SignalSpore

SPACE DATA CENTERS
SUPPLIER INTELLIGENCE

SPACE COMPUTINGEvidence. Agreements. Progress.
← All projects

China · Space-computing hardware research prototype

UCloud / USST space-computing prototype

This project focuses on space-computing hardware research prototype.


UCloud and USST presented an integrated space-computing research prototype at WAIC on July 17, 2026. The university reports laboratory operation of coupled photovoltaic/battery power, GPU computing and pumped liquid thermal-control subsystems. It is an enabling ground prototype for extreme-environment research, not a launched satellite or operating orbital data center.

UCloud / University of Shanghai for Science and Technology · Ground prototype presented and laboratory operation reported

Scope: Enabling research · Named enabling computing, power and thermal hardware research. No defined shared orbital service platform or committed mission is established.

Full technical comparison, configurations and availability →

View all project relationship records →

Technical specifications not disclosed

Figures retain their disclosed units and scope. Launched hardware does not establish demonstrated performance; targets may change. Not disclosed means no figure in the reviewed sources.

PROJECT RELATIONSHIPS

Suppliers & project partners

University of Shanghai for Science and Technology

Research participant

Program organization: UCloud Technology Co., Ltd.

Partnership
Joint concept design, equipment integration and engineering verification of a space-computing ground prototype combining GPU computing, photovoltaic/battery power and fluid thermal control.

Joint research/development role, not a hardware procurement order or flight-host contract. No contract amount disclosed.

Announced 17 Jul 2026 · Evidence checked 1 Nov 2026

USST space-computing prototype release (opens in a new tab)
NEXT MILESTONE

Publish test conditions and quantitative results, then any mission-specific flight configuration and demonstration commitment.

Manual review 1 Nov 2026. Compared the university's July18 account with the current catalog. Added the distinct ground prototype, coupled power/GPU/fluid-cooling architecture and intended workloads. Lab operation does not establish flight or vacuum qualification. No GPU model, measured budgets, mission or financing transaction disclosed. Primary body last observed not available. Source monitoring: partial. Source collection and substantive profile review are separate checks. Plans and dates may change.

USST School of Energy and Power Engineering · July 18, 2026 (opens in a new tab)
WHAT REMAINS UNKNOWN
  • GPU model/count, arithmetic throughput, installed RAM/storage, electrical budgets and quantitative heat rejection are not disclosed.
  • Vacuum/microgravity test conditions, numerical operating limits, mass, dimensions and endurance are not established in the inspected university account.
  • No launch, orbit, host, mission procurement, customer service or financing transaction is identified. Xingtu is a future platform-integration reference, not a verified installed flight configuration.

Project updates

Verified announcements and milestones linked to this project, newest first.