Changes intelligence

Materiality, category and time-window view of offshore market moves

Track source-backed public changes by commercial category, materiality, first-disclosed window and effective window without mixing baselines or quarantined candidates into the feed.

284matching changes
5material on this page
3commercial categories shown
all timefirst-disclosed window

284 published historical changes

Default presentation foregrounds commercially meaningful changes while retaining the auditable complete event history. Filter by materiality, commercial category, time window, owner, source, customer, region, asset type, effective date and disclosure date.

Showing 101125 of 284
Option added
Option period added

VALARIS 122

Shell / UK

Priced option: Dec 2025 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 31 December 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 122 | KFELS Super A | Shell | UK | Dec 25 | TCV of over $60 million based on initial estimated duration of 500 days Contracted revenue backlog for the 31-day extension is over $3.5 million.The extension is for accommodation support. Two 28-day priced options

Before: No matching interval in the previous accepted report

After: Shell / UK · Dec 2025 – Schedule not disclosed

New contract
Contract award announced

VALARIS 122

Shell / UK

New firm assignment: Dec 2025 – Dec 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 December 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 122 | KFELS Super A | Shell | UK | Dec 25 | Dec 25 | TCV of over $60 million based on initial estimated duration of 500 days Contracted revenue backlog for the 31-day extension is over $3.5 million.The extension is for accommodation support. Two 28-day priced options

Before: No matching interval in the previous accepted report

After: Shell / UK · Dec 2025 – Dec 2025

New contract
Firm assignment first disclosed

VALARIS DS-17

Equinor / Brazil

New firm assignment: Nov 2025 – Jan 2028

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 November 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Drillships

New excerpt: VALARIS DS-17 | GustoMSC P10000 | Equinor | Brazil | Nov 25 | Jan 28 | $447,000 $497,000 | Contract includes MPD and additional services Expect approx. 25 days out of service for customer required upgrades in 1Q26 Estimated total contract value ("TCV") of $498 million, inclusive of MPD, additional services and fees for mobilization and minor rig upgrades. Based on initial estimated duration of 852 days comprised of a 180-day standby period followed by a 672-day drilling program

Before: No matching interval in the previous accepted report

After: Equinor / Brazil · Nov 2025 – Jan 2028

New contract
Contract award announced

VALARIS 110

Customer undisclosed / Qatar

New firm assignment: Oct 2025 – Oct 2029

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 October 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Benign Environment Jackups

New excerpt: VALARIS 110 | KFELS MOD V-B | Undisclosed | Qatar | Oct 25 | Oct 29 | 1-year priced option Contracted revenue backlog for the four-year extension is approx. $117 million. 1-year priced option. Expect approx. 45 days of out service for planned maintenance in 2Q26

Before: No matching interval in the previous accepted report

After: Customer undisclosed / Qatar · Oct 2025 – Oct 2029

New contract
Firm assignment first disclosed

VALARIS Stavanger

TotalEnergies / UK

New firm assignment: Oct 2025 – May 2027

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 October 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Harsh Environment Jackups

New excerpt: VALARIS Stavanger | KFELS N Class | TotalEnergies | UK | Oct 25 | May 27 | TCV of approx. $52 million, including minor rig modifications, based on initial estimated duration of 360 days TCV of over $75 million based on 600-day priced extension. Two 200-day priced options

Before: No matching interval in the previous accepted report

After: TotalEnergies / UK · Oct 2025 – May 2027

New contract
Firm assignment first disclosed

VALARIS 72

Eni / UK

New firm assignment: Sept 2025 – Sept 2027

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 September 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Legacy Jackups

New excerpt: VALARIS 72 | Hitachi 300C | Eni | UK | Sep 25 | Sep 27 | TCV of approx. $71 million for 730-day contract to perform P&A and CCS work

Before: No matching interval in the previous accepted report

After: Eni / UK · Sept 2025 – Sept 2027

New contract
Firm assignment first disclosed

VALARIS 118

BP / Trinidad

New firm assignment: Sept 2025 – Aug 2028

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 September 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Benign Environment Jackups

