Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving CAS Space (中科宇航).
1–5 of 5 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| Chaozhisuan-1 (超智算一号)Associated organization: Chaozhisuan (超智算(北京)科技有限公司) | CAS Space (中科宇航) | Supplier | Launch capacityProgress unconfirmed · Disclosure Delivered Kinetica-1 Y18 launch service for Chaozhisuan-1 on 20 September 2026. History & full recordCAS Space confirms the completed launch and named cooperation. This records a delivered supplier role; it does not assert a publicly disclosed contract award, signing date, direct legal buyer, launch price or follow-on booking. Buyer: Not disclosed. Associated organization: Chaozhisuan (超智算(北京)科技有限公司). Project profile: Chaozhisuan-1 (超智算一号) Evidence checked 26 Sept 2026. | Role confirmedSource ↗ |
| Chaozhisuan-1 (超智算一号)Associated organization: Chaozhisuan (超智算(北京)科技有限公司) | CAS Space (中科宇航) | Consortium participant | Progress unconfirmed · Disclosure CAS Space joined Chaozhisuan's technical alliance for onboard computing, inter-satellite networking and space-to-ground coordination. History & full recordBuyer: Not disclosed. Associated organization: Chaozhisuan (超智算(北京)科技有限公司). Project profile: Chaozhisuan-1 (超智算一号) Evidence checked 9 Nov 2026. | PartnershipSource ↗ |
| Chenguang-1 (辰光一号)Associated organization: Beijing Orbit Twilight Technology Co., Ltd. (北京轨道辰光科技有限公司) | CAS Space (中科宇航) | Supplier | Launch capacityProgress unconfirmed · Disclosure Delivered Kinetica-1 Y15 launch service for Chenguang-1 on 24 July 2026. History & full recordThe source establishes the named technical role. The date is the public report date, not an inferred procurement-signing date. Contracting buyer, instrument, price and exclusivity are not disclosed. Buyer: Not disclosed. Associated organization: Beijing Orbit Twilight Technology Co., Ltd. (北京轨道辰光科技有限公司). Project profile: Chenguang-1 (辰光一号) Evidence checked 26 Sept 2026. | Role confirmedSource ↗ |
| Pengcheng Tianma / PEGA-SUS1Associated organization: Peng Cheng Laboratory (鹏城实验室) | CAS Space (中科宇航) | Supplier | Launch capacityProgress unconfirmed · Disclosure Delivered Kinetica-1 Y18 launch service for the first Pengcheng Tianma satellite. History & full recordThe source establishes the named technical role. The date is the public report date, not an inferred procurement-signing date. Contracting buyer, instrument, price and exclusivity are not disclosed. Buyer: Not disclosed. Associated organization: Peng Cheng Laboratory (鹏城实验室). Project profile: Pengcheng Tianma / PEGA-SUS1 Evidence checked 26 Sept 2026. | Role confirmedSource ↗ |
| Three-Body Computing ConstellationAssociated organization: Zhejiang Lab (之江实验室) | CAS Space (中科宇航) | Supplier | Launch capacityProgress unconfirmed · Disclosure Delivered Kinetica-1 Y15 launch service for Jitian A-04 / Yunjian–MetaX. History & full recordThe source establishes the named technical role. The date is the public report date, not an inferred procurement-signing date. Contracting buyer, instrument, price and exclusivity are not disclosed. Buyer: Not disclosed. Associated organization: Zhejiang Lab (之江实验室). Project profile: Three-Body Computing Constellation Evidence checked 26 Sept 2026. | Role confirmedSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.