Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Saved catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Saved data as of 29 Nov 2026, 05:19 UTC. Live project and relationship data is temporarily unavailable.
Relationship filters
Linked view: · All relationships involving Guoke Huanyu (国科环宇).
1–2 of 2 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| Chenguang-1 (辰光一号)Associated organization: Guoke Huanyu (国科环宇) | Fuzhou University (福州大学) | Supplier | Electrical power systemProgress unconfirmed · Disclosure Designed and delivered the high-voltage power-control and distribution core, including a water-cooled DC-DC converter, with joint environmental testing alongside Guoke Huanyu. History & full recordBuyer: Not disclosed. Associated organization: Guoke Huanyu (国科环宇). Project profile: Chenguang-1 (辰光一号) Evidence checked 9 Nov 2026. | Role confirmedSource ↗ |
| Chenguang-1 (辰光一号)Associated organization: Beijing Xingchen Future Space Technology Research Institute (北京星辰未来空间技术研究院) | Guoke Huanyu (国科环宇) | Supplier | Avionics / integrated electronicsProgress unconfirmed · Disclosure Development of Chenguang-1 payload, integrated electronics, energy and fluid-loop cooling systems. History & full recordNamed development role within the Beijing space-data-center innovation consortium. Buyer, procurement instrument, contract value and exclusivity are not disclosed. Buyer: Not disclosed. Associated organization: Beijing Xingchen Future Space Technology Research Institute (北京星辰未来空间技术研究院). Project profile: Chenguang-1 (辰光一号) Evidence checked 25 Sept 2026. | PartnershipSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.