Changes intelligence

Materiality, category and time-window view of offshore market moves

Track source-backed public changes by commercial category, materiality, first-disclosed window and effective window without mixing baselines or quarantined candidates into the feed.

284matching changes
8material on this page
3commercial categories shown
all timefirst-disclosed window

284 published historical changes

Default presentation foregrounds commercially meaningful changes while retaining the auditable complete event history. Filter by materiality, commercial category, time window, owner, source, customer, region, asset type, effective date and disclosure date.

Showing 151175 of 284
Contract shortened
Firm end revised

VALARIS DS-15

TotalEnergies / Brazil

Firm end moved: Sept 2025 → Aug 2025

Event source: Valaris
Disclosed in report: 30 April 2025
Effective: 1 December 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

Previous page/section: Drillships

Previous excerpt: VALARIS DS-15 | GustoMSC P10000 | TotalEnergies | Brazil | Dec 24 | Sep 25 | $400,000 | Additional rate charged when MPD services provided Additional rate charged when MPD and additional services provided. ...

New source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

New source URL: Source URL

New document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

New page/section: Drillships

New excerpt: VALARIS DS-15 | GustoMSC P10000 | TotalEnergies | Brazil | Dec 24 | Aug 25 | $400,000 | Additional rate charged when MPD and additional services provided

Before: TotalEnergies / Brazil · Dec 2024 – Sept 2025

After: TotalEnergies / Brazil · Dec 2024 – Aug 2025

Contract shortened
Firm end revised

VALARIS Stavanger

TotalEnergies / UK

Firm end moved: Jun 2025 → Sept 2025

Event source: Valaris
Disclosed in report: 30 April 2025
Effective: 1 May 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

Previous page/section: Stacked

Previous excerpt: VALARIS Stavanger | KFELS N Class | TotalEnergies | UK | May 24 | Jun 25 | TCV of approx. $52 million, including minor rig modifications, based on initial estimated duration of 360 days TCV of over $75 million based on 600-day priced extension. Two 200-day priced options

New source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

New source URL: Source URL

New document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

New page/section: Harsh Environment Jackups

New excerpt: VALARIS Stavanger | KFELS N Class | TotalEnergies | UK | May 24 | Sep 25 | TCV of approx. $52 million, including minor rig modifications, based on initial estimated duration of 360 days TCV of over $75 million based on 600-day priced extension. Two 200-day priced options

Before: TotalEnergies / UK · May 2024 – Jun 2025

After: TotalEnergies / UK · May 2024 – Sept 2025

Contract shortened
Firm end revised

VALARIS 118

BP / Trinidad

Firm end moved: Apr 2025 → Jun 2025

Event source: Valaris
Disclosed in report: 30 April 2025
Effective: 1 April 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

Previous page/section: Stacked

Previous excerpt: VALARIS 118 | LT 240-C | BP | Trinidad | Apr 24 | Apr 25 | TCV of approx. $51 million based on estimated duration of 365 days TCV of approx. $168 million based on duration of three years

New source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

New source URL: Source URL

New document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

New page/section: Benign Environment Jackups

New excerpt: VALARIS 118 | LT 240-C | BP | Trinidad | Apr 24 | Jun 25 | TCV of approx. $51 million based on initial estimated duration of 365 days TCV of approx. $168 million based on duration of three years. Expect approx. 30 days out of service for planned maintenance in 3Q26

Before: BP / Trinidad · Apr 2024 – Apr 2025

After: BP / Trinidad · Apr 2024 – Jun 2025

New contract
Firm assignment first disclosed

VALARIS 108

ARO Drilling / Saudi Arabia

New firm assignment: Mar 2024 – Mar 2027

Event source: Valaris
Disclosed in report: 30 April 2025
Effective: 1 March 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

New source URL: Source URL

New document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

New page/section: Legacy Jackups

New excerpt: VALARIS 108 | KFELS MOD V-B | ARO Drilling | Saudi Arabia | Mar 24 | Mar 27

Before: No matching interval in the previous accepted report

After: ARO Drilling / Saudi Arabia · Mar 2024 – Mar 2027

Contract shortened
Firm end revised

VALARIS MS-1

Santos / Australia

Firm end moved: Jun 2025 → Aug 2025

Event source: Valaris
Disclosed in report: 30 April 2025
Effective: 1 January 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

