Changes intelligence

Materiality, category and time-window view of offshore market moves

Track source-backed public changes by commercial category, materiality, first-disclosed window and effective window without mixing baselines or quarantined candidates into the feed.

458matching changes
19material on this page
5commercial categories shown
all timefirst-disclosed window

458 published historical changes

Default presentation foregrounds commercially meaningful changes while retaining the auditable complete event history. Filter by materiality, commercial category, time window, owner, source, customer, region, asset type, effective date and disclosure date.

Showing 125 of 458
New contract
Contract award announced

VALARIS DS-4

Petrobras / Brazil

New firm assignment: Nov 2027 – Oct 2030

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 November 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Drillships

New excerpt: VALARIS DS-4 | Samsung 96K | Petrobras | Brazil | Nov 27 | Oct 30 | Previous day rate of $450,000 has been adjusted, reducing contract backlog from Apr 2026 to Nov 2027 by approx. $21 million. Plus mobilization fee of approx. $41 million. Contract includes MPD and additional services. Contracted revenue backlog of approx. $447 million for 1,064-day extension

Before: No matching interval in the previous accepted report

After: Petrobras / Brazil · Nov 2027 – Oct 2030

New contract
Contract award announced

VALARIS 115

Shell / Brunei

New firm assignment: Apr 2027 – Apr 2029

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 April 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Benign Environment Jackups

New excerpt: VALARIS 115 | BM Pacific Class 400 | Shell | Brunei | Apr 27 | Apr 29 | TCV of approx. $159 million based on duration of four years Contracted revenue backlog of approx. $78 million for two-year extension

Before: No matching interval in the previous accepted report

After: Shell / Brunei · Apr 2027 – Apr 2029

New contract
Firm assignment first disclosed

VALARIS 107

GB Energy / Australia

New firm assignment: Nov 2026 – Mar 2027

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 November 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Benign Environment Jackups

New excerpt: VALARIS 107 | KFELS MOD V-B | GB Energy | Australia | Nov 26 | Mar 27 | $163,000 | TCV of approx. $27 million based on estimated duration of 150 days

Before: No matching interval in the previous accepted report

After: GB Energy / Australia · Nov 2026 – Mar 2027

Option added
Option period added

VALARIS 121

Adura / UK

Priced option: Oct 2026 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 31 October 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 121 | KFELS Super A | Adura | UK | Oct 26 | TCV of approx. $55 million based on estimated duration of 406 days Contracted revenue backlog of over $25 million based on estimated duration of 194 days. Option with an estimated duration of 150 to 200 days

Before: No matching interval in the previous accepted report

After: Adura / UK · Oct 2026 – Schedule not disclosed

New contract
Contract award announced

VALARIS 122

INEOS / UK

New firm assignment: Sept 2026 – Feb 2027

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 September 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 122 | KFELS Super A | INEOS | UK | Sep 26 | Feb 27 | $115,000 | Contracted revenue backlog of approx. $28 million for extensions totaling 243 days . The extensions are for accommodation support Options with an estimated total duration of 825 days for work in the UK and Danish North Sea

Before: No matching interval in the previous accepted report

After: INEOS / UK · Sept 2026 – Feb 2027

New contract
Contract award announced

VALARIS 248

Eni / UK

New firm assignment: Aug 2026 – Jan 2028

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 August 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 248 | LT Super Gorilla | Eni | UK | Aug 26 | Jan 28 | Contracted revenue backlog of approx. $16 million for 224-day contract to provide accommodation support services. Expect approx 15 days out of service for planned maintenance in 2Q26 TCV of approx. $84 million for 730-day contract to perform P&A and CCS work. Two 3-month options. VALARIS 120 will substitute for VALARIS 248 while the rig completes another customer's program and a special periodic survey

Before: No matching interval in the previous accepted report

After: Eni / UK · Aug 2026 – Jan 2028

New contract
Firm assignment first disclosed

VALARIS DS-12

BP / Egypt

New firm assignment: Apr 2026 – Apr 2027

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 April 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Drillships

