Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving Coros Space.
1–4 of 4 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| Lodestar Mithril flight avionicsBuyer: Lodestar Space | Coros Space | Research participant | Work completedReported Coros Space supported a completed system-level total-ionising-dose test campaign for Lodestar's Mithril GPU flight avionics. Lodestar says single-event-effects testing is the next phase. History & full recordOriginal disclosure: Coros Space supported system-level total-ionising-dose radiation testing of Lodestar's GPU-accelerated Mithril flight avionics at the Centro Nacional de Aceleradores The release reports completion of total-ionising-dose testing. It does not state a contract value, tested dose, GPU model or flight mission. Single-event-effects testing remains planned. Buyer: Lodestar Space. Project profile: Lodestar Mithril flight avionics Evidence checked 22 Nov 2026. | PartnershipSource ↗ |
| LUGENOS hybrid sensor-fusion payloadAssociated organization: Setanta Space Systems Limited | Coros Space | Strategic partner | Progress unconfirmed · Disclosure LUGENOS co-development. Coros contributes GPU edge computing, low-level software and radiation robustness. Setanta leads event-based sensing, FPGA, firmware and AI algorithms. History & full recordPDF release dated May7, news index May19. Signing date, flight mission, selected GPU model and procurement value are not established. Buyer: Not disclosed. Associated organization: Setanta Space Systems Limited. Project profile: LUGENOS hybrid sensor-fusion payload Evidence checked 2 Nov 2026. | Preliminary agreementSource ↗ |
| Madari Space LimitedAssociated organizationCompany-level relationship | Coros Space | Supplier | Progress unconfirmed · Disclosure Coros Space led and executed proton radiation testing of Madari NVMe SSD samples at PSI History & full recordCompany-level testing contribution. No fee, procurement value, flight component supply or PHI2 payload mapping is established. Buyer: Not disclosed. Associated organization: Madari Space Limited. Evidence checked 1 Nov 2026. | PartnershipSource ↗ |
| Coros SpaceAssociated organizationCompany-level relationship | ESA BIC Nord France | Investor | Investment & financingProgress unconfirmed · Disclosure Selection for up to two years of incubation, technical/scientific support, dedicated financing and ESA BIC network access. History & full recordCompany incubation support, not a hardware supply order or identified product flight. Exact monetary terms and disbursement remain undisclosed. Buyer: Not disclosed. Associated organization: Coros Space. Evidence checked 2 Nov 2026. | PartnershipSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.