SignalSpore

SPACE DATA CENTERS
SUPPLIER INTELLIGENCE

SPACE COMPUTINGOrbital and lunar data centers
← All projects

United States · Shared orbital computing and storage service

Atomic-6 ODC.space orbital data centers

Atomic-6’s ODC.space offers planned orbital computing capacity with spacecraft integration, launch and operations included. Customers supply their computing hardware and choose a dedicated or shared service. The April 2026 announcement targets delivery two to three years after an order.

Atomic-6DevelopmentPlanned

Scope: Shared computing & storage · A planned service hosts customer computing hardware in dedicated or shared orbital data centers.

Technical overview

Compare technical specifications →

Planned service specification

Configuration / deployment
Delivery two to three years after orderingodc service design
Notes & source

Configuration: odc-service-design

Commercial lead-time target, without a fixed launch date.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Compute hardware
Customer-provided rack computersodc service design
Notes & source

Configuration: odc-service-design

Processor selection depends on the customer order.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
IT electrical power
48 V DC ±5%, maximum 23.4 A per rack unitodc service design
Notes & source

Configuration: odc-service-design

Planned equipment interface. Storefront advertises 2.5 kW per unit, an unresolved allocation difference. No aggregate IT load inferred.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Heat rejection
Water/glycol loop, 0.35 kg/s nominal flow with ±30% toleranceodc service design
Notes & source

Configuration: odc-service-design

60/40 mixture. Flow is not a numerical heat-rejection rating.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Thermal operating boundary
Customer hardware operating range 0–80 °Codc service design
Notes & source

Configuration: odc-service-design

Equipment requirement, not spacecraft thermal limits.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Orbit / altitude
Sun-synchronous low Earth orbitodc service design
Notes & source

Configuration: odc-service-design

Planned orbit class, without an altitude.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Ground communications
Cloud VM separates user workloads from flight controlodc service design
Notes & source

Configuration: odc-service-design

AWS and Azure are examples, not evidenced awarded suppliers.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Communications (boundary unspecified)
Connectivity offered from 1 Gbpsodc service design
Notes & source

Configuration: odc-service-design

Advertised external service rate, with physical route and ground versus relay boundary unallocated.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
100 GB monthly data allowance1u collocated
Notes & source

Configuration: 1u-collocated

Subscription allowance, not a physical link rate or arithmetic throughput.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
1000 GB monthly data allowance4u sovereign
Notes & source

Configuration: 4u-sovereign

Subscription allowance, not a physical link rate or arithmetic throughput.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
5000 GB monthly data allowance42u sovereign
Notes & source

Configuration: 42u-sovereign

Subscription allowance, not a physical link rate or arithmetic throughput.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Design life / mission duration
Five-year service, with an optional two-year extensionodc service design
Notes & source

Configuration: odc-service-design

Service duration after activation, not demonstrated spacecraft life.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Physical envelope
19-inch racks with 1U to 7U customer modulesodc service design
Notes & source

Configuration: odc-service-design

Interface envelope, not total spacecraft dimensions.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Other specifications
Light Wing arrays, Hot Wing radiators and Space Armor protectionodc service design
Notes & source

Configuration: odc-service-design

Named enabling architecture, without a confirmed flight configuration.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
10 GbE between customer equipment and spacecraft communicationsodc service design
Notes & source

Configuration: odc-service-design

Internal interface, not a downlink or inter-satellite rate.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Expected dose 5–7 krad over five to seven yearsodc service design
Notes & source

Configuration: odc-service-design

Planning environment, not a tested tolerance or measured mission dose.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Checkout allowance up to 30 days after releaseodc service design
Notes & source

Configuration: odc-service-design

Planned commissioning process, not a completed flight result.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Integration at 20 °C ±3 °C and 25–60% humidity in ISO 8 facilitiesodc service design
Notes & source

Configuration: odc-service-design

Ground processing environment only.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Customer material limits: TML ≤1%, CVCM ≤0.1%odc service design
Notes & source

Configuration: odc-service-design

Outgassing requirements, not measured hardware results.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
Reference configurations & supporting specifications (3)

Planned service specification

Electrical power (boundary unresolved)
2.5 kW advertised service allocation1u collocated
Notes & source

Configuration: 1u-collocated

Storefront plan. Equipment power differs from the service guide allocation, and 105 kW differs from the release’s up-to-100 kW class. No installed flight capacity inferred.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
10 kW advertised service allocation4u sovereign
Notes & source

Configuration: 4u-sovereign

Storefront plan. Equipment power differs from the service guide allocation, and 105 kW differs from the release’s up-to-100 kW class. No installed flight capacity inferred.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗
105 kW advertised service allocation42u sovereign
Notes & source

Configuration: 42u-sovereign

Storefront plan. Equipment power differs from the service guide allocation, and 105 kW differs from the release’s up-to-100 kW class. No installed flight capacity inferred.

Evidence basis: Planned service specification

Source / observation date: .

Supporting source ↗

Figures retain their disclosed units and scope. Launched hardware does not establish demonstrated performance; targets may change. Not disclosed means no figure in the reviewed sources.

Organizations & responsibilities

Project organizations

NEXT MILESTONE

Customer orders, mission configurations and launch arrangements would establish the first deployment schedule.

Manual review 22 Nov 2026. Compared the current ODC.space storefront, service guide and issuer release. The rack options, interfaces, service term and unresolved storefront power allocations remain accurately recorded. No launched customer configuration or installed performance result was disclosed. Primary body last observed not available. Source monitoring: unavailable. Source collection and substantive profile review are separate checks. Plans and dates may change.

Atomic-6 ODC.space launch announcement (opens in a new tab)
WHAT REMAINS UNKNOWN
  • First contracted mission, launch date and current deployment status.
  • Installed processor models, throughput, RAM and storage capacities.
  • Power allocation conflict between storefront plans and the service guide, and spacecraft-level generation and demand.
  • Configuration-specific mass, dimensions, radiator capacity and orbital altitude.

Project updates

Verified announcements and milestones linked to this project, newest first.