A team developing an AI application for space has several routes to NVIDIA hardware: integrate a computer into its own spacecraft, deploy software on a shared satellite, or access processing through an orbital network. EDGX, Loft and Orbitworks, and Kepler illustrate those choices. The important commercial difference is how much of the mission the customer needs to own.
Start with what the customer needs to control
EDGX offers Sterna as a computer for integration into a customer’s satellite. Its product page identifies Jetson Orin NX hardware and integration resources, with mass-production readiness targeted for 2027. This route suits a team that needs computing closely coupled to its own payload and spacecraft design.[2]
Loft and Orbitworks describe applications running on shared satellite infrastructure. Their first constellation spacecraft carries two Jetson AGX Orin modules, with onboard models and an application-store approach. For an application developer, the attraction is access to spacecraft resources through the platform operator.[3]
Kepler places computing within an optical communications network. Its Tranche 1 announcement reports commissioned processing across ten satellites, powered by 40 Jetson Orin modules. Kepler describes support for multiple customers and workloads, including single-node and distributed execution.[4]
Our assessment: these approaches move different responsibilities to the provider. A hardware purchase leaves the customer responsible for its spacecraft and mission integration. A hosted application relies on the operator’s deployment environment. Network-accessible processing adds connectivity and scheduling to the service relationship. Specific availability, compatibility and commercial terms require confirmation with each provider.
Which hardware has reported flight evidence?
Selected NVIDIA deployments and their reported results
Company disclosures checked 9 November 2026. Each row describes a specific configuration and evidence boundary.
| Program | NVIDIA hardware | Reported evidence |
|---|---|---|
| EDGX Sterna | Jetson platform. The flight update does not identify the flown variant. | Two payloads launched in March 2026. Initial operational data from one; second awaiting commissioning in the 28 October update.[1] |
| Loft / Orbitworks first constellation satellite | Two Jetson AGX Orin modules. | Launched 1 October 2026. Onboard AI models reported in the 12 October release.[3] |
| Kepler Tranche 1 | 40 Jetson Orin modules across ten satellites. | Distributed computing commissioned, according to the 16 March 2026 announcement.[4] |
| Starcloud-1 | H100 GPU. | November 2025 launch. Operator reports model execution and NanoGPT training in orbit.[5] |
Starcloud-1 adds a different hardware example: a data-center-class accelerator used for an orbital demonstration. Its reported training result and the Jetson deployments above address different workloads and configurations. They provide evidence of useful computing in space, while leaving workload-specific performance and service capacity to be assessed individually.
The next hardware step follows the access model
EDGX’s roadmap separates the existing flight from two booked 2027 missions: Sterna using Orin NX in Super Mode, followed by Morus using Jetson Thor.[1] Loft identifies IGX Thor and Space-1 Vera Rubin as technologies being evaluated for later constellation satellites.[3]
That creates a practical starting point for buyers and developers. A team building a spacecraft can evaluate hardware integration and delivery timing. A team building an application can investigate the operator’s supported models, deployment process and access to mission data. A team needing processing across multiple spacecraft can examine the network service and how work moves between nodes.
For specialist suppliers, the same choices identify different customers: computer builders, satellite-platform operators and network operators. Integration software, workload validation and operational support can be offered against a specific architecture and customer responsibility. Those are potential contributions identified by our analysis, with procurement determined by the individual program.
How this comparison was made
We selected examples from SignalSpore’s existing coverage and rechecked the original operator and manufacturer disclosures. This is a focused comparison of access models and reported flight evidence, rather than a complete market inventory. Product specifications, flight configurations and future hardware evaluations are kept separate. No common performance benchmark, installed capacity total or market share is calculated.
Sources
- EDGX, Sterna flight update and 2027 Orin/Thor missions. 28 October 2026.
- EDGX, Sterna product and integration information. Accessed 9 November 2026.
- Loft Orbital, Orbitworks flight hardware, onboard applications and future evaluations. 12 October 2026.
- Kepler Communications, commissioned Tranche 1 computing and NVIDIA modules. 16 March 2026.
- Starcloud, Starcloud-1 H100 mission and reported AI demonstrations. Accessed 9 November 2026.