New excerpt: VALARIS 118 | LT 240-C | BP | Trinidad | Sep 25 | Aug 28 | TCV of approx. $51 million based on initial estimated duration of 365 days TCV of approx. $168 million based on duration of three years. Expect approx. 30 days out of service for planned maintenance in 3Q26

Before: No matching interval in the previous accepted report

After: BP / Trinidad · Sept 2025 – Aug 2028

New contract
Firm assignment first disclosed

VALARIS 92

Shell / UK

New firm assignment: Aug 2025 – Aug 2027

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 August 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Legacy Jackups

New excerpt: VALARIS 92 | LT 116-C | Shell | UK | Aug 25 | Aug 27 | $95,000 | TCV of approx. $75 million based on duration of 730 days

Before: No matching interval in the previous accepted report

After: Shell / UK · Aug 2025 – Aug 2027

New contract
Firm assignment first disclosed

VALARIS 144

Azule Energy / Angola

New firm assignment: Aug 2025 – Sept 2027

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 August 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Benign Environment Jackups

New excerpt: VALARIS 144 | LT Super 116-E | Azule Energy | Angola | Aug 25 | Sep 27 | TCV of approx. $8.5 million based on estimated duration of 45 days TCV estimated to be between $149 million and $156 million based on contract duration of 730 to 770 days, including a mobilization fee from the Gulf of America

Before: No matching interval in the previous accepted report

After: Azule Energy / Angola · Aug 2025 – Sept 2027

Contract shortened
Firm end revised

VALARIS 106

BP / Indonesia

Firm end moved: Nov 2025 → Oct 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 June 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Benign Environment Jackups

Previous excerpt: VALARIS 106 | KFELS MOD V-B | BP | Indonesia | Jun 25 | Nov 25 | $95,000 | Expect approx. 90 days out of service for planned maintenance across 1Q25 and 2Q25 Priced options for work into 1Q26

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Benign Environment Jackups

New excerpt: VALARIS 106 | KFELS MOD V-B | BP | Indonesia | Jun 25 | Oct 25 | $95,000 | $95,000

Before: BP / Indonesia · Jun 2025 – Nov 2025

After: BP / Indonesia · Jun 2025 – Oct 2025

New contract
Firm assignment first disclosed

VALARIS 146

ARO Drilling / Saudi Arabia

New firm assignment: May 2025 – Apr 2030

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 May 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Legacy Jackups

New excerpt: VALARIS 146 | LT Super 116-E | ARO Drilling | Saudi Arabia | May 25 | Apr 30 | Expect approx. 50 days out of service for planned maintenance in 1Q26

Before: No matching interval in the previous accepted report

After: ARO Drilling / Saudi Arabia · May 2025 – Apr 2030

New contract
Firm assignment first disclosed

VALARIS 140

ARO Drilling / Saudi Arabia

New firm assignment: May 2025 – Apr 2030

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 May 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Legacy Jackups

New excerpt: VALARIS 140 | LT Super 116-E | ARO Drilling | Saudi Arabia | May 25 | Apr 30

Before: No matching interval in the previous accepted report

After: ARO Drilling / Saudi Arabia · May 2025 – Apr 2030

New contract
Firm assignment first disclosed

VALARIS 116

ARO Drilling / Saudi Arabia

New firm assignment: May 2025 – Apr 2030

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 May 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Legacy Jackups

New excerpt: VALARIS 116 | LT 240-C | ARO Drilling | Saudi Arabia | May 25 | Apr 30 | Expect approx. 180 days out of service for planned maintenance across 4Q25 and 1Q26

Before: No matching interval in the previous accepted report

After: ARO Drilling / Saudi Arabia · May 2025 – Apr 2030

New contract
Firm assignment first disclosed

VALARIS 250

ARO Drilling / Saudi Arabia

New firm assignment: May 2025 – Apr 2030

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 May 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Legacy Jackups

New excerpt: VALARIS 250 | LT Super Gorilla XL | ARO Drilling | Saudi Arabia | May 25 | Apr 30 | Expect approx. 180 days out of service for planned maintenance across 4Q25 and 1Q26

Before: No matching interval in the previous accepted report

After: ARO Drilling / Saudi Arabia · May 2025 – Apr 2030

Contract shortened
Firm end revised

VALARIS DS-17

Equinor / Brazil

Firm end moved: Oct 2025 → Nov 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 May 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Drillships