New excerpt: VALARIS DS-12 | DSME 12000 | BP | Egypt | Apr 26 | Apr 27 | TCV, based on estimated duration of 350 days, is approx. $140 million, inclusive of MPD and mobilization. Three option wells

Before: No matching interval in the previous accepted report

After: BP / Egypt · Apr 2026 – Apr 2027

New contract
Contract award announced

VALARIS 106

Medco Energi / Indonesia

New firm assignment: Apr 2026 – Jun 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 April 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Benign Environment Jackups

New excerpt: VALARIS 106 | KFELS MOD V-B | Medco Energi | Indonesia | Apr 26 | Jun 26 | $95,000 | TCV of $5.4 million based on minimum duration of 45 days Expect out of service time for leg repairs in 2Q26; duration to be determined upon rig's arrival at shipyard in Singapore TCV of approx. $74 million based on estimated duration of two years. Four 1-well options

Before: No matching interval in the previous accepted report

After: Medco Energi / Indonesia · Apr 2026 – Jun 2026

Contract shortened
Firm end revised

VALARIS 121

Adura / UK

Firm end moved: Sept 2026 → Oct 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 February 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Harsh Environment Jackups

Previous excerpt: VALARIS 121 | KFELS Super A | Adura | UK | Feb 26 | Sep 26 | TCV of approx. $55 million based on estimated duration of 406 days Contracted revenue backlog for 194-day extension is over $25 million. Option with an estimated duration of 150 to 200 days

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 121 | KFELS Super A | Adura | UK | Feb 26 | Oct 26 | TCV of approx. $55 million based on estimated duration of 406 days Contracted revenue backlog of over $25 million based on estimated duration of 194 days. Option with an estimated duration of 150 to 200 days

Before: Adura / UK · Feb 2026 – Sept 2026

After: Adura / UK · Feb 2026 – Oct 2026

Contract shortened
Firm end revised

VALARIS 120

Eni / UK

Firm end moved: Jul 2026 → Aug 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 January 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Harsh Environment Jackups

Previous excerpt: VALARIS 120 | KFELS Super A | Eni | UK | Jan 26 | Jul 26 | $166,000 | Contract suspended effective Dec 2025 VALARIS 120 will substitute for VALARIS 248 from Jan 2026 to Jul 2026 , while VALARIS 248 completes another customer's program and a special periodic survey

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 120 | KFELS Super A | Eni | UK | Jan 26 | Aug 26 | VALARIS 120 will substitute for VALARIS 248 from Jan 2026 to Aug 2026 , while VALARIS 248 completes another customer's program and a special periodic survey

Before: Eni / UK · Jan 2026 – Jul 2026

After: Eni / UK · Jan 2026 – Aug 2026

Contract shortened
Firm end revised

VALARIS 122

Adura / UK

Firm end moved: Apr 2026 → Aug 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 January 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Harsh Environment Jackups

Previous excerpt: VALARIS 122 | KFELS Super A | Adura | UK | Jan 26 | Apr 26 | TCV of over $60 million based on initial estimated duration of 500 days Contracted revenue backlog for the 31-day extension is over $3.5 million. The extension is for accommodation support Contracted revenue backlog for contract extensions totaling 120 days is over $13 million . The extensions are for accommodation support

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 122 | KFELS Super A | Adura | UK | Jan 26 | Aug 26 | $115,000 | Contracted revenue backlog of approx. $28 million for extensions totaling 243 days . The extensions are for accommodation support Options with an estimated total duration of 825 days for work in the UK and Danish North Sea

Before: Adura / UK · Jan 2026 – Apr 2026

After: Adura / UK · Jan 2026 – Aug 2026

Contract shortened
Firm end revised

VALARIS 123

TAQA / Netherlands

Firm end moved: Jan 2026 → Aug 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 January 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Harsh Environment Jackups

Previous excerpt: VALARIS 123 | KFELS Super A | TAQA | Netherlands | Jan 26 | Jan 26 | $163,000 | Accommodation support. Four 1-month priced options

