. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | Excelitas Technologies | Supplier | LaunchedReported The BELA instrument paper identifies the Excelitas CD 3286 detector module in the receiver design. History & full recordOriginal disclosure: Excelitas made the custom detector module that senses reflected laser pulses for BELA. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Role confirmedSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | Instituto de Astrofísica de Andalucía | Consortium participant | LaunchedReported The power converter is part of BELA’s flight electronics. The team’s paper identifies the flight model board. History & full recordOriginal disclosure: The Instituto de Astrofísica de Andalucía led work on BELA’s power converter. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: European Space Agency (ESA) | Max Planck Institute for Solar System Research | Consortium participant | DemonstratedReported BELA transmitted its first laser pulses during flight checkout on September 14, 2026. Progress source ↗History & full recordOriginal disclosure: The Max Planck Institute for Solar System Research led the laser contribution to BELA. Buyer: Not disclosed. Associated organization: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | PartnershipSource ↗ |
| BepiColombo BELA onboard processingBuyer: European Space Agency (ESA) | Airbus Defence and Space | Supplier | Payload integration LaunchedReported The Airbus-built Mercury Planetary Orbiter launched on Ariane 5 with BELA aboard. Progress source ↗History & full recordOriginal disclosure: Airbus Defence and Space designed and built the Mercury Planetary Orbiter and developed central software for its onboard computers. Buyer: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Contract / order disclosedSource ↗ |
| BepiColombo BELA onboard processingBuyer: European Space Agency (ESA) | Arianespace | Supplier | Launch capacity Work completedReported Ariane 5 launched BepiColombo on October 20, 2018 UTC, October 19 in Kourou. Progress source ↗History & full recordOriginal disclosure: Arianespace launched BepiColombo on Ariane 5 from Europe’s Spaceport in Kourou. Buyer: European Space Agency (ESA). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Contract / order disclosedDisclosure date not suppliedSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: German Aerospace Center (DLR) | German Space Agency at DLR | Programme funding contributor | Progress unconfirmed The German Space Agency at DLR funded BELA development on behalf of Germany’s federal economics ministry, including the laser contribution. History & full recordBuyer: Not disclosed. Associated organization: German Aerospace Center (DLR). Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| BepiColombo BELA onboard processingAssociated organization: University of Bern | State Secretariat for Education, Research and Innovation (SERI) | Programme funding contributor | Progress unconfirmed Switzerland’s SERI supported BELA through the PRODEX program under contract C90191. History & full recordBuyer: Not disclosed. Associated organization: University of Bern. Project profile: BepiColombo BELA onboard processing Evidence checked 26 Nov 2026. | Development agreementDisclosure date not suppliedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.