Previous excerpt: VALARIS DS-17 | GustoMSC P10000 | Equinor | Brazil | May 25 | Oct 25 | $447,000 $497,000 | Contract includes MPD and additional services Expect approx. 25 days out of service for customer required upgrades in 4Q25 Estimated total contract value ("TCV") of $498 million, inclusive of MPD, additional services and fees for mobilization and minor rig upgrades. Based on estimated duration of 852 days comprised of a 180-day standby period followed by a 672-day drilling program

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Drillships

New excerpt: VALARIS DS-17 | GustoMSC P10000 | Equinor | Brazil | May 25 | Nov 25 | $447,000 $497,000 | Contract includes MPD and additional services Expect approx. 25 days out of service for customer required upgrades in 1Q26 Estimated total contract value ("TCV") of $498 million, inclusive of MPD, additional services and fees for mobilization and minor rig upgrades. Based on initial estimated duration of 852 days comprised of a 180-day standby period followed by a 672-day drilling program

Before: Equinor / Brazil · May 2025 – Oct 2025

After: Equinor / Brazil · May 2025 – Nov 2025

Contract shortened
Firm end revised

VALARIS 123

TAQA / Netherlands

Firm end moved: Sept 2025 → Oct 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 March 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Harsh Environment Jackups

Previous excerpt: VALARIS 123 | KFELS Super A | TAQA | Netherlands | Mar 25 | Sep 25 | $153,000 | TCV of approx. $21 million based on initial estimated duration of 154 days

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 123 | KFELS Super A | TAQA | Netherlands | Mar 25 | Oct 25 | $153,000 | $153,000

Before: TAQA / Netherlands · Mar 2025 – Sept 2025

After: TAQA / Netherlands · Mar 2025 – Oct 2025

New contract
Firm assignment first disclosed

VALARIS 144

Azule Energy / Angola

New firm assignment: Mar 2025 – Jul 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 March 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Benign Environment Jackups

New excerpt: VALARIS 144 | LT Super 116-E | Azule Energy | Angola | Mar 25 | Jul 25 | TCV of approx. $8.5 million based on estimated duration of 45 days TCV estimated to be between $149 million and $156 million based on contract duration of 730 to 770 days, including a mobilization fee from the Gulf of America

Before: No matching interval in the previous accepted report

After: Azule Energy / Angola · Mar 2025 – Jul 2025

New contract
Contract award announced

VALARIS DS-16

Occidental / U.S. Gulf of Mexico

New firm assignment: Jun 2024 – Jun 2026

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 June 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Drillships

New excerpt: VALARIS DS-16 | GustoMSC P10000 | Occidental | Gulf of America | Jun 24 | Jun 26 | Additional rate charged when MPD services provided 940-day contract extension for DS-16 and 914-day contract for DS-18. Combined addition to contracted revenue backlog is approx. $760 million. Expect approx. 20 days out of service for planned maintenance in 3Q26

Before: No matching interval in the previous accepted report

After: Occidental / U.S. Gulf of Mexico · Jun 2024 – Jun 2026

New contract
Firm assignment first disclosed

VALARIS DS-7

Azule Energy / Angola

New firm assignment: Jun 2024 – Oct 2026

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 June 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Drillships

New excerpt: VALARIS DS-7 | Samsung 96K | Azule Energy | Angola | Jun 24 | Oct 26 | TCV estimated to be $364 million based on initial estimated duration of 850 days

Before: No matching interval in the previous accepted report

After: Azule Energy / Angola · Jun 2024 – Oct 2026

Contract shortened
Firm end revised

VALARIS 118

BP / Trinidad

Firm end moved: Jun 2025 → Sept 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 April 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Benign Environment Jackups

Previous excerpt: VALARIS 118 | LT 240-C | BP | Trinidad | Apr 24 | Jun 25 | TCV of approx. $51 million based on initial estimated duration of 365 days TCV of approx. $168 million based on duration of three years. Expect approx. 30 days out of service for planned maintenance in 3Q26

