Changes intelligence

Materiality, category and time-window view of offshore market moves

Track source-backed public changes by commercial category, materiality, first-disclosed window and effective window without mixing baselines or quarantined candidates into the feed.

284matching changes
9material on this page
3commercial categories shown
all timefirst-disclosed window

284 published historical changes

Default presentation foregrounds commercially meaningful changes while retaining the auditable complete event history. Filter by materiality, commercial category, time window, owner, source, customer, region, asset type, effective date and disclosure date.

Showing 125 of 284
New contract
Contract award announced

VALARIS DS-4

Petrobras / Brazil

New firm assignment: Nov 2027 – Oct 2030

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 November 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Drillships

New excerpt: VALARIS DS-4 | Samsung 96K | Petrobras | Brazil | Nov 27 | Oct 30 | Previous day rate of $450,000 has been adjusted, reducing contract backlog from Apr 2026 to Nov 2027 by approx. $21 million. Plus mobilization fee of approx. $41 million. Contract includes MPD and additional services. Contracted revenue backlog of approx. $447 million for 1,064-day extension

Before: No matching interval in the previous accepted report

After: Petrobras / Brazil · Nov 2027 – Oct 2030

New contract
Contract award announced

VALARIS 115

Shell / Brunei

New firm assignment: Apr 2027 – Apr 2029

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 April 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Benign Environment Jackups

New excerpt: VALARIS 115 | BM Pacific Class 400 | Shell | Brunei | Apr 27 | Apr 29 | TCV of approx. $159 million based on duration of four years Contracted revenue backlog of approx. $78 million for two-year extension

Before: No matching interval in the previous accepted report

After: Shell / Brunei · Apr 2027 – Apr 2029

New contract
Firm assignment first disclosed

VALARIS 107

GB Energy / Australia

New firm assignment: Nov 2026 – Mar 2027

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 November 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Benign Environment Jackups

New excerpt: VALARIS 107 | KFELS MOD V-B | GB Energy | Australia | Nov 26 | Mar 27 | $163,000 | TCV of approx. $27 million based on estimated duration of 150 days

Before: No matching interval in the previous accepted report

After: GB Energy / Australia · Nov 2026 – Mar 2027

Option added
Option period added

VALARIS 121

Adura / UK

Priced option: Oct 2026 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 31 October 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 121 | KFELS Super A | Adura | UK | Oct 26 | TCV of approx. $55 million based on estimated duration of 406 days Contracted revenue backlog of over $25 million based on estimated duration of 194 days. Option with an estimated duration of 150 to 200 days

Before: No matching interval in the previous accepted report

After: Adura / UK · Oct 2026 – Schedule not disclosed

New contract
Contract award announced

VALARIS 122

INEOS / UK

New firm assignment: Sept 2026 – Feb 2027

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 September 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 122 | KFELS Super A | INEOS | UK | Sep 26 | Feb 27 | $115,000 | Contracted revenue backlog of approx. $28 million for extensions totaling 243 days . The extensions are for accommodation support Options with an estimated total duration of 825 days for work in the UK and Danish North Sea

Before: No matching interval in the previous accepted report

After: INEOS / UK · Sept 2026 – Feb 2027

New contract
Contract award announced

VALARIS 248

Eni / UK

New firm assignment: Aug 2026 – Jan 2028

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 August 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 248 | LT Super Gorilla | Eni | UK | Aug 26 | Jan 28 | Contracted revenue backlog of approx. $16 million for 224-day contract to provide accommodation support services. Expect approx 15 days out of service for planned maintenance in 2Q26 TCV of approx. $84 million for 730-day contract to perform P&A and CCS work. Two 3-month options. VALARIS 120 will substitute for VALARIS 248 while the rig completes another customer's program and a special periodic survey

Before: No matching interval in the previous accepted report

After: Eni / UK · Aug 2026 – Jan 2028

New contract
Firm assignment first disclosed

VALARIS DS-12

BP / Egypt

New firm assignment: Apr 2026 – Apr 2027

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 April 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Drillships

New excerpt: VALARIS DS-12 | DSME 12000 | BP | Egypt | Apr 26 | Apr 27 | TCV, based on estimated duration of 350 days, is approx. $140 million, inclusive of MPD and mobilization. Three option wells

Before: No matching interval in the previous accepted report

After: BP / Egypt · Apr 2026 – Apr 2027

New contract
Contract award announced

VALARIS 106

Medco Energi / Indonesia

New firm assignment: Apr 2026 – Jun 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 April 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Benign Environment Jackups