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 123 | KFELS Super A | TAQA | Netherlands | Jan 26 | Aug 26 | $80,000 | Accommodation support

Before: TAQA / Netherlands · Jan 2026 – Jan 2026

After: TAQA / Netherlands · Jan 2026 – Aug 2026

Contract shortened
Firm end revised

VALARIS 248

GE Vernova / UK

Firm end moved: Apr 2026 → Jun 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 November 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Harsh Environment Jackups

Previous excerpt: VALARIS 248 | LT Super Gorilla | GE Vernova | UK | Nov 25 | Apr 26 | Contracted revenue backlog of over $10 million for 150-day contract to provide accommodation support services. Priced options with a total duration of 74 days . Expect approx 15 days out of service for planned maintenance in 2Q26 TCV of approx. $84 million for 730-day contract to perform P&A and CCS work. Two 3-month options. VALARIS 120 will substitute for VALARIS 248 while the rig completes another customer's program and a special periodic survey

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 248 | LT Super Gorilla | GE Vernova | UK | Nov 25 | Jun 26 | Contracted revenue backlog of approx. $16 million for 224-day contract to provide accommodation support services. Expect approx 15 days out of service for planned maintenance in 2Q26 TCV of approx. $84 million for 730-day contract to perform P&A and CCS work. Two 3-month options. VALARIS 120 will substitute for VALARIS 248 while the rig completes another customer's program and a special periodic survey

Before: GE Vernova / UK · Nov 2025 – Apr 2026

After: GE Vernova / UK · Nov 2025 – Jun 2026

Contract shortened
Firm end revised

VALARIS 107

ExxonMobil / Australia

Firm end moved: Sept 2026 → Oct 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 November 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Benign Environment Jackups

Previous excerpt: VALARIS 107 | KFELS MOD V-B | ExxonMobil | Australia | Nov 25 | Sep 26 | $153,000 $163,000 | TCV of approx. $27 million based on estimated duration of 150 days

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Benign Environment Jackups

New excerpt: VALARIS 107 | KFELS MOD V-B | ExxonMobil | Australia | Nov 25 | Oct 26 | $163,000 | TCV of approx. $27 million based on estimated duration of 150 days

Before: ExxonMobil / Australia · Nov 2025 – Sept 2026

After: ExxonMobil / Australia · Nov 2025 – Oct 2026

Contract shortened
Firm end revised

SAR 201

Saudi Aramco / Saudi Arabia

Firm end moved: Mar 2026 → Jun 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 February 2018

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Jackup Rigs Owned by ARO Drilling

Previous excerpt: SAR 201 | BM 200-H | Saudi Aramco | Saudi Arabia | Feb 18 | Mar 26 | Expect approx. 30 days out of service for planned maintenance in 3Q26

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Jackup Rigs Owned by ARO Drilling

New excerpt: SAR 201 | BM 200-H | Saudi Aramco | Saudi Arabia | Feb 18 | Jun 26 | Expect approx. 30 days out of service for planned maintenance in 3Q26

Before: Saudi Aramco / Saudi Arabia · Feb 2018 – Mar 2026

After: Saudi Aramco / Saudi Arabia · Feb 2018 – Jun 2026

Contract shortened
Firm end revised

SAR 202

Saudi Aramco / Saudi Arabia

Firm end moved: Mar 2026 → Jun 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 October 2017

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Jackup Rigs Owned by ARO Drilling

Previous excerpt: SAR 202 | KFELS Super B | Saudi Aramco | Saudi Arabia | Oct 17 | Mar 26 | Expect approx. 15 days out of service for planned maintenance in 3Q26

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Jackup Rigs Owned by ARO Drilling

New excerpt: SAR 202 | KFELS Super B | Saudi Aramco | Saudi Arabia | Oct 17 | Jun 26 | Expect approx. 15 days out of service for planned maintenance in 3Q26