Previous page/section: Semisubmersibles

Previous excerpt: VALARIS MS-1 | F&G ExD Millennium, Moored | Santos | Australia | Jan 24 | Jun 25

New source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

New source URL: Source URL

New document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

New page/section: Semisubmersibles

New excerpt: VALARIS MS-1 | F&G ExD Millennium, Moored | Santos | Australia | Jan 24 | Aug 25

Before: Santos / Australia · Jan 2024 – Jun 2025

After: Santos / Australia · Jan 2024 – Aug 2025

Contract shortened
Firm end revised

VALARIS 106

BP / Indonesia

Firm end moved: Jan 2025 → Mar 2025

Event source: Valaris
Disclosed in report: 30 April 2025
Effective: 1 January 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

Previous page/section: Stacked

Previous excerpt: VALARIS 106 | KFELS MOD V-B | BP | Indonesia | Jan 24 | Jan 25 | $85,000 | Expect approx. 90 days out of service for planned maintenance across 1Q25 and 2Q25 Priced options for work into 1Q26

New source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

New source URL: Source URL

New document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

New page/section: Benign Environment Jackups

New excerpt: VALARIS 106 | KFELS MOD V-B | BP | Indonesia | Jan 24 | Mar 25 | $85,000 | Expect approx. 90 days out of service for planned maintenance across 1Q25 and 2Q25 Priced options for work into 1Q26

Before: BP / Indonesia · Jan 2024 – Jan 2025

After: BP / Indonesia · Jan 2024 – Mar 2025

Contract shortened
Firm end revised

VALARIS 72

Eni / UK

Firm end moved: Apr 2025 → May 2025

Event source: Valaris
Disclosed in report: 30 April 2025
Effective: 1 January 2020

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

Previous page/section: Stacked

Previous excerpt: VALARIS 72 | Hitachi 300C | Eni | UK | Jan 20 | Apr 25

New source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

New source URL: Source URL

New document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

New page/section: Legacy Jackups

New excerpt: VALARIS 72 | Hitachi 300C | Eni | UK | Jan 20 | May 25

Before: Eni / UK · Jan 2020 – Apr 2025

After: Eni / UK · Jan 2020 – May 2025

Option added
Option period added

VALARIS 249

Shell / Trinidad

Priced option: Jun 2027 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 30 June 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS 249 | LT Super Gorilla | Shell | Trinidad | Jun 27 | Expect approx. 15 days out of service for maintenance in 1Q25 TCV of $16.8 million based on duration of 100 days TCV of approx. $66 million based on estimated duration of 365 days. Three priced options with an estimated duration of 50 days each

Before: No matching interval in the previous accepted report

After: Shell / Trinidad · Jun 2027 – Schedule not disclosed

Option added
Option period added

VALARIS Stavanger

TotalEnergies / UK

Priced option: Mar 2027 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 31 March 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS Stavanger | KFELS N Class | TotalEnergies | UK | Mar 27 | TCV of approx. $52 million, including minor rig modifications, based on initial estimated duration of 360 days TCV of over $75 million based on 600-day priced extension. Two 200-day priced options

Before: No matching interval in the previous accepted report

After: TotalEnergies / UK · Mar 2027 – Schedule not disclosed

Option added
Option period added

VALARIS DS-16

Occidental / U.S. Gulf

Priced option: Jun 2026 – Jun 2027

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 30 June 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Drillships

New excerpt: VALARIS DS-16 | GustoMSC P10000 | Occidental | U.S. Gulf | Jun 26 | 12 months | Additional rate charged when MPD services provided. 1-year priced option

Before: No matching interval in the previous accepted report

After: Occidental / U.S. Gulf · Jun 2026 – Jun 2027

New contract
Contract award announced

VALARIS 249

Shell / Trinidad

New firm assignment: Jun 2026 – Jun 2027

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 1 June 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS 249 | LT Super Gorilla | Shell | Trinidad | Jun 26 | Jun 27 | $125,000 $163,000 | Expect approx. 15 days out of service for maintenance in 1Q25 TCV of $16.8 million based on duration of 100 days TCV of approx. $66 million based on estimated duration of 365 days. Three priced options with an estimated duration of 50 days each

