SignalSpore

SPACE DATA CENTERS
SUPPLIER INTELLIGENCE

SPACE COMPUTINGEvidence. Agreements. Progress.
← All projects

Poland · Orbital edge-computing satellite

SatRev PW6U

This project focuses on processing data aboard a satellite.


SatRev's 6U Earth-observation satellite includes onboard AI and real-time image processing. POLSA places its deployment in the night of 28–29 November 2025, and RIDE! reported it in orbit on December 3. Mission disclosures specify RGB+NIR imaging at 5.8 m resolution from a 500 km design reference. Measured orbital computing performance and current operating status are unconfirmed.

SatRev · Reported deployed (28–29 November 2025)

Scope: Mission-specific processing · Onboard computing primarily supports the satellite's own Earth-observation imagery and mission services.

Full technical comparison, configurations and availability →

View all project relationship records →

Technical specifications not disclosed

Figures retain their disclosed units and scope. Launched hardware does not establish demonstrated performance; targets may change. Not disclosed means no figure in the reviewed sources.

PROJECT RELATIONSHIPS

Suppliers & project partners

NEXT MILESTONE

No dated next milestone disclosed; in-orbit image-processing results remain unverified.

Manual review 31 Oct 2026. Compared SatRev, RIDE and POLSA mission accounts with the undated platform brochure. Added image-processing and optical details and the November 28–29 deployment window. Brochure power, interfaces and radio options remain held outside the flight comparison. Primary body last observed 23 Oct, 09:49 UTC. Source monitoring: ongoing. Source collection and substantive profile review are separate checks. Plans and dates may change.

RIDE! / SatRev PW6U mission (opens in a new tab)
WHAT REMAINS UNKNOWN
  • Exact launch instant, launch vehicle and authoritative catalog identifier remain unestablished by the inspected primary sources. POLSA narrows deployment to the night of 28–29 November 2025.
  • Flight processor model, arithmetic throughput, installed RAM/storage, IT load and measured image-processing results remain unspecified. Brochure power and radio options are not mapped to the final flight configuration.
  • Current operating status, named hosted payloads, legal purchasing party and commercial terms remain unconfirmed.

Project updates

Verified announcements and milestones linked to this project, newest first.

PW6U reported in orbit (opens in a new tab)

RIDE! identified SatRev’s 6U mission, onboard AI and image processing, and launch integration with SEOPS. This is the announcement date; the exact launch date is not established here.