Before: Saudi Aramco / Saudi Arabia · Oct 2017 – Mar 2026

After: Saudi Aramco / Saudi Arabia · Oct 2017 – Jun 2026

Contract shortened
Firm end revised

Gilbert Rowe

Saudi Aramco / Saudi Arabia

Firm end moved: Mar 2026 → Jun 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 October 2017

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Jackup Rigs Owned by ARO Drilling

Previous excerpt: Gilbert Rowe | LT 116-C | Saudi Aramco | Saudi Arabia | Oct 17 | Mar 26 | Expect approx. 30 days out of service for planned maintenance in 3Q26

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Jackup Rigs Owned by ARO Drilling

New excerpt: Gilbert Rowe | LT 116-C | Saudi Aramco | Saudi Arabia | Oct 17 | Jun 26 | Expect approx. 30 days out of service for planned maintenance in 3Q26

Before: Saudi Aramco / Saudi Arabia · Oct 2017 – Mar 2026

After: Saudi Aramco / Saudi Arabia · Oct 2017 – Jun 2026

Contract shortened
Firm end revised

J.P. Bussell

Saudi Aramco / Saudi Arabia

Firm end moved: Mar 2026 → Jun 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 October 2017

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Jackup Rigs Owned by ARO Drilling

Previous excerpt: J.P. Bussell | LT Tarzan 225-C | Saudi Aramco | Saudi Arabia | Oct 17 | Mar 26 | Expect approx. 10 days out of service for planned maintenance in 1Q26

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Jackup Rigs Owned by ARO Drilling

New excerpt: J.P. Bussell | LT Tarzan 225-C | Saudi Aramco | Saudi Arabia | Oct 17 | Jun 26

Before: Saudi Aramco / Saudi Arabia · Oct 2017 – Mar 2026

After: Saudi Aramco / Saudi Arabia · Oct 2017 – Jun 2026

Contract shortened
Firm end revised

Bob Keller

Saudi Aramco / Saudi Arabia

Firm end moved: Mar 2026 → Jun 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 October 2017

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Jackup Rigs Owned by ARO Drilling

Previous excerpt: Bob Keller | LT Tarzan 225-C | Saudi Aramco | Saudi Arabia | Oct 17 | Mar 26 | Expect approx. 30 days out of service for planned maintenance in 3Q26

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Jackup Rigs Owned by ARO Drilling

New excerpt: Bob Keller | LT Tarzan 225-C | Saudi Aramco | Saudi Arabia | Oct 17 | Jun 26 | Expect approx. 30 days out of service for planned maintenance in 3Q26

Before: Saudi Aramco / Saudi Arabia · Oct 2017 – Mar 2026

After: Saudi Aramco / Saudi Arabia · Oct 2017 – Jun 2026

Option added
Option period added

Transocean Barents

Vår Energi ASA / Norway

Priced option: Jul 2030 – Jul 2034

Event source: Transocean
Disclosed in report: 1 May 2026
Effective: 1 July 2030

Evidence and before/after facts

Previous source: February 2026 Fleet Status Report — 1 February 2026

Previous source URL: Source URL

Previous document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: May 2026 Fleet Status Report — 1 May 2026

New source URL: Source URL

New document hash: c3fc08fc190a4ca94cc494efe9d0356a5ed616d079890c075a20ede51b34872f

New page/section: Page not identified

New excerpt: 1, 2 Norway Vår Energi ASA Priced Options Jul-30 Jul-34 Not Disclosed

Before: No matching interval in the previous accepted report

After: Vår Energi ASA / Norway · Jul 2030 – Jul 2034

New contract
Firm assignment first disclosed

Transocean Barents

Vår Energi ASA / Norway

New firm assignment: Jul 2027 – Jul 2030

Event source: Transocean
Disclosed in report: 1 May 2026
Effective: 1 July 2027

Evidence and before/after facts

Previous source: February 2026 Fleet Status Report — 1 February 2026

Previous source URL: Source URL

Previous document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: May 2026 Fleet Status Report — 1 May 2026

New source URL: Source URL

New document hash: c3fc08fc190a4ca94cc494efe9d0356a5ed616d079890c075a20ede51b34872f