Before: No matching interval in the previous accepted report

After: Shell / Trinidad · Jun 2026 – Jun 2027

Option added
Option period added

VALARIS 121

Shell / UK

Priced option: Feb 2026 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 28 February 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS 121 | KFELS Super A | Shell | UK | Feb 26 | TCV of over $25 million based on initial estimated duration of 210 days TCV of approx. $55 million based on estimated duration of 406 days. Expect approx. 30 days out of service for planned maintenance in 1Q26 . Plus two 1-well priced options with an estimated duration of 120 days each

Before: No matching interval in the previous accepted report

After: Shell / UK · Feb 2026 – Schedule not disclosed

Option added
Option period added

VALARIS DS-9

ExxonMobil / Cyprus

Priced option: Jan 2026 – Jul 2026

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 31 January 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Drillships

New excerpt: VALARIS DS-9 | Samsung GF12000 | ExxonMobil | Cyprus | Jan 26 | 6 months | Contract includes MPD services. One 6-month priced option remaining

Before: No matching interval in the previous accepted report

After: ExxonMobil / Cyprus · Jan 2026 – Jul 2026

New contract
Contract award announced

VALARIS 249

BP / Trinidad

New firm assignment: Jan 2026 – May 2026

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 1 January 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS 249 | LT Super Gorilla | BP | Trinidad | Jan 26 | May 26 | $125,000 $163,000 | Expect approx. 15 days out of service for maintenance in 1Q25 TCV of $16.8 million based on duration of 100 days TCV of approx. $66 million based on estimated duration of 365 days. Three priced options with an estimated duration of 50 days each

Before: No matching interval in the previous accepted report

After: BP / Trinidad · Jan 2026 – May 2026

New contract
Firm assignment first disclosed

VALARIS 76

Saudi Aramco / Saudi Arabia

New firm assignment: Nov 2025 – Nov 2030

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 1 November 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS 76 | LT Super 116-C | Saudi Aramco | Saudi Arabia | Nov 25 | Nov 30 | Leased to ARO Drilling (4)

Before: No matching interval in the previous accepted report

After: Saudi Aramco / Saudi Arabia · Nov 2025 – Nov 2030

New contract
Firm assignment first disclosed

VALARIS DS-17

Equinor / Brazil

New firm assignment: Sept 2025 – Dec 2027

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 1 September 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Drillships

New excerpt: VALARIS DS-17 | GustoMSC P10000 | Equinor | Brazil | Sep 25 | Dec 27 | $447,000 $497,000 | Contract includes MPD and additional services Expect approx. 25 days out of service for customer required upgrades in 3Q25 Estimated total contract value ("TCV") of $498 million, inclusive of MPD, additional services and fees for mobilization and minor rig upgrades. Based on estimated duration of 852 days comprised of a 180-day standby period followed by a 672-day drilling program

Before: No matching interval in the previous accepted report

After: Equinor / Brazil · Sept 2025 – Dec 2027

Option added
Option period added

VALARIS 106

BP / Indonesia

Priced option: Aug 2025 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 31 August 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS 106 | KFELS MOD V-B | BP | Indonesia | Aug 25 | Expect approx. 90 days out of service for planned maintenance across 1Q25 and 2Q25 Priced options for work into 1Q26

Before: No matching interval in the previous accepted report

After: BP / Indonesia · Aug 2025 – Schedule not disclosed

New contract
Contract award announced

VALARIS Stavanger

TotalEnergies / UK

New firm assignment: Jul 2025 – Mar 2027

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 1 July 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS Stavanger | KFELS N Class | TotalEnergies | UK | Jul 25 | Mar 27 | TCV of approx. $52 million, including minor rig modifications, based on initial estimated duration of 360 days TCV of over $75 million based on 600-day priced extension. Two 200-day priced options

Before: No matching interval in the previous accepted report

After: TotalEnergies / UK · Jul 2025 – Mar 2027

New contract
Firm assignment first disclosed

VALARIS 92

Shell / UK

New firm assignment: Jun 2025 – Jun 2027

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 1 June 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS 92 | LT 116-C | Shell | UK | Jun 25 | Jun 27 | $95,000 | TCV of approx. $75 million based on duration of two years