New excerpt: VALARIS 106 | KFELS MOD V-B | Medco Energi | Indonesia | Apr 26 | Jun 26 | $95,000 | TCV of $5.4 million based on minimum duration of 45 days Expect out of service time for leg repairs in 2Q26; duration to be determined upon rig's arrival at shipyard in Singapore TCV of approx. $74 million based on estimated duration of two years. Four 1-well options

Before: No matching interval in the previous accepted report

After: Medco Energi / Indonesia · Apr 2026 – Jun 2026

Contract shortened
Firm end revised

VALARIS 121

Adura / UK

Firm end moved: Sept 2026 → Oct 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 February 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Harsh Environment Jackups

Previous excerpt: VALARIS 121 | KFELS Super A | Adura | UK | Feb 26 | Sep 26 | TCV of approx. $55 million based on estimated duration of 406 days Contracted revenue backlog for 194-day extension is over $25 million. Option with an estimated duration of 150 to 200 days

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 121 | KFELS Super A | Adura | UK | Feb 26 | Oct 26 | TCV of approx. $55 million based on estimated duration of 406 days Contracted revenue backlog of over $25 million based on estimated duration of 194 days. Option with an estimated duration of 150 to 200 days

Before: Adura / UK · Feb 2026 – Sept 2026

After: Adura / UK · Feb 2026 – Oct 2026

Contract shortened
Firm end revised

VALARIS 120

Eni / UK

Firm end moved: Jul 2026 → Aug 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 January 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Harsh Environment Jackups

Previous excerpt: VALARIS 120 | KFELS Super A | Eni | UK | Jan 26 | Jul 26 | $166,000 | Contract suspended effective Dec 2025 VALARIS 120 will substitute for VALARIS 248 from Jan 2026 to Jul 2026 , while VALARIS 248 completes another customer's program and a special periodic survey

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 120 | KFELS Super A | Eni | UK | Jan 26 | Aug 26 | VALARIS 120 will substitute for VALARIS 248 from Jan 2026 to Aug 2026 , while VALARIS 248 completes another customer's program and a special periodic survey

Before: Eni / UK · Jan 2026 – Jul 2026

After: Eni / UK · Jan 2026 – Aug 2026

Contract shortened
Firm end revised

VALARIS 122

Adura / UK

Firm end moved: Apr 2026 → Aug 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 January 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Harsh Environment Jackups

Previous excerpt: VALARIS 122 | KFELS Super A | Adura | UK | Jan 26 | Apr 26 | TCV of over $60 million based on initial estimated duration of 500 days Contracted revenue backlog for the 31-day extension is over $3.5 million. The extension is for accommodation support Contracted revenue backlog for contract extensions totaling 120 days is over $13 million . The extensions are for accommodation support

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 122 | KFELS Super A | Adura | UK | Jan 26 | Aug 26 | $115,000 | Contracted revenue backlog of approx. $28 million for extensions totaling 243 days . The extensions are for accommodation support Options with an estimated total duration of 825 days for work in the UK and Danish North Sea

Before: Adura / UK · Jan 2026 – Apr 2026

After: Adura / UK · Jan 2026 – Aug 2026

Contract shortened
Firm end revised

VALARIS 123

TAQA / Netherlands

Firm end moved: Jan 2026 → Aug 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 January 2026

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Harsh Environment Jackups

Previous excerpt: VALARIS 123 | KFELS Super A | TAQA | Netherlands | Jan 26 | Jan 26 | $163,000 | Accommodation support. Four 1-month priced options

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 123 | KFELS Super A | TAQA | Netherlands | Jan 26 | Aug 26 | $80,000 | Accommodation support

Before: TAQA / Netherlands · Jan 2026 – Jan 2026

After: TAQA / Netherlands · Jan 2026 – Aug 2026

Contract shortened
Firm end revised

VALARIS 248

GE Vernova / UK

Firm end moved: Apr 2026 → Jun 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 November 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Harsh Environment Jackups

Previous excerpt: VALARIS 248 | LT Super Gorilla | GE Vernova | UK | Nov 25 | Apr 26 | Contracted revenue backlog of over $10 million for 150-day contract to provide accommodation support services. Priced options with a total duration of 74 days . Expect approx 15 days out of service for planned maintenance in 2Q26 TCV of approx. $84 million for 730-day contract to perform P&A and CCS work. Two 3-month options. VALARIS 120 will substitute for VALARIS 248 while the rig completes another customer's program and a special periodic survey

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 248 | LT Super Gorilla | GE Vernova | UK | Nov 25 | Jun 26 | Contracted revenue backlog of approx. $16 million for 224-day contract to provide accommodation support services. Expect approx 15 days out of service for planned maintenance in 2Q26 TCV of approx. $84 million for 730-day contract to perform P&A and CCS work. Two 3-month options. VALARIS 120 will substitute for VALARIS 248 while the rig completes another customer's program and a special periodic survey