New page/section: Page not identified

New excerpt: 1, 2 Norway Vår Energi ASA Firm Jul-27 Jul-30 451,000

Before: No matching interval in the previous accepted report

After: Vår Energi ASA / Norway · Jul 2027 – Jul 2030

Shipyard or downtime
Out-of-service period added

Transocean Barents

Customer undisclosed / Region not verified

Out-of-service period: Mar 2027 – Jul 2027

Event source: Transocean
Disclosed in report: 1 May 2026
Effective: 1 March 2027

Evidence and before/after facts

Previous source: February 2026 Fleet Status Report — 1 February 2026

Previous source URL: Source URL

Previous document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: May 2026 Fleet Status Report — 1 May 2026

New source URL: Source URL

New document hash: c3fc08fc190a4ca94cc494efe9d0356a5ed616d079890c075a20ede51b34872f

New page/section: Page not identified

New excerpt: Not Disclosed - Out of Service Mar-27 Jul-27 - 135 days - Mobilization & Contract Preparation

Before: No matching interval in the previous accepted report

After: Customer undisclosed / Region not verified · Mar 2027 – Jul 2027

New contract
Firm assignment first disclosed

Deepwater Asgard

Customer undisclosed / Eastern Mediterranean

New firm assignment: Dec 2026 – Dec 2027

Event source: Transocean
Disclosed in report: 1 May 2026
Effective: 1 December 2026

Evidence and before/after facts

Previous source: February 2026 Fleet Status Report — 1 February 2026

Previous source URL: Source URL

Previous document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: May 2026 Fleet Status Report — 1 May 2026

New source URL: Source URL

New document hash: c3fc08fc190a4ca94cc494efe9d0356a5ed616d079890c075a20ede51b34872f

New page/section: Page not identified

New excerpt: Eastern Med Not Disclosed Firm Dec-26 Dec-27 405,000

Before: No matching interval in the previous accepted report

After: Customer undisclosed / Eastern Mediterranean · Dec 2026 – Dec 2027

Material schedule change
Contingent assignment added

Deepwater Atlas

Beacon / U.S. Gulf of Mexico

Contingent assignment: Sept 2026 – Nov 2026

Event source: Transocean
Disclosed in report: 1 May 2026
Effective: 1 September 2026

Evidence and before/after facts

Previous source: February 2026 Fleet Status Report — 1 February 2026

Previous source URL: Source URL

Previous document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

Previous page/section: Page not identified

Previous excerpt: No matching interval appeared in the previous accepted snapshot for this asset; previous report reviewed for continuity

New source: May 2026 Fleet Status Report — 1 May 2026

New source URL: Source URL

New document hash: c3fc08fc190a4ca94cc494efe9d0356a5ed616d079890c075a20ede51b34872f

New page/section: Page not identified

New excerpt: USGOM Beacon Contingent Sep-26 Nov-26 650,000

Before: No matching interval in the previous accepted report

After: Beacon / U.S. Gulf of Mexico · Sept 2026 – Nov 2026

Contract shortened
Firm end revised

Transocean Enabler

Equinor / Norway

Firm end moved: Nov 2026 → Oct 2026

Event source: Transocean
Disclosed in report: 1 May 2026
Effective: 1 May 2026

Evidence and before/after facts

Previous source: February 2026 Fleet Status Report — 1 February 2026

Previous source URL: Source URL

Previous document hash: 235424fa8ce23565f61f12abc4008584a9f065c673ade54449aac1394d9ab162

Previous page/section: Page not identified

Previous excerpt: 1, 2, 3 Norway Equinor Firm May-26 Nov-26 415,000

New source: May 2026 Fleet Status Report — 1 May 2026

New source URL: Source URL

New document hash: c3fc08fc190a4ca94cc494efe9d0356a5ed616d079890c075a20ede51b34872f

New page/section: Page not identified

New excerpt: Norway Equinor Firm May-26 Oct-26 420,000

Before: Equinor / Norway · May 2026 – Nov 2026

After: Equinor / Norway · May 2026 – Oct 2026