Before: No matching interval in the previous accepted report

After: Shell / UK · Jun 2025 – Jun 2027

New contract
Firm assignment first disclosed

VALARIS 248

Hibiscus / UK

New firm assignment: Jun 2025 – Sept 2025

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 1 June 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS 248 | LT Super Gorilla | Hibiscus | UK | Jun 25 | Sep 25 | Expect approx. 50 days out of service for planned maintenance in 2Q25 TCV of $14.2 million based on estimated duration of 93 days

Before: No matching interval in the previous accepted report

After: Hibiscus / UK · Jun 2025 – Sept 2025

New contract
Firm assignment first disclosed

VALARIS 144

Customer undisclosed / Angola

New firm assignment: May 2025 – Jun 2027

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 1 May 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS 144 | LT Super 116-E | Undisclosed | Angola | May 25 | Jun 27 | Out of service for contract preparations and mobilization in 4Q24 and 1Q25. TCV of approx. $8.5 million based on estimated duration of 45 days TCV estimated to be between $149 million and $156 million, including a mobilization fee from the U.S. Gulf.

Before: No matching interval in the previous accepted report

After: Customer undisclosed / Angola · May 2025 – Jun 2027

New contract
Firm assignment first disclosed

VALARIS DS-17

Equinor / Brazil

New firm assignment: May 2025 – Aug 2025

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 1 May 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Drillships

New excerpt: VALARIS DS-17 | GustoMSC P10000 | Equinor | Brazil | May 25 | Aug 25 | $447,000 $497,000 | Contract includes MPD and additional services Expect approx. 25 days out of service for customer required upgrades in 3Q25 Estimated total contract value ("TCV") of $498 million, inclusive of MPD, additional services and fees for mobilization and minor rig upgrades. Based on estimated duration of 852 days comprised of a 180-day standby period followed by a 672-day drilling program

Before: No matching interval in the previous accepted report

After: Equinor / Brazil · May 2025 – Aug 2025

Contract shortened
Firm end revised

VALARIS 106

BP / Indonesia

Firm end moved: May 2025 → Aug 2025

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 1 April 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Stacked

Previous excerpt: VALARIS 106 | KFELS MOD V-B | BP | Indonesia | Apr 25 | May 25 | $95,000 | Expect approx. 90 days out of service for planned maintenance in 1Q25. Priced options for work into 1Q26

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS 106 | KFELS MOD V-B | BP | Indonesia | Apr 25 | Aug 25 | $95,000 | Expect approx. 90 days out of service for planned maintenance across 1Q25 and 2Q25 Priced options for work into 1Q26

Before: BP / Indonesia · Apr 2025 – May 2025

After: BP / Indonesia · Apr 2025 – Aug 2025

New contract
Firm assignment first disclosed

VALARIS Norway

Ithaca Energy / UK

New firm assignment: Apr 2025 – Jan 2026

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 1 April 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS Norway | KFELS N Class | Ithaca Energy | UK | Apr 25 | Jan 26 | VALARIS Norway substitutes for VALARIS 72 until the rig completes its current contract TCV of approx. $39 million based on estimated duration of 292 days. Expect up to 30 days out of service for mobilization / planned maintenance in 2Q25

Before: No matching interval in the previous accepted report

After: Ithaca Energy / UK · Apr 2025 – Jan 2026

New contract
Firm assignment first disclosed

VALARIS 72

Eni / UK

New firm assignment: Apr 2025 – Nov 2027

Event source: Valaris
Disclosed in report: 18 February 2025
Effective: 1 April 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2024-10-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 62d1d436cebb00bc8469405917df971c39c6741738597f2edfcefebfd2eabbda

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-02-18 — Schedule not disclosed

New source URL: Source URL

New document hash: e8e982876ce81a37349e6e839ce5c628afc7d0a9aa55db3a752ceb7451b390de

New page/section: Stacked

New excerpt: VALARIS 72 | Hitachi 300C | Eni | UK | Apr 25 | Nov 27

Before: No matching interval in the previous accepted report

After: Eni / UK · Apr 2025 – Nov 2027