Space Data Centers Database
Search and compare space data center projects and related orbital computing demonstrations, including developers, technical specifications, suppliers, agreements and milestones. Follow each commitment to its original announcement.
Catalog: 281 projects. 19 proposal / study · 132 development · 35 launched · 53 demonstrated · 11 operating · 29 historical · 2 uncertain · 0 stage not assigned. These are project classifications, not spacecraft counts or verified commercial capacity.
67 projects with a recorded launch or in-space activity: 55 reviewed, 12 with review limits or awaiting review. Each project appears in one classification.
Compare the work behind each project.
Relationship filters
Linked view: · All relationships involving Argotec.
1–11 of 11 relationship records. Each row describes one contribution. An organization may have several contributions on the same project. Dates refer to disclosures or supporting evidence.
| Project / associated organization | Organization | Role | Component / service scope | Commitment / supporting evidence |
|---|---|---|---|---|
| IRIDE HEO onboard image processingBuyer: Argotec | Unibap | Supplier | Processors / acceleratorsProgress unconfirmed · Disclosure Exclusive supply of iX5, iX10, and future onboard computers for relevant Argotec missions through 2028. The framework includes the existing IRIDE HEO contract. History & full recordUnibap named USD 2,324,400 (€2 million) as the minimum across the framework. It included the existing IRIDE HEO contract. Buyer: Argotec. USD 2,324,400 (EUR 2,000,000). Minimum order value across the framework Project profile: IRIDE HEO onboard image processing Evidence checked 24 Nov 2026. | Contract / order disclosedSource ↗ |
| IRIDE HEO onboard image processingBuyer: Argotec | Unibap | Supplier | LaunchedReported Unibap reported that iX5 hardware and software flew aboard the first eight HEO satellites. It had delivered computers for the first two batches. Progress source ↗History & full recordOriginal disclosure: Unibap computing platforms delivered for 25 Argotec HEO Hawk Earth Observation satellites; LOOM role described. Supplier-stated platform delivery is distinct from launch or commissioning of all satellites. SCOS is not used on this program. Buyer: Argotec. Project profile: IRIDE HEO onboard image processing Evidence checked 8 Oct 2026. | Role confirmedSource ↗ |
| IRIDE HEO onboard image processingBuyer: Argotec | Officina Stellare S.p.A. | Supplier | Progress unconfirmed · Disclosure Supply the second batch of space telescopes for Argotec’s IRIDE HEO satellites. History & full recordBuyer: Argotec. Approximately USD 2,099,400 (EUR 2,000,000). Approximate disclosed contract value Project profile: IRIDE HEO onboard image processing Evidence checked 24 Nov 2026. | Contract / order disclosedSource ↗ |
| IRIDE HEO onboard image processingBuyer: European Space Agency (ESA) | Argotec | Supplier | Progress unconfirmed · Disclosure Build 15 additional HEO satellites under the extension of ESA’s IRIDE contract. History & full recordBuyer: European Space Agency (ESA). Project profile: IRIDE HEO onboard image processing Evidence checked 24 Nov 2026. | Contract / order disclosedSource ↗ |
| IRIDE HEO onboard image processingBuyer: Argotec | Officina Stellare S.p.A. | Supplier | Delivered / integratedReported Officina Stellare reported that the first optical units had been delivered and passed tests before it signed the second contract. Progress source ↗History & full recordOriginal disclosure: Design and supply the first batch of multispectral optical payloads for Argotec’s IRIDE HEO satellites. Buyer: Argotec. Approximately USD 3,482,820 (EUR 3,300,000). Approximate disclosed contract value Project profile: IRIDE HEO onboard image processing Evidence checked 24 Nov 2026. | Contract / order disclosedSource ↗ |
| IRIDE HEO onboard image processingBuyer: European Space Agency (ESA) | Argotec | Supplier | Progress unconfirmed · Disclosure Build and deliver the first ten HEO satellites and develop their flight operations system. History & full recordBuyer: European Space Agency (ESA). Project profile: IRIDE HEO onboard image processing Evidence checked 24 Nov 2026. | Contract / order disclosedSource ↗ |
