Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving Rapidtek Technologies Inc. (鐳洋科技股份有限公司).
1–3 of 3 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| Black Kite-1 GPU demonstrationBuyer: Rapidtek Technologies Inc. (鐳洋科技股份有限公司) | Industrial Technology Research Institute (財團法人工業技術研究院) | Research participant | Research & feasibility studies LaunchedReported Rapidtek names ITRI as a development collaborator for the satellite reported successfully deployed in November 2025. History & full recordOriginal disclosure: ITRI collaboration with Rapidtek on development of the Black Kite-1 8U satellite. The source establishes the stated role and stage. No purchase value is disclosed. Buyer: Rapidtek Technologies Inc. (鐳洋科技股份有限公司). Project profile: Black Kite-1 GPU demonstration Evidence checked 18 Nov 2026. | PartnershipSource ↗ |
| Black Kite-1 GPU demonstrationBuyer: Taiwan Space Agency (TASA) | Rapidtek Technologies Inc. (鐳洋科技股份有限公司) | Supplier | Satellite bus LaunchedReported Rapidtek reports successful launch and orbital deployment on Transporter-15 in November 2025. History & full recordOriginal disclosure: Rapidtek development and integration of the 8U Black Kite-1 spacecraft commissioned by TASA. The source establishes the stated role and stage. No purchase value is disclosed. Buyer: Taiwan Space Agency (TASA). Project profile: Black Kite-1 GPU demonstration Evidence checked 18 Nov 2026. | Contract / order disclosedSource ↗ |
| Black Kite-1 GPU demonstrationBuyer: Rapidtek Technologies Inc. (鐳洋科技股份有限公司) | SpaceX | Supplier | Launch capacity LaunchedReported Rapidtek reports that Black Kite-1 reached orbit on SpaceX Transporter-15 in November 2025. History & full recordOriginal disclosure: SpaceX Falcon 9 Transporter-15 launch of Rapidtek’s Black Kite-1 satellite. The source establishes the stated role and stage. No purchase value is disclosed. Buyer: Rapidtek Technologies Inc. (鐳洋科技股份有限公司). Project profile: Black Kite-1 GPU demonstration Evidence checked 18 Nov 2026. | Role confirmedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.