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Benign Environment Jackups

New excerpt: VALARIS 118 | LT 240-C | BP | Trinidad | Apr 24 | Sep 25 | TCV of approx. $51 million based on initial estimated duration of 365 days TCV of approx. $168 million based on duration of three years. Expect approx. 30 days out of service for planned maintenance in 3Q26

Before: BP / Trinidad · Apr 2024 – Jun 2025

After: BP / Trinidad · Apr 2024 – Sept 2025

Contract shortened
Firm end revised

VALARIS 92

Harbour Energy / UK

Firm end moved: Jun 2025 → Jul 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 March 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Legacy Jackups

Previous excerpt: VALARIS 92 | LT 116-C | Harbour Energy | UK | Mar 24 | Jun 25 | $95,000 | TCV of approx. $75 million based on duration of two years

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Legacy Jackups

New excerpt: VALARIS 92 | LT 116-C | Harbour Energy | UK | Mar 24 | Jul 25 | $95,000 | TCV of approx. $75 million based on duration of 730 days

Before: Harbour Energy / UK · Mar 2024 – Jun 2025

After: Harbour Energy / UK · Mar 2024 – Jul 2025

Contract shortened
Firm end revised

VALARIS MS-1

Santos / Australia

Firm end moved: Aug 2025 → Sept 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 January 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Semisubmersibles

Previous excerpt: VALARIS MS-1 | F&G ExD Millennium, Moored | Santos | Australia | Jan 24 | Aug 25

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Semisubmersibles

New excerpt: VALARIS MS-1 | F&G ExD Millennium, Moored | Santos | Australia | Jan 24 | Sep 25

Before: Santos / Australia · Jan 2024 – Aug 2025

After: Santos / Australia · Jan 2024 – Sept 2025

Contract shortened
Firm end revised

VALARIS DPS-1

Woodside / Australia

Firm end moved: Sept 2025 → Oct 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 January 2024

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Semisubmersibles

Previous excerpt: VALARIS DPS-1 | F&G ExD Millennium, Moored | Woodside | Australia | Jan 24 | Sep 25

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Semisubmersibles

New excerpt: VALARIS DPS-1 | F&G ExD Millennium, DP | Woodside | Australia | Jan 24 | Oct 25

Before: Woodside / Australia · Jan 2024 – Sept 2025

After: Woodside / Australia · Jan 2024 – Oct 2025

Contract shortened
Firm end revised

VALARIS 122

Shell / UK

Firm end moved: Sept 2025 → Nov 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 September 2023

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Harsh Environment Jackups

Previous excerpt: VALARIS 122 | KFELS Super A | Shell | UK | Sep 23 | Sep 25 | TCV of over $60 million based on initial estimated duration of 500 days

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 122 | KFELS Super A | Shell | UK | Sep 23 | Nov 25 | TCV of over $60 million based on initial estimated duration of 500 days Contracted revenue backlog for the 31-day extension is over $3.5 million.The extension is for accommodation support. Two 28-day priced options

Before: Shell / UK · Sept 2023 – Sept 2025

After: Shell / UK · Sept 2023 – Nov 2025

New contract
Contract award announced

VALARIS DS-18

Chevron / U.S. Gulf of Mexico

New firm assignment: Aug 2022 – Aug 2025

Event source: Valaris
Disclosed in report: 24 July 2025
Effective: 1 August 2022

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-04-30 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 16c98797852e546beb667ff74ce47db6a6b2ed79a7487eec3d58aedf0ba62b34

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2025-07-24 — Schedule not disclosed

New source URL: Source URL

New document hash: 6cd733b6f2fec4a2b3d984ba53226875869fb0d0b5720be364fd2278d7397471

New page/section: Drillships

New excerpt: VALARIS DS-18 | GustoMSC P10000 | Chevron | Gulf of America | Aug 22 | Aug 25 | Additional rate charged when MPD services provided. Expect approx. 20 days out of service for planned maintenance in 3Q25 914-day contract for DS-18 and 940-day contract extension for DS-16. Combined addition to contracted revenue backlog is approx. $760 million

Before: No matching interval in the previous accepted report

After: Chevron / U.S. Gulf of Mexico · Aug 2022 – Aug 2025