← All projects United States · Shared orbital computing and storage service
Atomic-6 ODC.space orbital data centers Atomic-6’s ODC.space offers planned orbital computing capacity with spacecraft integration, launch and operations included. Customers supply their computing hardware and choose a dedicated or shared service. The April 2026 announcement targets delivery two to three years after an order.
Atomic-6 Development Planned
Scope: Shared computing & storage · A planned service hosts customer computing hardware in dedicated or shared orbital data centers.
Technical overview · Organizations & responsibilities · Project updates
Technical overview Compare technical specifications →
Planned service specification
Configuration / deployment Delivery two to three years after ordering odc service design Notes & source Configuration: odc-service-design
Commercial lead-time target, without a fixed launch date.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Compute hardware Customer-provided rack computers odc service design Notes & source Configuration: odc-service-design
Processor selection depends on the customer order.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ IT electrical power 48 V DC ±5%, maximum 23.4 A per rack unit odc service design Notes & source Configuration: odc-service-design
Planned equipment interface. Storefront advertises 2.5 kW per unit, an unresolved allocation difference. No aggregate IT load inferred.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Heat rejection Water/glycol loop, 0.35 kg/s nominal flow with ±30% tolerance odc service design Notes & source Configuration: odc-service-design
60/40 mixture. Flow is not a numerical heat-rejection rating.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Thermal operating boundary Customer hardware operating range 0–80 °C odc service design Notes & source Configuration: odc-service-design
Equipment requirement, not spacecraft thermal limits.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Orbit / altitude Sun-synchronous low Earth orbit odc service design Notes & source Configuration: odc-service-design
Planned orbit class, without an altitude.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Ground communications Cloud VM separates user workloads from flight control odc service design Notes & source Configuration: odc-service-design
AWS and Azure are examples, not evidenced awarded suppliers.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Communications (boundary unspecified) Connectivity offered from 1 Gbps odc service design Notes & source Configuration: odc-service-design
Advertised external service rate, with physical route and ground versus relay boundary unallocated.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ 100 GB monthly data allowance 1u collocated Notes & source Configuration: 1u-collocated
Subscription allowance, not a physical link rate or arithmetic throughput.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ 1000 GB monthly data allowance 4u sovereign Notes & source Configuration: 4u-sovereign
Subscription allowance, not a physical link rate or arithmetic throughput.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ 5000 GB monthly data allowance 42u sovereign Notes & source Configuration: 42u-sovereign
Subscription allowance, not a physical link rate or arithmetic throughput.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Design life / mission duration Five-year service, with an optional two-year extension odc service design Notes & source Configuration: odc-service-design
Service duration after activation, not demonstrated spacecraft life.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Physical envelope 19-inch racks with 1U to 7U customer modules odc service design Notes & source Configuration: odc-service-design
Interface envelope, not total spacecraft dimensions.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Other specifications Light Wing arrays, Hot Wing radiators and Space Armor protection odc service design Notes & source Configuration: odc-service-design
Named enabling architecture, without a confirmed flight configuration.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ 10 GbE between customer equipment and spacecraft communications odc service design Notes & source Configuration: odc-service-design
Internal interface, not a downlink or inter-satellite rate.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Expected dose 5–7 krad over five to seven years odc service design Notes & source Configuration: odc-service-design
Planning environment, not a tested tolerance or measured mission dose.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Checkout allowance up to 30 days after release odc service design Notes & source Configuration: odc-service-design
Planned commissioning process, not a completed flight result.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Integration at 20 °C ±3 °C and 25–60% humidity in ISO 8 facilities odc service design Notes & source Configuration: odc-service-design
Ground processing environment only.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Customer material limits: TML ≤1%, CVCM ≤0.1% odc service design Notes & source Configuration: odc-service-design
Outgassing requirements, not measured hardware results.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Reference configurations & supporting specifications (3) Planned service specification
Electrical power (boundary unresolved) 2.5 kW advertised service allocation 1u collocated Notes & source Configuration: 1u-collocated
Storefront plan. Equipment power differs from the service guide allocation, and 105 kW differs from the release’s up-to-100 kW class. No installed flight capacity inferred.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ 10 kW advertised service allocation 4u sovereign Notes & source Configuration: 4u-sovereign
Storefront plan. Equipment power differs from the service guide allocation, and 105 kW differs from the release’s up-to-100 kW class. No installed flight capacity inferred.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ 105 kW advertised service allocation 42u sovereign Notes & source Configuration: 42u-sovereign
Storefront plan. Equipment power differs from the service guide allocation, and 105 kW differs from the release’s up-to-100 kW class. No installed flight capacity inferred.
Evidence basis: Planned service specification
Source / observation date: 2026-11-13 .
Supporting source ↗ Figures retain their disclosed units and scope. Launched hardware does not establish demonstrated performance; targets may change. Not disclosed means no figure in the reviewed sources.
Organizations & responsibilities Project organizations Service developer
Offers planned orbital computing capacity through ODC.space, including spacecraft integration, launch, and operations.
Company information Atomic-6 develops advanced composite materials and structures for aerospace and other demanding applications.
Location Marietta, United States Company information checked 11 Nov 2026 Sources for Atomic-6 NEXT MILESTONE Customer orders, mission configurations and launch arrangements would establish the first deployment schedule. Manual review 22 Nov 2026. Compared the current ODC.space storefront, service guide and issuer release. The rack options, interfaces, service term and unresolved storefront power allocations remain accurately recorded. No launched customer configuration or installed performance result was disclosed. Primary body last observed not available. Source monitoring: unavailable. Source collection and substantive profile review are separate checks. Plans and dates may change.
Atomic-6 ODC.space launch announcement (opens in a new tab) WHAT REMAINS UNKNOWN First contracted mission, launch date and current deployment status. Installed processor models, throughput, RAM and storage capacities. Power allocation conflict between storefront plans and the service guide, and spacecraft-level generation and demand. Configuration-specific mass, dimensions, radiator capacity and orbital altitude. Project updates Verified announcements and milestones linked to this project, newest first.
13 Apr 2026