Before: GE Vernova / UK · Nov 2025 – Apr 2026

After: GE Vernova / UK · Nov 2025 – Jun 2026

Contract shortened
Firm end revised

VALARIS 107

ExxonMobil / Australia

Firm end moved: Sept 2026 → Oct 2026

Event source: Valaris
Disclosed in report: 4 May 2026
Effective: 1 November 2025

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

Previous page/section: Benign Environment Jackups

Previous excerpt: VALARIS 107 | KFELS MOD V-B | ExxonMobil | Australia | Nov 25 | Sep 26 | $153,000 $163,000 | TCV of approx. $27 million based on estimated duration of 150 days

New source: Valaris Fleet Status Report 2026-05-04 — Schedule not disclosed

New source URL: Source URL

New document hash: ca9bd258732c40f0ef032334ceb0f016b457567b58609b0a1747871d9c928ea7

New page/section: Benign Environment Jackups

New excerpt: VALARIS 107 | KFELS MOD V-B | ExxonMobil | Australia | Nov 25 | Oct 26 | $163,000 | TCV of approx. $27 million based on estimated duration of 150 days

Before: ExxonMobil / Australia · Nov 2025 – Sept 2026

After: ExxonMobil / Australia · Nov 2025 – Oct 2026

Option added
Option period added

VALARIS 76

ARO Drilling / Saudi Arabia

Priced option: Dec 2030 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 17 February 2026
Effective: 31 December 2030

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

New source URL: Source URL

New document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

New page/section: Legacy Jackups

New excerpt: VALARIS 76 | LT Super 116-C | ARO Drilling | Saudi Arabia | Dec 30 | Priced options of up to two years

Before: No matching interval in the previous accepted report

After: ARO Drilling / Saudi Arabia · Dec 2030 – Schedule not disclosed

Option added
Option period added

VALARIS 110

NOC / Qatar

Priced option: Oct 2029 – Oct 2030

Event source: Valaris
Disclosed in report: 17 February 2026
Effective: 31 October 2029

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

New source URL: Source URL

New document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

New page/section: Benign Environment Jackups

New excerpt: VALARIS 110 | KFELS MOD V-B | NOC | Qatar | Oct 29 | 12 months | Contracted revenue backlog for the four-year extension is approx. $117 million. 1-year priced option. Expect approx. 60 days of out service for planned maintenance in 2Q26

Before: No matching interval in the previous accepted report

After: NOC / Qatar · Oct 2029 – Oct 2030

Option added
Option period added

VALARIS 118

BP / Trinidad

Priced option: Aug 2028 – Aug 2029

Event source: Valaris
Disclosed in report: 17 February 2026
Effective: 31 August 2028

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

New source URL: Source URL

New document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

New page/section: Benign Environment Jackups

New excerpt: VALARIS 118 | LT 240-C | BP | Trinidad | Aug 28 | 12 months | TCV of approx. $51 million based on initial estimated duration of 365 days TCV of approx. $168 million based on duration of three years. 1-year option

Before: No matching interval in the previous accepted report

After: BP / Trinidad · Aug 2028 – Aug 2029

Option added
Option period added

VALARIS DS-17

Equinor / Brazil

Priced option: Jan 2028 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 17 February 2026
Effective: 31 January 2028

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

New source URL: Source URL

New document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

New page/section: Drillships

New excerpt: VALARIS DS-17 | GustoMSC P10000 | Equinor | Brazil | Jan 28 | Expect approx. 80 days out of service for customer required upgrades in 1Q26 Estimated total contract value ("TCV") of $498 million, inclusive of MPD, additional services and fees for mobilization and minor rig upgrades. Based on initial estimated duration of 852 days comprised of a 180-day standby period and a 672-day drilling program. Two 90-day priced options

Before: No matching interval in the previous accepted report

After: Equinor / Brazil · Jan 2028 – Schedule not disclosed

Option added
Option period added

VALARIS 248

Eni / UK

Priced option: Dec 2027 – Mar 2028

Event source: Valaris
Disclosed in report: 17 February 2026
Effective: 31 December 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

New source URL: Source URL

New document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 248 | LT Super Gorilla | Eni | UK | Dec 27 | 3 months | Contracted revenue backlog of over $10 million for 150-day contract to provide accommodation support services. Priced options with a total duration of 74 days . Expect approx 15 days out of service for planned maintenance in 2Q26 TCV of approx. $84 million for 730-day contract to perform P&A and CCS work. Two 3-month options. VALARIS 120 will substitute for VALARIS 248 while the rig completes another customer's program and a special periodic survey

