Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving MaiaSpace.
1–4 of 4 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| Altair-Next GenAssociated organization: Marlan Space | MaiaSpace | Supplier | Progress unconfirmed · Disclosure Preferred launch services for Altair-Next Gen as MaiaSpace services become commercially available. History & full recordThe announcement says preferred launch partner, not a contract or reserved capacity; the initial October launch provider is not named. Buyer: Not disclosed. Associated organization: Marlan Space. Project profile: Altair-Next Gen Evidence checked 25 Sept 2026. | Role confirmedSource ↗ |
| Institute for Q-shu Pioneers of Space, Inc. (iQPS) (株式会社QPS研究所)BuyerCompany-level relationship | MaiaSpace | Supplier | Progress unconfirmed · Disclosure Basic agreement for Maia launch services for iQPS QPS-SAR satellites from 2029, covering dedicated, shared and auxiliary-payload opportunities across multiple orbits. History & full recordiQPS explicitly describes a basic agreement. MaiaSpace also calls it a commercial agreement or contract, but neither body discloses a firm launch count, satellite allocation, price, exact mission dates or binding booking terms. Launch services start from 2029 as a plan. The September 10 announcement date is not asserted to be the signing day. MaiaSpace launcher capacity, optional Colibri stage and future launch cadence are design or roadmap claims. Buyer: Institute for Q-shu Pioneers of Space, Inc. (iQPS) (株式会社QPS研究所). Evidence checked 11 Oct 2026. | Preliminary agreementSource ↗ |
| RIDE! spaceBuyerCompany-level relationship | MaiaSpace | Supplier | Launch integrationProgress unconfirmed · Disclosure Commercial arrangement for integration of compatible auxiliary payloads alongside dedicated Maia primary missions, subject to mission requirements. History & full recordNo price, allocation, firm reserved capacity, mission count or launch date disclosed. Compatibility remains mission-dependent; the inaugural Maia flight is still future. Buyer: RIDE! space. Evidence checked 12 Oct 2026. | Contract / order disclosedSource ↗ |
| Loft OrbitalBuyerCompany-level relationship | MaiaSpace | Supplier | Launch capacityProgress unconfirmed · Disclosure Launch of multiple Loft Orbital missions from the Guiana Space Centre, starting in 2028, under the contract described by MaiaSpace. History & full recordThe source dateline is Paris, July 8, 2026; the webpage heading and current publication timestamp are July 15. Announced date refers to the dated release, not a separately proven contract-signature date. Number of missions, price, exact legal purchasing entity, individual launch dates and spacecraft/project allocations are undisclosed. The 2028 start remains prospective, and launcher specifications do not establish delivered launch performance. Buyer: Loft Orbital. Evidence checked 12 Oct 2026. | Contract / order disclosedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.