SignalSpore

SPACE DATA CENTERS
SUPPLIER INTELLIGENCE

SPACE COMPUTINGOrbital and lunar data centers
PROJECT COMPARISON

Space Data Centers Database

Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.

Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.

67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.

Which space data center projects have launched?

PROJECTS & RELATIONSHIPS

Compare the work behind each project.

Market & supply chainFinancingSuppliers
1 projects matching0 with supplier records1 no supplier record
Relationship filters

Linked view: · All relationships involving Wuhan University.

1–2 of 2 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.

Projects, organizations, roles, scope, commitment and supporting evidence.
Project / associated organizationOrganizationRoleComponent / service scopeCommitment / supporting evidence
Space Chord Computing Constellation (太空之弦)Associated organization: Oriental Starlink Space-Time Intelligence (东方星链时空智能(山东)技术发展有限公司)Wuhan UniversityResearch participantSatellite busProgress unconfirmed · Disclosure

Development of the Oriental Starlink 05/06 hyperspectral AI satellites used as Space Chord validation spacecraft.

History & full record

The source states Wuhan University developed the two satellites but does not disclose procurement terms, value, or follow-on production scope.

Buyer: Not disclosed.

Associated organization: Oriental Starlink Space-Time Intelligence (东方星链时空智能(山东)技术发展有限公司).

Project profile: Space Chord Computing Constellation (太空之弦)

Evidence checked 25 Sept 2026.

PartnershipSource ↗
STAR.VISION (地卫二空间技术(杭州)有限公司)Associated organizationCompany-level relationshipWuhan UniversityResearch participantResearch & feasibility studiesProgress unconfirmed · Disclosure

Joint design research with STAR.VISION and Oriental Spaceport for the planned Lampung-1 hyperspectral intelligent-computing satellite.

History & full record

Official joint design participation is named, but individual university workshare, contract terms, value and achieved orbital performance are not disclosed. The May 2025 launch window remains a historical target.

Buyer: Not disclosed.

Associated organization: STAR.VISION (地卫二空间技术(杭州)有限公司).

Evidence checked 14 Oct 2026.

PartnershipSource ↗
Supplier work coverage by category

Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.

Component / serviceContract awardedSupplier selectedDevelopment agreementLaunch capacity reservedPreliminary agreementPartnershipAny supplierNo supplier
Power
↳ Electrical power system
↳ Batteries
↳ Solar arrays
Spacecraft & integration
↳ Satellite bus
↳ Payload integration
Compute & storage
↳ Storage payload
↳ Processors / accelerators
↳ Photonic computing components
Thermal control
↳ Radiators / cooling
Communications
↳ Optical links
Launch
↳ Launch capacity
↳ Launch integration
Operations
↳ Mission operations
↳ Ground stations & ground segment
↳ Deployable structures
↳ Payload industrial design
↳ Flight / payload software
↳ Data services
↳ Electric propulsion
↳ Avionics / integrated electronics
↳ In-space manufacturing
↳ Spacecraft protection systems
↳ Attitude control components
Sensors & monitoring
↳ Radiation sensors
↳ Lunar payload delivery
Commercial services
↳ Cloud capacity & advisory
↳ Technical training & capability transfer
Research & feasibility studies

Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.