Before: No matching interval in the previous accepted report

After: Eni / UK · Dec 2027 – Mar 2028

Option added
Option period added

VALARIS 249

Shell / Trinidad

Priced option: Oct 2027 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 17 February 2026
Effective: 31 October 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

New source URL: Source URL

New document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

New page/section: Harsh Environment Jackups

New excerpt: VALARIS 249 | LT Super Gorilla | Shell | Trinidad | Oct 27 | TCV of $16.8 million based on duration of 100 days. Expect approx. 60 days out of service for planned maintenance in 3Q/4Q26 Contracted revenue backlog of approx. $66 million based on estimated duration of 365 days. Three priced options with an estimated duration of 50 days each

Before: No matching interval in the previous accepted report

After: Shell / Trinidad · Oct 2027 – Schedule not disclosed

Option added
Option period added

VALARIS 144

Azule Energy / Angola

Priced option: Oct 2027 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 17 February 2026
Effective: 31 October 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

New source URL: Source URL

New document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

New page/section: Benign Environment Jackups

New excerpt: VALARIS 144 | LT Super 116-E | Azule Energy | Angola | Oct 27 | TCV estimated to be between $149 million and $156 million based on contract duration of 730 to 770 days, including a mobilization fee from the Gulf of America. Three-well option

Before: No matching interval in the previous accepted report

After: Azule Energy / Angola · Oct 2027 – Schedule not disclosed

Option added
Option period added

VALARIS DS-7

Azule Energy / Angola

Priced option: Sept 2027 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 17 February 2026
Effective: 30 September 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

New source URL: Source URL

New document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

New page/section: Drillships

New excerpt: VALARIS DS-7 | Samsung 96K | Azule Energy | Angola | Sep 27 | TCV estimated to be $364 million based on initial estimated duration of 850 days Contract backlog of approx. $125 million based on estimated duration of 325 days. Five-well unpriced option with an estimated duration of 300 to 350 days

Before: No matching interval in the previous accepted report

After: Azule Energy / Angola · Sept 2027 – Schedule not disclosed

Option added
Option period added

VALARIS Stavanger

TotalEnergies / UK

Priced option: Aug 2027 – Schedule not disclosed

Event source: Valaris
Disclosed in report: 17 February 2026
Effective: 31 August 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

New source URL: Source URL

New document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

New page/section: Harsh Environment Jackups

New excerpt: VALARIS Stavanger | KFELS N Class | TotalEnergies | UK | Aug 27 | TCV of approx. $52 million, including minor rig modifications, based on initial estimated duration of 360 days TCV of over $75 million based on 600-day priced extension. Two 200-day priced options

Before: No matching interval in the previous accepted report

After: TotalEnergies / UK · Aug 2027 – Schedule not disclosed

Option added
Option period added

VALARIS 108

ARO Drilling / Saudi Arabia

Priced option: Mar 2027 – Mar 2028

Event source: Valaris
Disclosed in report: 17 February 2026
Effective: 31 March 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

New source URL: Source URL

New document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

New page/section: Legacy Jackups

New excerpt: VALARIS 108 | KFELS MOD V-B | ARO Drilling | Saudi Arabia | Mar 27 | 12 months | Expect approx. 15 days out of service for planned maintenance in 2Q26. 1-year priced option

Before: No matching interval in the previous accepted report

After: ARO Drilling / Saudi Arabia · Mar 2027 – Mar 2028

New contract
Contract award announced

VALARIS DS-8

Shell / Brazil

New firm assignment: Mar 2027 – May 2029

Event source: Valaris
Disclosed in report: 17 February 2026
Effective: 1 March 2027

Evidence and before/after facts

Previous source: Valaris Fleet Status Report 2025-10-23 — Schedule not disclosed

Previous source URL: Source URL

Previous document hash: 6ea18934486e95aea21a7a05195d12815812621d6b783fecef72ea54d6f2e508

Previous page/section: Page not identified

Previous excerpt: No matching interval in the previous accepted report

New source: Valaris Fleet Status Report 2026-02-17 — Schedule not disclosed

New source URL: Source URL

New document hash: 90d64340ba6bd965092d3685f6bd38a3e9efef06f5572277671f5deebd7b032c

New page/section: Drillships

New excerpt: VALARIS DS-8 | Samsung GF12000 | Shell | Brazil | Mar 27 | May 29 | $428,000 | Plus mobilization fee of approx. $30 million. Contract includes additional services TCV of approx. $300 million, excluding additional services, based on estimated duration of 800 days. Options with a total estimated duration of approx. one year

Before: No matching interval in the previous accepted report

After: Shell / Brazil · Mar 2027 – May 2029