| IRIDE HEO onboard image processingAssociated organization: Argotec | Agenzia Spaziale italiana (ASI) | Programme support | Progress unconfirmed Support ESA in coordinating Italy’s IRIDE program, including the HEO constellation. History & full recordBuyer: Not disclosed. Associated organization: Argotec. Project profile: IRIDE HEO onboard image processing Evidence checked 24 Nov 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| IRIDE HEO onboard image processingAssociated organization: Argotec | European Space Agency (ESA) | Programme support | Progress unconfirmed Coordinate the IRIDE Earth observation program, including the HEO constellation. History & full recordBuyer: Not disclosed. Associated organization: Argotec. Project profile: IRIDE HEO onboard image processing Evidence checked 24 Nov 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| OCC4SATBuyer: Universidad de Las Palmas de Gran Canaria | Argotec | Consortium participant | Progress unconfirmed Space-engineering consortium participant in OCC4SAT internal optical data-transfer research. History & full recordBuyer: Universidad de Las Palmas de Gran Canaria. Project profile: OCC4SAT Evidence checked 18 Nov 2026. | PartnershipDisclosure date not suppliedSource ↗ |
| ArgotecBuyerCompany-level relationship | Sidus Space | Supplier | PlannedReported Sidus expects to deliver the cable assemblies in the first quarter of 2027. History & full recordOriginal disclosure: Manufacture cable assemblies for Argotec’s HAWK satellite platform. Sidus expects to deliver them in the first quarter of 2027. Sidus identified the satellite platform but did not specify a mission or satellite batch. Buyer: Argotec. Evidence checked 26 Nov 2026. | Contract / order disclosedSource ↗ |
| ArgotecBuyerCompany-level relationship | NUO Space S.p.A. | Investor | Investment & financingProgress unconfirmed · Disclosure NUO Space subscribed to Argotec’s October 2026 equity round. | PartnershipSource ↗ |
Supplier work coverage by category
Distinct projects with a disclosed supplier or host in each work category. Investors, research participants and other partnership roles are excluded from supplier coverage. Click a count to see the matching projects. Columns overlap; do not add them together.
| Component / service | Contract awarded | Supplier selected | Development agreement | Launch capacity reserved | Preliminary agreement | Partnership | Any supplier | No supplier |
|---|---|---|---|---|---|---|---|---|
| Power | ||||||||
| ↳ Electrical power system | ||||||||
| ↳ Batteries | ||||||||
| ↳ Solar arrays | ||||||||
| Spacecraft & integration | ||||||||
| ↳ Satellite bus | ||||||||
| ↳ Payload integration | ||||||||
| Compute & storage | ||||||||
| ↳ Storage payload | ||||||||
| ↳ Processors / accelerators | ||||||||
| ↳ Photonic computing components | ||||||||
| Thermal control | ||||||||
| ↳ Radiators / cooling | ||||||||
| Communications | ||||||||
| ↳ Optical links | ||||||||
| Launch | ||||||||
| ↳ Launch capacity | ||||||||
| ↳ Launch integration | ||||||||
| Operations | ||||||||
| ↳ Mission operations | ||||||||
| ↳ Ground stations & ground segment | ||||||||
| ↳ Deployable structures | ||||||||
| ↳ Payload industrial design | ||||||||
| ↳ Flight / payload software | ||||||||
| ↳ Data services | ||||||||
| ↳ Electric propulsion | ||||||||
| ↳ Avionics / integrated electronics | ||||||||
| ↳ In-space manufacturing | ||||||||
| ↳ Spacecraft protection systems | ||||||||
| ↳ Attitude control components | ||||||||
| Sensors & monitoring | ||||||||
| ↳ Radiation sensors | ||||||||
| ↳ Lunar payload delivery | ||||||||
| Commercial services | ||||||||
| ↳ Cloud capacity & advisory | ||||||||
| ↳ Technical training & capability transfer | ||||||||
| Research & feasibility studies |
Technical specifications retain the source’s original units and evidence status. Hardware counts, compute rates and power are not equivalent; launched hardware does not establish demonstrated performance. Supplier counts include suppliers and hosts only, reflect current filters and cover this directory, not the entire market. “No record” means no disclosure captured; it does not mean the work is unawarded. Latest developments use source dates, not routine review or collection dates.